Residential permit rules in Michigan

Representative cities: Detroit, Grand Rapids. Covers 16 common home projects.

Verify locally. Michigan enforces the 2015 Michigan Residential Code statewide (administered by LARA); municipalities issue permits and may add local amendments. Footings must reach below the local frost line (≈42 in around Detroit/Grand Rapids). Always confirm exact requirements and fees with Detroit or Grand Rapids before starting work. Rules below are state/city-level guidance drawn from official sources — always confirm with the issuing building department before starting work. See the county permit authorities to find the right office.
ProjectPermit?AuthorityTypical feeTimelineGo / No-GoKey notes
🏠 Accessory Dwelling Unit (ADU)Permit requiredcityBuilding permit based on project valuation; verify with the city. Detroit issues residential permits in about 5 days.Typically 5–15 business days; Detroit ~5 days, Grand Rapids 5–10 days for simple projects.Generally allowedADUs are allowed in Michigan subject to local zoning. A building permit and zoning approval are required; some cities cap size and occupant/rental rules. Confirm with Detroit or Grand Rapids planning.
Exempt: No state size exemption for an ADU (it is habitable space).
🪵 Deck / PorchConditionalcityValuation-based building permit; verify with the city.Typically 5–15 business days; Detroit ~5 days.Generally allowedFootings must extend below the frost line — 42 in in the Detroit/Grand Rapids area. Guards required at 30 in+ above grade. Verify setback and lot coverage with the city.
Exempt: State R105.2 exempts decks ≤200 sq ft, ≤30 in above grade, not attached, not within 36 in of the dwelling, and not serving egress.
🧱 Fence / WallConditionalcityTypically a zoning/building permit fee; verify with the city.Often issued in days to 1–2 weeks.Generally allowedMichigan exempts fences up to 7 ft under the state code, but cities set their own height/yard limits and may require a zoning review. Always check local ordinance and HOA.
Exempt: State R105.2 exempts fences 7 ft high or less (Detroit: 7 ft or less, not in a Special Review District).
🛖 Shed / OutbuildingConditionalcityValuation-based where required; structures <200 sq ft often use a lower-compliance permit.Often 5–10 business days; smaller sheds may be issued faster.Generally allowedSmall detached storage sheds are usually exempt, but adding electricity/plumbing or exceeding 200 sq ft triggers a permit. Confirm setbacks with the city.
Exempt: State R105.2 exempts one-story detached accessory structures ≤200 sq ft. Grand Rapids: <200 sq ft = Planning Accessory Structure Permit; ≥200 sq ft = building permit.
🪜 Basement FinishPermit requiredcityValuation-based building permit; verify with the city.Plan review typically 2–4 weeks plus inspections.Generally allowedConverting a basement to living space requires permits for framing, egress, electrical, plumbing, and mechanical. Egress windows are required for bedrooms.
Exempt: n/a
🚗 Garage / CarportPermit requiredcityValuation-based building permit; verify with the city.Plan review typically 2–4 weeks plus inspections.Generally allowedNew detached or attached garages and carports require a building permit and zoning/setback review.
Exempt: Detroit exempts detached accessory structures ≤200 sq ft; new garages over that need a permit.
☀️ Rooftop Solar PVPermit requiredcityElectrical (and structural) permit per city schedule; verify locally.Often 1–3 weeks; some jurisdictions expedite residential PV.Generally allowedResidential rooftop solar PV requires an electrical (and often structural/mechanical) permit plus utility interconnection approval.
Exempt: Any grid-tied rooftop PV system requires a permit.
🌡️ HVAC ReplacementPermit requiredcityMechanical permit fee per city schedule; verify locally.Usually 1–2 weeks; light plan review, straightforward inspection.Generally allowedReplacing or upgrading HVAC equipment requires a mechanical permit and inspection before energizing.
Exempt: Any furnace, AC, or heat-pump replacement/installation requires a permit.
🍳 Kitchen RemodelPermit requiredcityBuilding + trade permits based on valuation; verify with the city.Plan review typically 2–4 weeks plus trade inspections.Generally allowedKitchen remodels moving plumbing/electrical or altering walls require building, plumbing, and electrical permits.
Exempt: Any layout/plumbing/electrical change requires a permit.
🛁 Bathroom RemodelPermit requiredcityBuilding + trade permits based on valuation; verify with the city.Plan review typically 1–3 weeks plus trade inspections.Generally allowedBathroom remodels that move fixtures, add ventilation, or alter plumbing/electrical require permits.
Exempt: Any fixture relocation or new wet wall requires a permit.
🏗️ Room AdditionPermit requiredcityBuilding permit based on valuation plus trade permits; verify with the city.Plan review typically 3–6 weeks plus multiple inspections.Generally allowedRoom additions change the footprint and require foundation, framing, egress, and trade reviews. Historic districts need a Certificate of Appropriateness.
Exempt: Any new conditioned square footage requires a full permit.
🪟 Window / Door ReplacementConditionalcityBuilding permit (alteration) where required; verify with the city.Often 1–2 weeks; many window jobs are issued without plan review.Generally allowedReplacing windows/doors in the same opening is typically exempt; enlarging an opening or cutting a new one requires a permit.
Exempt: In-kind replacement in the same opening is often exempt.
🏘️ Roof ReplacementPermit requiredcityBuilding permit (re-roof) per city schedule; verify locally.Often 1–2 weeks; inspection after decking/underlayment and after shingles.Generally allowedDetroit requires a permit for roof replacement. Other jurisdictions vary — verify locally before starting.
Exempt: Detroit requires a permit for roof replacement (removal of substantial shingles).
🅿️ Driveway / Parking PadConditionalcityPermit fee where required; verify locally.Often 1–2 weeks; right-of-way review can add time.Generally allowedNew or widened driveways, curb cuts, and right-of-way work typically require a permit and possibly stormwater review.
Exempt: State R105.2 exempts sidewalks/driveways ≤30 in above adjacent grade and not over a basement.
🏊 Swimming Pool / SpaConditionalcityBuilding + electrical permit per city schedule; verify locally.Plan review typically 2–4 weeks plus inspections.Generally allowedPools require a building permit and code-compliant barrier (self-closing/self-latching gate). Electrical permit for wiring.
Exempt: State R105.2 exempts prefab pools <24 in deep, ≤5,000 gal, installed entirely above ground.
🧱 Retaining WallConditionalcityBuilding permit where required; verify with the city.1–3 weeks; walls over threshold may need engineered drawings.Generally allowedRetaining walls holding more than 4 ft of fill require a permit and often professional design. Check HOA and drainage too.
Exempt: State R105.2 exempts retaining walls ≤4 ft measured from bottom of footing to top (unless supporting a surcharge).
The WikEst Editorial Team · Updated 2026-08-15
Compiled and reviewed by the WikEst editorial team from official state and municipal building-department publications.