🛁 Bathroom Remodel
Renovating a bathroom — fixtures, tiling, ventilation, and sometimes relocating plumbing.
Permit requirements for Bathroom Remodel differ by state and city. The table below summarizes the rule in each covered state — open a state for full detail, fees, and official sources.
| State | Permit? | Authority | Typical fee | Timeline | Go / No-Go | Key notes |
|---|---|---|---|---|---|---|
| California | Permit required | city | Building + plumbing + electrical fees. Verify with the city building department. | 2–6 weeks. | Generally allowed | Ventilation (Title 24) and waterproofing are required; relocating plumbing needs permits. Exempt: N/A |
| Texas | Permit required | city | Building + plumbing + electrical fees. Verify with the city building department. | 2–6 weeks. | Generally allowed | Plumbing/electrical relocation requires permits. Exempt: N/A |
| Florida | Permit required | city | Building + plumbing + electrical fees. Verify with the city building department. | 2–6 weeks. | Generally allowed | Plumbing/electrical relocation requires permits. Exempt: N/A |
| New York | Permit required | city | Building + plumbing + electrical fees. Verify with the city building department. | NYC: ALT2 review, several weeks. | Restricted | NYC: bathroom renovation needs an ALT2 permit filed by a NYS-licensed PE or RA; fixture-only swaps may be exempt. Exempt: N/A |
| Pennsylvania | Permit required | city | Building permit fee; trade permits (plumbing/electrical) billed separately. | — | Generally allowed | A permit is required when relocating plumbing/electrical, moving walls, or changing fixtures. Cosmetic-only updates may be exempt. |
| Illinois | Permit required | city | Building permit fee; trade permits billed separately. | — | Generally allowed | A permit is required when relocating plumbing/electrical, moving walls, or changing fixtures. Cosmetic-only updates may be exempt. |
| Ohio | Permit required | city | Building permit fee; Columbus minimum $125, trade permits billed separately. | — | Generally allowed | A permit is required when relocating plumbing/electrical, moving walls, or changing fixtures. Cosmetic-only updates may be exempt. |
| Georgia | Permit required | city | Building permit fee; Atlanta minimum $150 plus $25 fee, trade permits billed separately. | — | Generally allowed | A permit is required when relocating plumbing/electrical, moving walls, or changing fixtures. Cosmetic-only updates may be exempt. |
| North Carolina | Permit required | city | Building + trade permits based on valuation; verify with the city. | Plan review typically 1–3 weeks plus trade inspections. | Generally allowed | Bathroom remodels that move fixtures, add ventilation, or alter plumbing/electrical require permits. Exempt: Any fixture relocation or new wet wall requires a permit. |
| Michigan | Permit required | city | Building + trade permits based on valuation; verify with the city. | Plan review typically 1–3 weeks plus trade inspections. | Generally allowed | Bathroom remodels that move fixtures, add ventilation, or alter plumbing/electrical require permits. Exempt: Any fixture relocation or new wet wall requires a permit. |
| New Jersey | Permit required | city | Construction + trade permits based on valuation; verify with the city. | Plan review commonly up to 20 business days plus trade inspections. | Generally allowed | Bathroom remodels that move fixtures, add ventilation, or alter plumbing/electrical require permits. Exempt: Any fixture relocation or new wet wall requires a permit. |
| Virginia | Permit required | city | Building + trade permits based on valuation; verify with the city. | Plan review ~10 business days plus trade inspections. | Generally allowed | Bathroom remodels that move fixtures, add ventilation, or alter plumbing/electrical require permits. Exempt: Any fixture relocation or new wet wall requires a permit. |
| Washington | Conditional | city | Valuation-based when plumbing is relocated. | Standard review for permitted scopes. | Generally allowed | Ventilation must meet code; exhaust to the exterior is required. Exempt: Fixture-for-fixture swap in place is often exempt. |
| Arizona | Conditional | city | Valuation-based when plumbing is relocated. | Standard review for permitted scopes. | Generally allowed | Ventilation to the exterior is required. Exempt: Fixture-for-fixture swap in place is often exempt. |
| Massachusetts | Conditional | city | Valuation-based when plumbing is relocated. | Standard review for permitted scopes. | Generally allowed | Ventilation to the exterior is required. Exempt: Fixture-for-fixture swap in place is often exempt. |
| Tennessee | Conditional | city | Valuation-based when plumbing is relocated. | Standard review for permitted scopes. | Generally allowed | Ventilation to the exterior is required. Exempt: Fixture-for-fixture swap in place is often exempt. |
| Indiana | Permit required | city | Building permit fee; trade permits (plumbing/electrical) billed separately. | — | Generally allowed | A permit is required when relocating plumbing/electrical, moving walls, or changing fixtures. Cosmetic-only updates may be exempt. |
| Missouri | Permit required | city | Building permit fee; trade permits (plumbing/electrical) billed separately. | Varies by municipality — typically several weeks for full plan review. | Generally allowed | A permit is required when relocating plumbing/electrical, moving walls, or changing fixtures. Cosmetic-only updates may be exempt. |
| Maryland | Permit required | city | Building permit fee; trade permits billed separately. | — | Generally allowed | A permit is required when relocating plumbing/electrical, moving walls, or changing fixtures. |
| Wisconsin | Permit required | city | Building permit fee; trade permits (plumbing/electrical) billed separately. | Varies by municipality — typically several weeks for full plan review. | Generally allowed | A permit is required when relocating plumbing/electrical, moving walls, or changing fixtures. Cosmetic-only updates may be exempt. |