Home / Projects / Bathroom Remodel

🛁 Bathroom Remodel

Renovating a bathroom — fixtures, tiling, ventilation, and sometimes relocating plumbing.

Permit requirements for Bathroom Remodel differ by state and city. The table below summarizes the rule in each covered state — open a state for full detail, fees, and official sources.
StatePermit?AuthorityTypical feeTimelineGo / No-GoKey notes
CaliforniaPermit requiredcityBuilding + plumbing + electrical fees. Verify with the city building department.2–6 weeks.Generally allowedVentilation (Title 24) and waterproofing are required; relocating plumbing needs permits.
Exempt: N/A
TexasPermit requiredcityBuilding + plumbing + electrical fees. Verify with the city building department.2–6 weeks.Generally allowedPlumbing/electrical relocation requires permits.
Exempt: N/A
FloridaPermit requiredcityBuilding + plumbing + electrical fees. Verify with the city building department.2–6 weeks.Generally allowedPlumbing/electrical relocation requires permits.
Exempt: N/A
New YorkPermit requiredcityBuilding + plumbing + electrical fees. Verify with the city building department.NYC: ALT2 review, several weeks.RestrictedNYC: bathroom renovation needs an ALT2 permit filed by a NYS-licensed PE or RA; fixture-only swaps may be exempt.
Exempt: N/A
PennsylvaniaPermit requiredcityBuilding permit fee; trade permits (plumbing/electrical) billed separately.Generally allowedA permit is required when relocating plumbing/electrical, moving walls, or changing fixtures. Cosmetic-only updates may be exempt.
IllinoisPermit requiredcityBuilding permit fee; trade permits billed separately.Generally allowedA permit is required when relocating plumbing/electrical, moving walls, or changing fixtures. Cosmetic-only updates may be exempt.
OhioPermit requiredcityBuilding permit fee; Columbus minimum $125, trade permits billed separately.Generally allowedA permit is required when relocating plumbing/electrical, moving walls, or changing fixtures. Cosmetic-only updates may be exempt.
GeorgiaPermit requiredcityBuilding permit fee; Atlanta minimum $150 plus $25 fee, trade permits billed separately.Generally allowedA permit is required when relocating plumbing/electrical, moving walls, or changing fixtures. Cosmetic-only updates may be exempt.
North CarolinaPermit requiredcityBuilding + trade permits based on valuation; verify with the city.Plan review typically 1–3 weeks plus trade inspections.Generally allowedBathroom remodels that move fixtures, add ventilation, or alter plumbing/electrical require permits.
Exempt: Any fixture relocation or new wet wall requires a permit.
MichiganPermit requiredcityBuilding + trade permits based on valuation; verify with the city.Plan review typically 1–3 weeks plus trade inspections.Generally allowedBathroom remodels that move fixtures, add ventilation, or alter plumbing/electrical require permits.
Exempt: Any fixture relocation or new wet wall requires a permit.
New JerseyPermit requiredcityConstruction + trade permits based on valuation; verify with the city.Plan review commonly up to 20 business days plus trade inspections.Generally allowedBathroom remodels that move fixtures, add ventilation, or alter plumbing/electrical require permits.
Exempt: Any fixture relocation or new wet wall requires a permit.
VirginiaPermit requiredcityBuilding + trade permits based on valuation; verify with the city.Plan review ~10 business days plus trade inspections.Generally allowedBathroom remodels that move fixtures, add ventilation, or alter plumbing/electrical require permits.
Exempt: Any fixture relocation or new wet wall requires a permit.
WashingtonConditionalcityValuation-based when plumbing is relocated.Standard review for permitted scopes.Generally allowedVentilation must meet code; exhaust to the exterior is required.
Exempt: Fixture-for-fixture swap in place is often exempt.
ArizonaConditionalcityValuation-based when plumbing is relocated.Standard review for permitted scopes.Generally allowedVentilation to the exterior is required.
Exempt: Fixture-for-fixture swap in place is often exempt.
MassachusettsConditionalcityValuation-based when plumbing is relocated.Standard review for permitted scopes.Generally allowedVentilation to the exterior is required.
Exempt: Fixture-for-fixture swap in place is often exempt.
TennesseeConditionalcityValuation-based when plumbing is relocated.Standard review for permitted scopes.Generally allowedVentilation to the exterior is required.
Exempt: Fixture-for-fixture swap in place is often exempt.
IndianaPermit requiredcityBuilding permit fee; trade permits (plumbing/electrical) billed separately.Generally allowedA permit is required when relocating plumbing/electrical, moving walls, or changing fixtures. Cosmetic-only updates may be exempt.
MissouriPermit requiredcityBuilding permit fee; trade permits (plumbing/electrical) billed separately.Varies by municipality — typically several weeks for full plan review.Generally allowedA permit is required when relocating plumbing/electrical, moving walls, or changing fixtures. Cosmetic-only updates may be exempt.
MarylandPermit requiredcityBuilding permit fee; trade permits billed separately.Generally allowedA permit is required when relocating plumbing/electrical, moving walls, or changing fixtures.
WisconsinPermit requiredcityBuilding permit fee; trade permits (plumbing/electrical) billed separately.Varies by municipality — typically several weeks for full plan review.Generally allowedA permit is required when relocating plumbing/electrical, moving walls, or changing fixtures. Cosmetic-only updates may be exempt.
The WikEst Editorial Team · Updated 2026-08-15
Compiled and reviewed by the WikEst editorial team from official state and municipal building-department publications.