Home / States / Georgia

Residential permit rules in Georgia

Representative cities: Atlanta, Savannah. Covers 16 common home projects.

Verify locally. Georgia's residential code (2024 IRC with Georgia Amendments, effective Jan 1, 2026) is mandatory statewide, but cities may add local amendments and zoning/permit fees vary. Verify with your local Office of Buildings (e.g., Atlanta or Savannah). Rules below are state/city-level guidance drawn from official sources — always confirm with the issuing building department before starting work. See the county permit authorities to find the right office.
ProjectPermit?AuthorityTypical feeTimelineGo / No-GoKey notes
🏠 Accessory Dwelling Unit (ADU)Permit requiredcityAtlanta minimum permit cost $150 plus $25 technology fee; total scales with cost of construction. Municipal fees vary.Case by caseGeorgia’s mandatory 2024 IRC with Georgia Amendments (eff. Jan 1, 2026) governs construction; ADUs need a building permit plus local zoning approval. Verify with your city (e.g., Atlanta Office of Buildings).
🪵 Deck / PorchPermit requiredcityAtlanta minimum permit cost $150 plus $25 technology fee; total scales with construction cost.Generally allowedDeck/patio additions require a permit (Atlanta lists deck/patio addition). Attached decks and decks over 30 in above grade always require one.
🧱 Fence / WallConditionalcityAtlanta minimum permit cost $150 plus $25 fee where a permit is required.Generally allowedMany Georgia municipalities exempt fences 6–7 ft or lower; some require a permit. Atlanta processes fence permits (Express allowed for certain stop-work-order fence fixes). Verify locally.
🛖 Shed / OutbuildingConditionalcityAtlanta minimum permit cost $150 plus $25 fee for permitted sheds.Generally allowedLarger sheds and any shed with utilities require a building permit. Savannah and other cities follow the Georgia State Minimum Standard Codes with local fee schedules.
Exempt: Under 120 sq ft typically exempt (IRC); Atlanta lists accessory shed structures as permitted.
🪜 Basement FinishPermit requiredcityAtlanta minimum permit cost $150 plus $25 fee; total scales with scope.Generally allowedFinishing a basement into habitable space requires permits for egress, framing, electrical, plumbing, and mechanical work. Sleeping rooms need code-compliant egress.
🚗 Garage / CarportPermit requiredcityAtlanta minimum permit cost $150 plus $25 fee; total scales with valuation.Generally allowedA new garage requires a building permit.
☀️ Rooftop Solar PVPermit requiredcityElectrical/structural permit fee; Atlanta minimum $150 plus $25 fee.Generally allowedRooftop solar PV requires an electrical and structural permit, filed via a standard/trade permit through the local Office of Buildings.
🌡️ HVAC ReplacementPermit requiredcityMechanical permit fee; Atlanta minimum $150 plus $25 fee.Generally allowedFurnace, AC, or heat-pump replacement requires a mechanical permit and inspection.
🍳 Kitchen RemodelPermit requiredcityBuilding permit fee; Atlanta minimum $150 plus $25 fee, trade permits billed separately.Generally allowedA permit is required when relocating plumbing/electrical, moving walls, or changing fixtures. Cosmetic-only work may be exempt.
🛁 Bathroom RemodelPermit requiredcityBuilding permit fee; Atlanta minimum $150 plus $25 fee, trade permits billed separately.Generally allowedA permit is required when relocating plumbing/electrical, moving walls, or changing fixtures. Cosmetic-only updates may be exempt.
🏗️ Room AdditionPermit requiredcityBuilding permit fee based on valuation; Atlanta minimum $150 plus $25 fee plus plan review.Generally allowedRoom additions change the footprint and require a full building permit, zoning approval, and usually a site plan.
🪟 Window / Door ReplacementConditionalcityAtlanta minimum permit cost $150 plus $25 fee where a permit is required.Generally allowedSwapping windows or exterior doors in the same opening is generally exempt; enlarging or adding openings requires a permit.
🏘️ Roof ReplacementPermit requiredcityRoof-covering permit fee; Atlanta minimum $150 plus $25 fee.Generally allowedRe-roofing is permitted (Atlanta Express covers re-roofing without structural change); minor repairs may be exempt.
🅿️ Driveway / Parking PadConditionalcityAtlanta minimum permit cost $150 plus $25 fee where a permit is required.Generally allowedA permit may be required where the driveway connects to the street/right-of-way or triggers an erosion/grading permit. Verify locally.
🏊 Swimming Pool / SpaPermit requiredcityBuilding permit fee; Atlanta minimum $150 plus $25 fee; barrier fencing required.Generally allowedPools require a separate permit and barrier fencing. Atlanta requires pool permits to be filed separately from any other permit application.
🧱 Retaining WallConditionalcityAtlanta minimum permit cost $150 plus $25 fee where a permit is required.Generally allowedHeight and whether the wall supports a surcharge (driveway, structure, or slope above) determine the permit threshold. Verify with your municipality.
The WikEst Editorial Team · Updated 2026-08-15
Compiled and reviewed by the WikEst editorial team from official state and municipal building-department publications.