Home / States / New Hampshire

Residential permit rules in New Hampshire

Representative cities: Manchester, Nashua. Covers 20 common home projects.

Verify locally. New Hampshire enforces a MANDATORY statewide building code (2021 IRC/IBC and related codes with NH amendments under RSA 155-A, effective July 1, 2024). Permits are issued by local building departments; towns without a local inspector are served by the State Fire Marshal’s Office (NH Division of Fire Safety). Local ordinances may be stricter than the state minimum. Rules below are state/city-level guidance drawn from official sources — always confirm with the issuing building department before starting work. See the county permit authorities to find the right office.
ProjectPermit?AuthorityTypical feeTimelineGo / No-GoKey notes
🏠 Accessory Dwelling Unit (ADU)Permit requiredcityGenerally allowedNew Hampshire has no statewide by-right ADU law; whether an ADU is allowed depends on local zoning. The structure itself requires a building permit under the state residential code regardless of town ordinance.
Exempt: No statewide ADU mandate; an ADU is a dwelling unit and requires a building permit.
🪵 Deck / PorchConditionalcityGenerally allowedNew Hampshire footings must extend to frost depth (commonly 48 in). Even exempt low decks must meet zoning setbacks. Verify the threshold with your local building department — some towns permit any attached deck.
Exempt: Decks ≤30 in above adjacent grade and (in most towns) ≤200 sq ft are exempt from a building permit.
🧱 Fence / WallConditionalcityGenerally allowedPool-enclosure fences must meet the adopted pool/spa code barrier requirements. Zoning (height, sight triangles, corner lots) is separate from the building-permit exemption.
Exempt: Fences not over 7 ft in height are exempt from a building permit under IRC R105.2.
🛖 Shed / OutbuildingConditionalcityGenerally allowedEven exempt sheds must meet property setbacks and lot-coverage rules. Adding utilities (electrical/plumbing) always requires separate trade permits.
Exempt: One-story detached accessory structures ≤120 sq ft (IRC R105.2) are commonly exempt from a building permit; observed local thresholds range 100–200 sq ft.
🪜 Basement FinishPermit requiredcityGenerally allowedBasement finishes require egress windows for bedrooms, plus electrical, HVAC, and any structural permits; vapor-barrier/insulation rules apply under the NH energy code.
Exempt: Cosmetic finishing (paint, flooring) is exempt.
🚗 Garage / CarportPermit requiredcityGenerally allowedSetbacks, lot coverage, and energy-code compliance are reviewed. Repair of an existing garage may be exempt.
Exempt: New detached structures over the local accessory-exemption size require a permit.
☀️ Rooftop Solar PVPermit requiredcityGenerally allowedStructural review accounts for NH ground-snow loads (40–100+ psf by town) and 48-in frost-depth footings for ground mounts.
Exempt: No size exemption; rooftop PV always permitted.
🌡️ HVAC ReplacementConditionalcityGenerally allowedNH requires licensed mechanical/electrical contractors for the work; equipment must meet current energy-code efficiency rules.
Exempt: In-kind replacement in the exact location may be treated as repair; verify with the local official.
🍳 Kitchen RemodelConditionalcityGenerally allowedNH energy code is triggered on remodels (insulation, window U-factor, HVAC). Verify scope with the local building department.
Exempt: Cabinet/countertop swap in the same layout is exempt.
🛁 Bathroom RemodelConditionalcityGenerally allowedExterior ventilation is required. Licensed plumbers must pull the plumbing permit.
Exempt: Fixture-for-fixture swap in place is often exempt.
🏗️ Room AdditionPermit requiredcityGenerally allowedPlan review covers setbacks, lot coverage, energy code, and structural/frost-depth footings.
Exempt: No exemption — any new conditioned footprint requires a permit.
🪟 Window / Door ReplacementConditionalcityGenerally allowedReplacement products should meet energy-code U-factor when the code is triggered. Licensed contractors pull trade permits.
Exempt: Same-size, in-kind replacement is generally exempt.
🏘️ Roof ReplacementConditionalcityGenerally allowedLocal practice varies — e.g., Hampton Falls exempts in-kind roofing, while Plaistow requires a permit for roof replacement. Confirm with your town.
Exempt: Same-footprint, in-kind re-roof is often exempt/over-the-counter.
🅿️ Driveway / Parking PadConditionalcityGenerally allowedA separate driveway/right-of-way permit is usually needed to cut the curb or connect to the street.
Exempt: Replacing a driveway in the same footprint (no new curb cut) is generally exempt.
🏊 Swimming Pool / SpaPermit requiredcityGenerally allowedBarrier/ fencing and electrical bonding are reviewed; pool-barrier requirements apply in every jurisdiction.
Exempt: No exemption — all pools/spas require a permit (NH adopts the 2021 ISPSC).
🧱 Retaining WallConditionalcityGenerally allowedLocal towns may set a stricter height (e.g., Plaistow lists hardscaping under 6 ft as exempt from a building permit). Verify with your building department.
Exempt: Retaining walls not over 4 ft (measured bottom of footing to top) are exempt.
💥 Demolition / TeardownPermit requiredcityDemolition permit fee set by the issuing authority; verify locally.Generally allowedA full teardown or major strip-out requires a demolition (building) permit. Demolition permits commonly require proof of utility disconnects (water, gas, electric, sewer) and may require asbestos/lead-paint clearance for pre-1978 homes before work begins. Verify the issuing authority for your specific property.
🚰 Septic SystemPermit requiredstateSeptic permit/approval fee set by NH DES; residential system application fees are based on design flow.Generally allowedNew or replacement onsite wastewater (septic) systems require an Approval for Septic System Construction from the New Hampshire Department of Environmental Services (NH DES Subsurface Systems Bureau), followed by an Approval for Operation before use. A soil/perc evaluation and engineered design are required; licensed designers prepare the plans and licensed installers perform the work, and the system is inspected by a NH DES regional inspector before backfill.
🔌 EV ChargerConditionalcityElectrical permit; fee set by the issuing authority.Generally allowedA home EV charging station (240V branch circuit + wall-mounted EVSE) requires an electrical permit and must meet the NEC (Article 625). Many jurisdictions fast-track residential EVSE. A load calculation and possible service upgrade are reviewed.
Standby GeneratorConditionalcityMechanical/electrical permit; fee set by the issuing authority.Generally allowedA permanently installed standby generator requires mechanical and electrical permits (transfer switch, fuel gas/propane line). Setback, carbon-monoxide ventilation, and noise rules apply; some HOAs restrict generator placement.

Frequently asked questions

Do I need a building permit for home projects in New Hampshire?

Most structural, electrical, plumbing, and mechanical work does. The project table above shows New Hampshire-specific permit requirements for 20 common home projects. Always confirm with the local building department before starting.

Who issues building permits in New Hampshire?

New Hampshire permit authorities are typically city or county building departments. Use the county permit authority lookup to find the exact office for your property.

Which home projects are exempt from permits in New Hampshire?

Common baseline exemptions apply widely: detached sheds ≤120 sq ft, fences ≤6–7 ft, decks ≤30 in above grade, same-footprint re-roofs, and in-kind window/door swaps. New Hampshire or your city may amend these — verify locally.

How much does a permit cost in New Hampshire?

Permit fees are set by each city or county and scale with project valuation; there is no single New Hampshire statewide fee. Open the official authority link on this page for the local fee schedule.

The WikEst Editorial Team · Updated 2026-08-15
Compiled and reviewed by the WikEst editorial team from official state and municipal building-department publications.