🪵 Deck / Porch
An attached or freestanding outdoor platform, usually wood or composite, elevated above grade or at grade level.
Permit requirements for Deck / Porch differ by state and city. The table below summarizes the rule in each covered state — open a state for full detail, fees, and official sources.
| State | Permit? | Authority | Typical fee | Timeline | Go / No-Go | Key notes |
|---|---|---|---|---|---|---|
| California | Conditional | city | Set by the city — typically a flat fee plus a valuation-based fee. Verify with the city building department. | Same-day Over-the-Counter for low decks (SF); 2–4 weeks elsewhere. | Generally allowed | Attached decks and any deck over 30 in above grade need a permit. SF issues Over-the-Counter permits for decks less than 10 ft above grade that meet setbacks. Exempt: Decks over 30 in (760 mm) above grade require a permit; lower decks are often exempt. |
| Texas | Conditional | city | Set by the city — typically a flat plus valuation-based fee. Verify with the city building department. | 1–4 weeks. | Generally allowed | Attached decks or decks over 30 in above grade require a building permit. Exempt: Decks ≤30 in above grade are exempt (Houston IBC 105.2; Dallas same). |
| Florida | Conditional | city | Set by the city — typically a flat plus valuation-based fee. Verify with the city building department. | 1–4 weeks. | Generally allowed | Attached or raised decks need a building permit. Exempt: Decks >30 in above grade or attached require a permit (FBC R105). |
| New York | Conditional | city | Set by the city — typically a flat plus valuation-based fee. Verify with the city building department. | 1–4 weeks (NYC files through DOB NOW). | Generally allowed | Attached or raised decks need a permit; NYC requires a DOB filing. Exempt: Decks >30 in above grade require a permit (RCNYS R105). |
| Pennsylvania | Permit required | city | Municipal permit fee; Philadelphia EZ Permit available for eligible decks. | Philadelphia EZ Permits reviewed while you wait; standard permits ~15 business days. | Generally allowed | Attached decks and any deck more than 30 in above grade need a permit. Philadelphia offers an EZ Permit for residential decks up to 216 sq ft. |
| Illinois | Permit required | city | Chicago fees via online calculator; other municipalities set their own. | — | Generally allowed | Decks and porches require a permit (Chicago requires permits for decks/porches). Chicago offers an Express Permit for eligible deck work; most other IL towns follow IRC R105. |
| Ohio | Permit required | city | Columbus minimum permit fee $125; total scales with valuation. | Residential permits ~10 business days (Columbus BZS). | Generally allowed | Decks require a permit (Columbus lists deck/ramp permits). Attached decks and any deck more than 30 in above grade always require one. |
| Georgia | Permit required | city | Atlanta minimum permit cost $150 plus $25 technology fee; total scales with construction cost. | — | Generally allowed | Deck/patio additions require a permit (Atlanta lists deck/patio addition). Attached decks and decks over 30 in above grade always require one. |
| North Carolina | Permit required | city | Valuation-based building permit fee; Raleigh uses its Development Fee Guide / calculator. No flat statewide figure. | Plan review commonly 1–3 weeks; Mecklenburg targets ~7 business days for 1–2 family decks. | Generally allowed | Charlotte (Mecklenburg) and Raleigh both require a building permit for any deck/porch regardless of size or height. Footings must reach 12 in below grade; guards required at 30 in+. Exempt: State IRC R105.2 exempts only freestanding decks ≤200 sq ft, ≤30 in above grade, not serving egress — but Charlotte and Raleigh require a permit for ALL decks. |
| Michigan | Conditional | city | Valuation-based building permit; verify with the city. | Typically 5–15 business days; Detroit ~5 days. | Generally allowed | Footings must extend below the frost line — 42 in in the Detroit/Grand Rapids area. Guards required at 30 in+ above grade. Verify setback and lot coverage with the city. Exempt: State R105.2 exempts decks ≤200 sq ft, ≤30 in above grade, not attached, not within 36 in of the dwelling, and not serving egress. |
| New Jersey | Permit required | city | Construction permit based on valuation; plan review fee applies. Verify with the city. | Plan review commonly up to 20 business days; simple permits may be issued sooner. | Generally allowed | New decks require a UCC construction permit and zoning approval; plans by a NJ-licensed design professional are typically required. Newark footings are ~36 in. Repairs to existing decks are exempt if non-structural. Exempt: Newark requires a permit for attached or detached decks over 30 in high; Jersey City requires a permit for any new deck. |
| Virginia | Permit required | city | Building permit based on valuation plus a 2% state levy; verify with the city. | Virginia Beach initial online review targets 3 business days; typical issuance 10–15 business days. | Generally allowed | A building permit is required for new decks (Virginia Beach requires it for every deck, no size/height exemption). Inspections: footing, framing, final. Footings ~18 in in coastal Virginia. Exempt: Prince William: decks with floor ≥16.5 in above grade require a permit. Virginia Beach requires a permit for ALL decks regardless of size/height. |
| Washington | Conditional | city | Valuation-based; fee set by the issuing city. | Simple decks may be Subject-to-Field-Inspection; standard review 4–8 weeks. | Generally allowed | Attached decks and decks over 30 in above grade always require a permit. Exempt: Freestanding decks ≤30 in above grade and ≤200 sq ft are commonly exempt. |
| Arizona | Conditional | city | Valuation-based; Phoenix base building-permit fee is $150. | Over-the-counter or 1–3 weeks depending on complexity. | Generally allowed | Attached decks with a structural ledger connection should be verified with the building department. Exempt: Decks ≤30 in above grade (and not over a basement) are exempt. |
| Massachusetts | Conditional | city | Valuation-based; each city sets its own schedule. | Worcester: ~3–4 weeks; Boston: short-form fast, long-form several weeks. | Generally allowed | A licensed Construction Supervisor (CSL) is required unless the owner does the work on an owner-occupied home. Exempt: Decks ≤200 sq ft, ≤30 in above grade, not attached, not serving a required exit are exempt. |
| Tennessee | Conditional | city | Valuation-based; set by the issuing city/county. | Memphis OCCE ~5–10 business days for standard decks. | Generally allowed | Footing depth follows local frost line (shallow in Memphis, ~12 in Middle TN). Exempt: Decks ≤200 sq ft, ≤30 in above grade, not attached, not serving a required exit are exempt. |
| Indiana | Conditional | city | Set by the local building department. | — | Generally allowed | Attached decks and any deck over 30 in above grade need a permit. Indianapolis requires a structural permit for deck work. Exempt: Decks more than 30 in above grade generally require a building permit under the Indiana Residential Code (IRC R105.2). |
| Missouri | Conditional | city | Permit fees set locally by each municipality — verify with the city building department. | Varies by municipality — over-the-counter/simple permits often same-day to ~2 weeks. | Generally allowed | Kansas City adopted the 2018 IRC (effective 2020); St. Louis enforces the I-Codes locally. Exact thresholds follow local amendments — verify with your city. Exempt: Freestanding decks low to grade and not attached are generally exempt under the locally adopted IRC R105.2; attached decks and decks over 30 in require a permit. |
| Maryland | Conditional | city | Set by the city. | — | Generally allowed | Attached decks and decks over 30 in above grade need a permit. Annapolis publishes deck construction requirements. Exempt: Decks over 30 in above grade generally require a building permit under the IRC (adopted in MD as MBPS). |
| Wisconsin | Conditional | city | Permit fees set by each municipality — verify with the local building inspection department. | Varies by municipality — over-the-counter/simple permits often same-day to ~2 weeks. | Generally allowed | Milwaukee and Madison require a permit for decks attached to the dwelling or over 30 in above grade; footings are inspected for frost depth. Exempt: Freestanding decks low to grade and not attached are generally exempt under the UDC; attached decks and decks over 30 in require a permit. |