Home / ADU / Washington ADU rules

ADU rules in Washington

Representative cities: Seattle, Spokane.

Verify locally. Washington uses the IRC-based State Building Code (WAC 51-51) with city amendments; Seattle and Spokane thresholds differ — confirm with the local building department before starting work. ADU rules below are drawn from official sources — always confirm with the issuing building department before designing or building.

ADU permit rule

Permit requiredGenerally allowedcity authority
Fee basis
Valuation-based; Seattle SDCI issue fees scale with project value (no flat state fee).
Typical timeline
Seattle pre-approved DADU plans ~2–6 weeks; custom plans longer.
Setback
Seattle: 5 ft rear (0 ft where lot abuts an alley); varies by city/zone.
Area threshold
Statewide HB 1337 (eff. 2025) allows ≥1 ADU per lot; Seattle allows up to 2 ADUs.
Exempt if
None — a building permit is always required for an ADU.
Go / no-go
allowed
Washington HB 1337 (2025) mandates ADUs; Seattle also allows two ADUs per lot. Owner-occupancy and extra parking are not required in Seattle.

Frequently asked questions

Do I need a permit to build an ADU in Washington?

Per Washington rules, an ADU is "yes" for a permit and the authority is "city". Washington HB 1337 (2025) mandates ADUs; Seattle also allows two ADUs per lot. Owner-occupancy and extra parking are not required in Seattle. Always confirm with the issuing building department.

How big can an ADU be in Washington?

Area threshold: Statewide HB 1337 (eff. 2025) allows ≥1 ADU per lot; Seattle allows up to 2 ADUs.

What are the ADU setbacks in Washington?

Setback: Seattle: 5 ft rear (0 ft where lot abuts an alley); varies by city/zone.

How much does an ADU permit cost in Washington?

Fee basis: Valuation-based; Seattle SDCI issue fees scale with project value (no flat state fee).