Residential permit rules in Texas

Representative cities: Houston, Dallas, Austin. Covers 16 common home projects.

Verify locally. Texas has no statewide residential building code — cities adopt the IRC (or IBC) locally with their own amendments. Permit requirements, fees, and code editions vary by city; verify with your city building department. Rules below are state/city-level guidance drawn from official sources — always confirm with the issuing building department before starting work. See the county permit authorities to find the right office.
ProjectPermit?AuthorityTypical feeTimelineGo / No-GoKey notes
🏠 Accessory Dwelling Unit (ADU)Permit requiredcityPermit and plan-review fees set by the city. Verify with the local building department.Varies by city; 2–8 weeks.RestrictedTexas has no statewide ADU mandate; ADUs are allowed only where the local ordinance permits (e.g., Austin, Houston, Dallas). Zoning, size caps, and parking rules apply.
Exempt: Allowed only where the local ordinance permits.
🪵 Deck / PorchConditionalcitySet by the city — typically a flat plus valuation-based fee. Verify with the city building department.1–4 weeks.Generally allowedAttached decks or decks over 30 in above grade require a building permit.
Exempt: Decks ≤30 in above grade are exempt (Houston IBC 105.2; Dallas same).
🧱 Fence / WallConditionalcityHouston: fee per city schedule where a permit is required. Verify locally.Houston: ~10 days for fence permits.Generally allowedHeight limits and front-yard rules are set by each city; HOA covenants may also apply.
Exempt: Houston: fences >8 ft or any masonry/concrete fence require a permit. Dallas: >6 ft (or >4 ft in a front yard) require a permit.
🛖 Shed / OutbuildingConditionalcityNo fee under the exemption; a permit fee applies if over the threshold.Same day / Over-the-Counter where required.Generally allowedLarger sheds or those with plumbing/electrical need a building permit.
Exempt: Dallas: utility building <200 sq ft needs no permit; generally a one-story detached structure ≤120 sq ft is exempt under the IRC.
🪜 Basement FinishPermit requiredcityValuation-based building permit fee. Verify with the city building department.2–6 weeks.Generally allowedUncommon in Texas; finishing a basement requires egress and permits.
Exempt: N/A
🚗 Garage / CarportPermit requiredcityValuation-based fee. Verify with the city building department.2–8 weeks.Generally allowedA new garage requires a building permit; Austin reviews to the 2024 IRC with local amendments.
Exempt: N/A
☀️ Rooftop Solar PVPermit requiredcityElectrical permit fee set by the city. Verify with the city building department.Often streamlined (1–3 days via SolarAPP+ where adopted); 2–4 weeks otherwise.Generally allowedRooftop PV requires an electrical permit; many Texas cities use SolarAPP+ for streamlined review.
Exempt: N/A
🌡️ HVAC ReplacementPermit requiredcityMechanical permit fee set by the city. Verify with the city building department.1–2 weeks.Generally allowedFurnace, AC, or heat-pump replacement requires a mechanical permit and inspection.
Exempt: N/A
🍳 Kitchen RemodelPermit requiredcityBuilding + electrical + plumbing permit fees. Verify with the city building department.2–6 weeks.Generally allowedMoving plumbing/electrical or walls triggers permits.
Exempt: N/A
🛁 Bathroom RemodelPermit requiredcityBuilding + plumbing + electrical fees. Verify with the city building department.2–6 weeks.Generally allowedPlumbing/electrical relocation requires permits.
Exempt: N/A
🏗️ Room AdditionPermit requiredcityValuation-based building permit; impact fees may apply. Verify with the city building department.3–8 weeks.Generally allowedExpanding the footprint requires full plan review and zoning compliance.
Exempt: N/A
🪟 Window / Door ReplacementConditionalcityPermit fee if changing the opening; in-kind swap is often exempt.Same day / Over-the-Counter where required.Generally allowedEnlarging openings or adding egress windows requires a permit.
Exempt: In-kind same-size replacement generally needs no permit.
🏘️ Roof ReplacementConditionalcityRoofing permit fee set by the city. Verify with the city building department.1–3 weeks.Generally allowedA full re-roof generally requires a roofing permit; structural deck damage requires a building permit.
Exempt: Dallas: re-roof of a single-family/duplex dwelling if value ≤$500 needs no permit.
🅿️ Driveway / Parking PadConditionalcityPrivate flatwork generally needs no building permit; floodplain/curb-cut work may be fee-based.Varies.Generally allowedHouston requires a floodplain development permit if the work is in a regulated floodplain (Chapter 19); a curb cut or right-of-way work needs a separate permit.
Exempt: Driveway not over 30 in above grade and off the right-of-way is generally exempt (Dallas).
🏊 Swimming Pool / SpaPermit requiredcityBuilding permit + electrical; fee set by the city. Verify with the city building department.3–8 weeks.Generally allowedIn-ground and most above-ground pools need a permit and barrier/fencing per local code.
Exempt: N/A
🧱 Retaining WallConditionalcityNo fee under the exemption; a permit applies if over the threshold.2–4 weeks if required.Generally allowedTaller walls or walls supporting a surcharge (driveway, structure, slope above) require design and a permit.
Exempt: Retaining walls not over 4 ft (bottom of footing to top) are exempt (Dallas; IRC 105.2).
The WikEst Editorial Team · Updated 2026-08-15
Compiled and reviewed by the WikEst editorial team from official state and municipal building-department publications.