Residential permit rules in Florida

Representative cities: Miami, Orlando, Tampa. Covers 16 common home projects.

Verify locally. Florida uses the statewide Florida Building Code (8th Ed., 2023), but Miami-Dade and Broward are the High-Velocity Hurricane Zone with stricter product-approval and impact-resistance rules. Local fees and zoning vary. Rules below are state/city-level guidance drawn from official sources — always confirm with the issuing building department before starting work. See the county permit authorities to find the right office.
ProjectPermit?AuthorityTypical feeTimelineGo / No-GoKey notes
🏠 Accessory Dwelling Unit (ADU)Permit requiredcityPermit and plan-review fees set by the city. Verify with the local building department.Varies by city; 2–8 weeks.RestrictedFlorida has no statewide by-right ADU mandate; ADUs are allowed only where the local ordinance permits, with size/setback set by that ordinance.
Exempt: Allowed where local zoning permits (e.g., Miami 21, Orlando, Tampa).
🪵 Deck / PorchConditionalcitySet by the city — typically a flat plus valuation-based fee. Verify with the city building department.1–4 weeks.Generally allowedAttached or raised decks need a building permit.
Exempt: Decks >30 in above grade or attached require a permit (FBC R105).
🧱 Fence / WallConditionalcityUsually no building permit under the height threshold; zoning setback rules apply. Verify locally.Same day / Over-the-Counter where required.Generally allowedHeight/setback set by local zoning; HOA rules may also apply.
Exempt: Typically no building permit under ~6 ft (zoning).
🛖 Shed / OutbuildingConditionalcityNo fee under the exemption; a permit fee applies if over the threshold.Same day / Over-the-Counter where required.Generally allowedLarger or serviced sheds need a building permit.
Exempt: One-story detached accessory structure ≤120 sq ft is exempt (FBC R105.2).
🪜 Basement FinishPermit requiredcityValuation-based building permit fee. Verify with the city building department.2–6 weeks.Generally allowedUncommon in Florida; finishing a basement requires egress and permits.
Exempt: N/A
🚗 Garage / CarportPermit requiredcityValuation-based fee. Verify with the city building department.2–8 weeks.Generally allowedA new garage requires a building permit under the Florida Building Code Residential.
Exempt: N/A
☀️ Rooftop Solar PVPermit requiredcityElectrical permit fee set by the city. Verify with the city building department.2–4 weeks.Generally allowedRooftop PV requires an electrical permit; products in the High-Velocity Hurricane Zone (Miami-Dade, Broward) require Florida Product Approval / NOA.
Exempt: N/A
🌡️ HVAC ReplacementPermit requiredcityMechanical permit fee set by the city. Verify with the city building department.1–2 weeks.Generally allowedFurnace, AC, or heat-pump replacement requires a mechanical permit and inspection.
Exempt: N/A
🍳 Kitchen RemodelPermit requiredcityBuilding + electrical + plumbing permit fees. Verify with the city building department.2–6 weeks.Generally allowedMoving plumbing/electrical or walls triggers permits.
Exempt: N/A
🛁 Bathroom RemodelPermit requiredcityBuilding + plumbing + electrical fees. Verify with the city building department.2–6 weeks.Generally allowedPlumbing/electrical relocation requires permits.
Exempt: N/A
🏗️ Room AdditionPermit requiredcityValuation-based building permit; impact fees may apply. Verify with the city building department.3–8 weeks.Generally allowedExpanding the footprint requires FBC plan review and zoning compliance.
Exempt: N/A
🪟 Window / Door ReplacementConditionalcityPermit fee if changing the opening; in-kind swap is often exempt.Same day / Over-the-Counter where required.RestrictedIn the HVHZ (Miami-Dade, Broward) windows within 1 mile of the coast must be impact-rated / Florida Product-Approved. Enlarging openings needs a permit.
Exempt: In-kind same-size replacement generally needs no permit.
🏘️ Roof ReplacementPermit requiredcityRoofing permit fee set by the city. Verify with the city building department.1–3 weeks.Generally allowedRe-roofing requires a roofing permit; the HVHZ requires product-approved materials.
Exempt: N/A
🅿️ Driveway / Parking PadConditionalcityPrivate flatwork generally needs no building permit; right-of-way/curb cut needs a separate permit.Varies.Generally allowedA curb cut or work in the public right-of-way requires a separate permit from the city / public works.
Exempt: N/A
🏊 Swimming Pool / SpaPermit requiredcityBuilding permit + electrical; fee set by the city. Verify with the city building department.3–8 weeks.Generally allowedPools require a permit and barrier per FBC Section 454 / R4101 (self-closing gate, alarms, entrapment protection).
Exempt: N/A
🧱 Retaining WallConditionalcityNo fee under the exemption; a permit applies if over the threshold.2–4 weeks if required.Generally allowedTaller or surcharge-supporting walls need design and a permit.
Exempt: Retaining walls ≤4 ft (bottom of footing to top), not supporting a surcharge, are exempt (FBC R105.2).
The WikEst Editorial Team · Updated 2026-08-15
Compiled and reviewed by the WikEst editorial team from official state and municipal building-department publications.