Building permits in Los Angeles County, California

Find the right authority before you build. Los Angeles County permitting follows California law — here is exactly who issues the permit and where to start.

County + cities (mixed)

Los Angeles County Public Works — Building & Safety

In unincorporated Los Angeles County, building permits are issued by LA County Public Works – Building & Safety (via the EPIC-LA online portal). Within the 88 incorporated cities (Los Angeles, Long Beach, Santa Monica, Pasadena, etc.) the city building department issues the permit.

Open the official permit portal →

Unincorporated-area permits and inspections are handled through the EPIC-LA portal (pw.lacounty.gov/permits/epicla).
County vs. city. Project-specific permit rules below follow California state law and are shown for reference. Whether the county or your city issues the permit depends on whether your property is in an incorporated city or unincorporated Los Angeles County — see the authority note above and confirm with the issuing department.

Permit cheat-sheet (California rules)

ProjectPermit?AuthorityTypical feeTimelineGo / No-GoKey notes
🏠 Accessory Dwelling Unit (ADU)Permit requiredcityPermit and plan-check fees set by the local jurisdiction; state law limits impact fees on ADUs. Verify with the city building department.~3–6 months for full plan review; many cities offer pre-approved plans or over-the-counter review.Generally allowedState law (Gov. Code §65852.2) requires cities to approve ADUs ministerially by right in most zones; local design review is limited to objective standards. Local fees, setbacks, and coastal/historic overlays still apply.
Exempt: By-right up to 1,200 sq ft (≤800 sq ft for a 1-bedroom unit) under state law.
🪵 Deck / PorchConditionalcitySet by the city — typically a flat fee plus a valuation-based fee. Verify with the city building department.Same-day Over-the-Counter for low decks (SF); 2–4 weeks elsewhere.Generally allowedAttached decks and any deck over 30 in above grade need a permit. SF issues Over-the-Counter permits for decks less than 10 ft above grade that meet setbacks.
Exempt: Decks over 30 in (760 mm) above grade require a permit; lower decks are often exempt.
🧱 Fence / WallConditionalcityUsually no building permit under the height threshold; zoning setback rules apply. Verify locally.SF: Over-the-Counter same day for fences over the threshold.Generally allowedHeight and front-yard limits are set by local zoning; masonry or sight-obstruction fences near intersections may need review. HOA covenants may also apply.
Exempt: No permit for fences under ~6 ft in side/rear yards (SF: ≤6 ft side/rear, ≤3 ft front exempt).
🛖 Shed / OutbuildingConditionalcityNo fee under the exemption; a permit fee applies if over the threshold.Over-the-Counter / same day where a permit is required.Generally allowedLarger or occupied/serviced sheds require a building permit. Check local setbacks and HOA rules.
Exempt: One-story detached accessory structure ≤120 sq ft is exempt (CBC R105.2).
🪜 Basement FinishPermit requiredcityValuation-based building permit fee. Verify with the city building department.2–6 weeks.Generally allowedFinishing a basement adds habitable space and triggers egress requirements (CBC R310); a sleeping room needs a code-compliant egress window.
Exempt: N/A
🚗 Garage / CarportPermit requiredcityValuation-based fee; flat plus per-square-foot. Verify with the city building department.2–8 weeks.Generally allowedA new detached or attached garage requires a full building permit; conversions of an existing, legally established garage may be exempt if no structural change occurs.
Exempt: N/A
☀️ Rooftop Solar PVPermit requiredcityElectrical permit fee set by the city; state law requires streamlined review for agencies above 50,000 population.Streamlined (often 1–3 days via SolarAPP+ where adopted); 2–4 weeks otherwise.Generally allowedRooftop PV requires an electrical permit. California requires local agencies above 50,000 population to provide streamlined solar permitting.
Exempt: N/A
🌡️ HVAC ReplacementPermit requiredcityMechanical permit fee set by the city. Verify with the city building department.1–2 weeks.Generally allowedFurnace, AC, or heat-pump replacement requires a mechanical permit and California Title 24 energy compliance.
Exempt: N/A
🍳 Kitchen RemodelPermit requiredcityBuilding + electrical + plumbing permit fees. Verify with the city building department.2–6 weeks.Generally allowedMoving plumbing/electrical or walls triggers permits; California Title 24 appliance and ventilation requirements apply.
Exempt: N/A
🛁 Bathroom RemodelPermit requiredcityBuilding + plumbing + electrical fees. Verify with the city building department.2–6 weeks.Generally allowedVentilation (Title 24) and waterproofing are required; relocating plumbing needs permits.
Exempt: N/A
🏗️ Room AdditionPermit requiredcityValuation-based building permit; impact fees may apply. Verify with the city building department.3–8 weeks.Generally allowedExpanding the footprint requires full plan review, zoning compliance with setbacks, and Title 24.
Exempt: N/A
🪟 Window / Door ReplacementConditionalcityPermit fee if changing the opening; in-kind swap is often Over-the-Counter.SF: same-day Over-the-Counter in-kind replacement.Generally allowedChanging the opening size or adding egress windows requires a permit; replacement must meet the energy code.
Exempt: In-kind replacement (same size/location) typically needs no permit.
🏘️ Roof ReplacementConditionalcityRoofing permit fee set by the city; in-kind shingle re-roof may be Over-the-Counter.SF: same-day Over-the-Counter reroofing.Generally allowedRe-roofing usually requires a permit; structural deck replacement triggers a full building permit.
Exempt: Tear-off / re-roof is generally permitted work.
🅿️ Driveway / Parking PadConditionalcityNo building permit for private flatwork; a right-of-way/curb cut needs a separate permit.Varies.Generally allowedA curb cut or work in the public right-of-way requires a separate permit from the city / public works.
Exempt: N/A
🏊 Swimming Pool / SpaPermit requiredcityBuilding permit + electrical; fee set by the city. Verify with the city building department.3–8 weeks.Generally allowedPools require a permit and a compliant barrier (CBC Chapter 42 / Health & Safety Code §115920): self-closing/self-latching gate and alarms.
Exempt: N/A
🧱 Retaining WallConditionalcityNo fee under the exemption; a permit applies if over the threshold.2–4 weeks if required.Generally allowedWalls over 4 ft or supporting a surcharge (deck, vehicle, structure) require design and a permit.
Exempt: Retaining walls ≤4 ft (measured bottom of footing to top), not supporting a surcharge, are exempt (CBC R105.2).
The WikEst Editorial Team · Updated 2026-08-15
Compiled and reviewed by the WikEst editorial team from official state and municipal building-department publications.