Residential permit rules in New York
Representative cities: New York City, Buffalo. Covers 16 common home projects.
| Project | Permit? | Authority | Typical fee | Timeline | Go / No-Go | Key notes |
|---|---|---|---|---|---|---|
| 🏠 Accessory Dwelling Unit (ADU) | Permit required | city | Permit and plan-review fees set by the city. Verify with the local building department. | Varies by city; NYC ADU filings may take several weeks. | Restricted | New York has no statewide by-right ADU mandate; ADUs are allowed where local law permits (e.g., the NYC ADU program, Buffalo). Zoning applies. Exempt: Allowed only where the local law permits. |
| 🪵 Deck / Porch | Conditional | city | Set by the city — typically a flat plus valuation-based fee. Verify with the city building department. | 1–4 weeks (NYC files through DOB NOW). | Generally allowed | Attached or raised decks need a permit; NYC requires a DOB filing. Exempt: Decks >30 in above grade require a permit (RCNYS R105). |
| 🧱 Fence / Wall | Conditional | city | Usually no building permit under local height limits; zoning setback rules apply. Verify locally. | Same day / Over-the-Counter where required. | Generally allowed | Height/front-yard rules set by local zoning and HOA covenants. Exempt: Typically no building permit under local height limits (zoning). |
| 🛖 Shed / Outbuilding | Conditional | city | No fee under the exemption; a permit fee applies if over the threshold. | Same day / Over-the-Counter where required. | Generally allowed | Larger or serviced sheds need a building permit. Exempt: One-story detached accessory structure ≤120 sq ft is exempt (RCNYS R105.2). |
| 🪜 Basement Finish | Permit required | city | Valuation-based building permit fee. Verify with the city building department. | 2–6 weeks. | Generally allowed | Finishing a basement requires egress (RCNYS R310) and permits; a sleeping room needs a code-compliant egress window. Exempt: N/A |
| 🚗 Garage / Carport | Permit required | city | Valuation-based fee. Verify with the city building department. | 2–8 weeks. | Generally allowed | A new garage requires a building permit under the RCNYS / NYC Building Code. Exempt: N/A |
| ☀️ Rooftop Solar PV | Permit required | city | Electrical permit fee set by the city. Verify with the city building department. | 2–4 weeks (NYC files through DOB NOW). | Generally allowed | Rooftop PV requires an electrical permit; NYC files through DOB NOW. Exempt: N/A |
| 🌡️ HVAC Replacement | Permit required | city | Mechanical permit fee set by the city. Verify with the city building department. | 1–2 weeks. | Generally allowed | Furnace, AC, or heat-pump replacement requires a mechanical permit and inspection. Exempt: N/A |
| 🍳 Kitchen Remodel | Permit required | city | Building + electrical + plumbing permit fees. Verify with the city building department. | NYC: ALT2 review, several weeks. | Restricted | NYC: kitchen/bath renovation needs an ALT2 permit filed by a NYS-licensed PE or RA; upstate follows similar building-permit rules. Exempt: N/A |
| 🛁 Bathroom Remodel | Permit required | city | Building + plumbing + electrical fees. Verify with the city building department. | NYC: ALT2 review, several weeks. | Restricted | NYC: bathroom renovation needs an ALT2 permit filed by a NYS-licensed PE or RA; fixture-only swaps may be exempt. Exempt: N/A |
| 🏗️ Room Addition | Permit required | city | Valuation-based building permit; impact fees may apply. Verify with the city building department. | 3–8 weeks. | Generally allowed | Expanding the footprint requires full plan review; NYC uses New Building / ALT1 filings. Exempt: N/A |
| 🪟 Window / Door Replacement | Conditional | city | Permit fee if changing the opening; in-kind swap is often exempt. | Same day / Over-the-Counter where required. | Generally allowed | Enlarging openings or changes to means of egress need a permit (NYC PE/RA filing). Exempt: In-kind same-size replacement generally needs no permit. |
| 🏘️ Roof Replacement | Conditional | city | Roofing permit fee set by the city. Verify with the city building department. | 1–3 weeks. | Generally allowed | Re-roofing generally requires a permit; NYC requires a roofing permit. Minor repair may be exempt. Exempt: N/A |
| 🅿️ Driveway / Parking Pad | Conditional | city | Private flatwork generally needs no building permit; curb cut / right-of-way needs a separate permit. | Varies. | Generally allowed | A curb cut or work in the public right-of-way requires a separate permit from the city / public works. Exempt: N/A |
| 🏊 Swimming Pool / Spa | Permit required | city | Building permit + electrical; fee set by the city. Verify with the city building department. | 3–8 weeks. | Generally allowed | Pools require a permit and barrier per RCNYS R328 (barrier, alarms, entrapment protection). Exempt: N/A |
| 🧱 Retaining Wall | Conditional | city | No fee under the exemption; a permit applies if over the threshold. | 2–4 weeks if required. | Generally allowed | Taller or surcharge-supporting walls need design and a permit. Exempt: Retaining walls ≤4 ft (bottom of footing to top), not supporting a surcharge, are exempt (RCNYS R105.2). |