ADU rules in Arizona
Representative cities: Phoenix, Tucson.
ADU permit rule
Permit requiredGenerally allowedcity authority
Fee basis
Valuation-based; set by the issuing city.
Typical timeline
Phoenix ~30–90 days; Tucson ministerial review since the Nov 2024 UDC amendment.
Setback
Phoenix: 5 ft rear, 3 ft side (R1 zones); Tucson per the Unified Development Code.
Area threshold
Phoenix max 1,000 sq ft; Tucson allows ≥1 ADU per lot (up to 2 on lots with an existing home).
Exempt if
None — an ADU (casita) always requires a building permit.
Go / no-go
allowed
Arizona has no statewide ADU law. Phoenix and Tucson both allow ADUs by local ordinance; Tucson review is ministerial under state HB 2720.
ADU official sources: City of Phoenix — Planning & Development (Residential) · City of Tucson — Permit Exemptions & ADU
🧮
Estimate build cost
Model this ADU's construction cost by type, size & finish.
📊
Model rental ROI
Turn the build cost into rent, payback & 20-year cash flow.
Frequently asked questions
Do I need a permit to build an ADU in Arizona?
Per Arizona rules, an ADU is "yes" for a permit and the authority is "city". Arizona has no statewide ADU law. Phoenix and Tucson both allow ADUs by local ordinance; Tucson review is ministerial under state HB 2720. Always confirm with the issuing building department.
How big can an ADU be in Arizona?
Area threshold: Phoenix max 1,000 sq ft; Tucson allows ≥1 ADU per lot (up to 2 on lots with an existing home).
What are the ADU setbacks in Arizona?
Setback: Phoenix: 5 ft rear, 3 ft side (R1 zones); Tucson per the Unified Development Code.
How much does an ADU permit cost in Arizona?
Fee basis: Valuation-based; set by the issuing city.