Home / Permit Fee Estimator

Permit fee range estimator

Pick a state and a project to see the permit fee range we have on record, linked to its official source. Unlike a single national average, every figure here traces back to the issuing authority.

Exact permit fees are set by the local building department. WikEst shows the published or code-based range where one exists, linked to its official source — verify the final amount at the source before budgeting.

🏠 Accessory Dwelling Unit (ADU) permit fee in California

Permit requiredGenerally allowedcity authority
Permit fee range
Permit and plan-check fees set by the local jurisdiction; state law limits impact fees on ADUs. Verify with the city building department.
Typical timeline
~3–6 months for full plan review; many cities offer pre-approved plans or over-the-counter review.
Setback
State standard: 4 ft side/rear setback; local front/side yards still apply.
Exempt if
By-right up to 1,200 sq ft (≤800 sq ft for a 1-bedroom unit) under state law.

Exempt criteria: None — ADUs always require a building permit.

State law (Gov. Code §65852.2) requires cities to approve ADUs ministerially by right in most zones; local design review is limited to objective standards. Local fees, setbacks, and coastal/historic overlays still apply.

Representative cities for California: Los Angeles, San Francisco, San Diego.

All 20 project fee ranges in California

Official-source ranges where published; “By local jurisdiction” means no flat fee is published and the amount is set case by case.

ProjectPermit?AuthorityFee rangeGo / no-go
🏠 Accessory Dwelling Unit (ADU)yescityPermit and plan-check fees set by the local jurisdiction; state law limits impact fees on ADUs. Verify with the city building department.allowed
🪵 Deck / PorchconditionalcitySet by the city — typically a flat fee plus a valuation-based fee. Verify with the city building department.allowed
🧱 Fence / WallconditionalcityUsually no building permit under the height threshold; zoning setback rules apply. Verify locally.allowed
🛖 Shed / OutbuildingconditionalcityNo fee under the exemption; a permit fee applies if over the threshold.allowed
🪜 Basement FinishyescityValuation-based building permit fee. Verify with the city building department.allowed
🚗 Garage / CarportyescityValuation-based fee; flat plus per-square-foot. Verify with the city building department.allowed
☀️ Rooftop Solar PVyescityElectrical permit fee set by the city; state law requires streamlined review for agencies above 50,000 population.allowed
🌡️ HVAC ReplacementyescityMechanical permit fee set by the city. Verify with the city building department.allowed
🍳 Kitchen RemodelyescityBuilding + electrical + plumbing permit fees. Verify with the city building department.allowed
🛁 Bathroom RemodelyescityBuilding + plumbing + electrical fees. Verify with the city building department.allowed
🏗️ Room AdditionyescityValuation-based building permit; impact fees may apply. Verify with the city building department.allowed
🪟 Window / Door ReplacementconditionalcityPermit fee if changing the opening; in-kind swap is often Over-the-Counter.allowed
🏘️ Roof ReplacementconditionalcityRoofing permit fee set by the city; in-kind shingle re-roof may be Over-the-Counter.allowed
🅿️ Driveway / Parking PadconditionalcityNo building permit for private flatwork; a right-of-way/curb cut needs a separate permit.allowed
🏊 Swimming Pool / SpayescityBuilding permit + electrical; fee set by the city. Verify with the city building department.allowed
🧱 Retaining WallconditionalcityNo fee under the exemption; a permit applies if over the threshold.allowed
💥 Demolition / TeardownyescityDemolition permit fee set by the city/county building department; verify locally.allowed
🚰 Septic SystemyescountySeptic permit fees set by the local environmental health / wastewater agency; verify locally.allowed
🔌 EV ChargerconditionalcityElectrical permit fee set by the city; California law requires an expedited review process for EV charging stations.allowed
Standby GeneratoryescityElectrical (and often mechanical/gas) permit fee set by the city; verify locally.allowed

Permit fee questions

Are these permit fee numbers official?

Where a flat fee or a published fee schedule exists, we show that range and link to the issuing authority. Where no flat fee is published, the permit cost is set case by case and we say so rather than invent a number. Always confirm the final amount with your local building department.

Why does the same project cost differently by city?

Permit fees are set locally — by city, county, or state depending on the project and location — and often scale with project valuation or square footage. That is why WikEst shows the official source for each state and points you to the local office to verify.

What fees are not included in the permit fee?

Permit fees usually exclude separate costs such as impact fees, school/district assessments, utility connection charges, plan-review or expedite fees, and contractor labor. Those are set by different agencies and vary widely, so budget for them separately and verify locally.

Do I need a permit if the project is small?

Many projects are exempt below a size or valuation threshold (for example a short fence or a small shed), but thresholds differ by state and city. Check the project page for your state and confirm with the local authority before starting.

This is guidance, not legal or tax advice. Check a specific project →