Building permits in Miami-Dade County, Florida

Find the right authority before you build. Miami-Dade County permitting follows Florida law — here is exactly who issues the permit and where to start.

County + cities (mixed)

Miami-Dade County Department of Regulatory and Economic Resources — Building

Miami-Dade County’s Building department issues permits for unincorporated Miami-Dade and also processes municipal building permits for many municipalities that contract with the county (via the e-permitting / plan-tracking system). Some municipalities run their own building departments. Verify whether your property is in an unincorporated area or a contracting municipality.

Open the official permit portal →

Permit applications, plan tracking and inspections use the Miami-Dade Building permit portal (miamidade.gov/building/plantrack.asp). Contractors can use e-Permits for work not requiring plan review.
County vs. city. Project-specific permit rules below follow Florida state law and are shown for reference. Whether the county or your city issues the permit depends on whether your property is in an incorporated city or unincorporated Miami-Dade County — see the authority note above and confirm with the issuing department.

Permit cheat-sheet (Florida rules)

ProjectPermit?AuthorityTypical feeTimelineGo / No-GoKey notes
🏠 Accessory Dwelling Unit (ADU)Permit requiredcityPermit and plan-review fees set by the city. Verify with the local building department.Varies by city; 2–8 weeks.RestrictedFlorida has no statewide by-right ADU mandate; ADUs are allowed only where the local ordinance permits, with size/setback set by that ordinance.
Exempt: Allowed where local zoning permits (e.g., Miami 21, Orlando, Tampa).
🪵 Deck / PorchConditionalcitySet by the city — typically a flat plus valuation-based fee. Verify with the city building department.1–4 weeks.Generally allowedAttached or raised decks need a building permit.
Exempt: Decks >30 in above grade or attached require a permit (FBC R105).
🧱 Fence / WallConditionalcityUsually no building permit under the height threshold; zoning setback rules apply. Verify locally.Same day / Over-the-Counter where required.Generally allowedHeight/setback set by local zoning; HOA rules may also apply.
Exempt: Typically no building permit under ~6 ft (zoning).
🛖 Shed / OutbuildingConditionalcityNo fee under the exemption; a permit fee applies if over the threshold.Same day / Over-the-Counter where required.Generally allowedLarger or serviced sheds need a building permit.
Exempt: One-story detached accessory structure ≤120 sq ft is exempt (FBC R105.2).
🪜 Basement FinishPermit requiredcityValuation-based building permit fee. Verify with the city building department.2–6 weeks.Generally allowedUncommon in Florida; finishing a basement requires egress and permits.
Exempt: N/A
🚗 Garage / CarportPermit requiredcityValuation-based fee. Verify with the city building department.2–8 weeks.Generally allowedA new garage requires a building permit under the Florida Building Code Residential.
Exempt: N/A
☀️ Rooftop Solar PVPermit requiredcityElectrical permit fee set by the city. Verify with the city building department.2–4 weeks.Generally allowedRooftop PV requires an electrical permit; products in the High-Velocity Hurricane Zone (Miami-Dade, Broward) require Florida Product Approval / NOA.
Exempt: N/A
🌡️ HVAC ReplacementPermit requiredcityMechanical permit fee set by the city. Verify with the city building department.1–2 weeks.Generally allowedFurnace, AC, or heat-pump replacement requires a mechanical permit and inspection.
Exempt: N/A
🍳 Kitchen RemodelPermit requiredcityBuilding + electrical + plumbing permit fees. Verify with the city building department.2–6 weeks.Generally allowedMoving plumbing/electrical or walls triggers permits.
Exempt: N/A
🛁 Bathroom RemodelPermit requiredcityBuilding + plumbing + electrical fees. Verify with the city building department.2–6 weeks.Generally allowedPlumbing/electrical relocation requires permits.
Exempt: N/A
🏗️ Room AdditionPermit requiredcityValuation-based building permit; impact fees may apply. Verify with the city building department.3–8 weeks.Generally allowedExpanding the footprint requires FBC plan review and zoning compliance.
Exempt: N/A
🪟 Window / Door ReplacementConditionalcityPermit fee if changing the opening; in-kind swap is often exempt.Same day / Over-the-Counter where required.RestrictedIn the HVHZ (Miami-Dade, Broward) windows within 1 mile of the coast must be impact-rated / Florida Product-Approved. Enlarging openings needs a permit.
Exempt: In-kind same-size replacement generally needs no permit.
🏘️ Roof ReplacementPermit requiredcityRoofing permit fee set by the city. Verify with the city building department.1–3 weeks.Generally allowedRe-roofing requires a roofing permit; the HVHZ requires product-approved materials.
Exempt: N/A
🅿️ Driveway / Parking PadConditionalcityPrivate flatwork generally needs no building permit; right-of-way/curb cut needs a separate permit.Varies.Generally allowedA curb cut or work in the public right-of-way requires a separate permit from the city / public works.
Exempt: N/A
🏊 Swimming Pool / SpaPermit requiredcityBuilding permit + electrical; fee set by the city. Verify with the city building department.3–8 weeks.Generally allowedPools require a permit and barrier per FBC Section 454 / R4101 (self-closing gate, alarms, entrapment protection).
Exempt: N/A
🧱 Retaining WallConditionalcityNo fee under the exemption; a permit applies if over the threshold.2–4 weeks if required.Generally allowedTaller or surcharge-supporting walls need design and a permit.
Exempt: Retaining walls ≤4 ft (bottom of footing to top), not supporting a surcharge, are exempt (FBC R105.2).
The WikEst Editorial Team · Updated 2026-08-15
Compiled and reviewed by the WikEst editorial team from official state and municipal building-department publications.