Residential permit rules in Washington

Representative cities: Seattle, Spokane. Covers 16 common home projects.

Verify locally. Washington uses the IRC-based State Building Code (WAC 51-51) with city amendments; Seattle and Spokane thresholds differ — confirm with the local building department before starting work. Rules below are state/city-level guidance drawn from official sources — always confirm with the issuing building department before starting work. See the county permit authorities to find the right office.
ProjectPermit?AuthorityTypical feeTimelineGo / No-GoKey notes
🏠 Accessory Dwelling Unit (ADU)Permit requiredcityValuation-based; Seattle SDCI issue fees scale with project value (no flat state fee).Seattle pre-approved DADU plans ~2–6 weeks; custom plans longer.Generally allowedWashington HB 1337 (2025) mandates ADUs; Seattle also allows two ADUs per lot. Owner-occupancy and extra parking are not required in Seattle.
Exempt: Statewide HB 1337 (eff. 2025) allows ≥1 ADU per lot; Seattle allows up to 2 ADUs.
🪵 Deck / PorchConditionalcityValuation-based; fee set by the issuing city.Simple decks may be Subject-to-Field-Inspection; standard review 4–8 weeks.Generally allowedAttached decks and decks over 30 in above grade always require a permit.
Exempt: Freestanding decks ≤30 in above grade and ≤200 sq ft are commonly exempt.
🧱 Fence / WallConditionalcityOften no building-permit fee when under the height threshold; zoning rules still apply.Typically no building permit below threshold; review only if over height.Generally allowedCorner lots have sight-triangle limits; Environmentally Critical Area (ECA) lots need a pre-application site visit.
Exempt: Seattle: no building permit for fences < 8 ft; Spokane generally requires a permit for new/replacement fences.
🛖 Shed / OutbuildingConditionalcityValuation-based when a permit is required; many small sheds are exempt.Exempt sheds need no review; others often Subject-to-Field-Inspection.Generally allowedLot-coverage and stormwater rules still apply even when a permit is not required.
Exempt: Seattle: one-story detached accessory building <120 sq ft roof area on slab-on-grade exempt; Spokane <200 sq ft exempt.
🪜 Basement FinishPermit requiredcityValuation-based; includes trade permits (electrical, plumbing).Standard review 4–8 weeks.Generally allowedBedrooms must have an emergency egress window (≥5.7 sq ft opening).
Exempt: Cosmetic-only finishing (paint, flooring) is exempt.
🚗 Garage / CarportPermit requiredcityValuation-based; includes trade permits.New structure review; complex projects 8–16 weeks.Generally allowedAttached and detached garages require a full building permit and plan review.
Exempt: No exemption — a new garage is a new structure.
☀️ Rooftop Solar PVPermit requiredcityBuilding + electrical permits; Seattle combined fees typically a few hundred dollars.Seattle Solar Express: same-day for standard residential PV <30 kW (RCW 64.40 / HB 1117).Generally allowedWashington HB 1117 requires expedited solar permitting; HOA solar restrictions are limited by RCW 64.38.055.
Exempt: No size exemption; systems >30 kW use the standard path.
🌡️ HVAC ReplacementPermit requiredcityMechanical (trade) permit; fee set by city.Trade permits often issued quickly; same-day in many cases.Generally allowedNew equipment must meet the Washington State Energy Code (WSEC-R).
Exempt: No exemption for equipment replacement.
🍳 Kitchen RemodelConditionalcityValuation-based when structural/plumbing/electrical work is included.Standard review 4–8 weeks for permitted scopes.Generally allowedVerify whether walls are load-bearing before any layout change.
Exempt: Cabinet/countertop swap in the same layout is exempt.
🛁 Bathroom RemodelConditionalcityValuation-based when plumbing is relocated.Standard review for permitted scopes.Generally allowedVentilation must meet code; exhaust to the exterior is required.
Exempt: Fixture-for-fixture swap in place is often exempt.
🏗️ Room AdditionPermit requiredcityValuation-based; includes trade permits.Complex review 8–16 weeks.Generally allowedMiddle-housing reforms (HB 1110) may allow more units by right; check zoning.
Exempt: No exemption — any new conditioned footprint requires a permit.
🪟 Window / Door ReplacementConditionalcityUsually no fee for in-kind swap; permit needed if opening is enlarged.In-kind swaps typically need no review.Generally allowedReplacement windows should meet U-factor requirements when the energy code is triggered.
Exempt: Same-size, in-kind replacement is generally exempt.
🏘️ Roof ReplacementConditionalcityOften Subject-to-Field-Inspection or exempt for same-footprint re-roof.STFI re-roofs can be approved same-day.Generally allowedSnow-load and seismic detailing apply in eastern WA (Spokane).
Exempt: Same-material, same-slope re-roof often exempt/STFI.
🅿️ Driveway / Parking PadConditionalcityBuilding permit often not required; curb-cut/right-of-way work is separate.Right-of-way permits reviewed by the city/utility.Generally allowedA separate right-of-way or utility permit is usually needed to cut the curb.
Exempt: Seattle: driveways <18 in above grade exempt from building permit; Spokane <30 in exempt.
🏊 Swimming Pool / SpaPermit requiredcityValuation-based; includes barrier/fencing review.Standard review; varies by city.Generally allowedWashington adopts the International Swimming Pool & Spa Code (WAC 51-50-3109); barrier fencing is mandatory.
Exempt: No exemption — pools/spas require a permit (incl. most above-ground).
🧱 Retaining WallConditionalcityValuation-based when over the height threshold.Over-threshold walls need plan review.Generally allowedWalls in Environmentally Critical Areas need a pre-application site visit.
Exempt: Walls <4 ft from bottom of footing are generally exempt.