Home / Counties / Hawaii / Honolulu County

Building permits in Honolulu County, Hawaii

Find the right authority before you build. Honolulu County permitting follows Hawaii law — here is exactly who issues the permit and where to start.

County issues permits

City and County of Honolulu — Dept. of Planning & Permitting (DPP)

Hawaii has no incorporated municipalities. On Oahu the City and County of Honolulu Dept. of Planning & Permitting (DPP) is the sole building-permit authority for the entire county, issuing building, electrical, mechanical, and plumbing permits.

Open the official permit portal →

Permits, plan review, and inspections are handled through the Honolulu Internet Permit System (HIPS) and the DPP permit centers in Honolulu and Kapolei.
County vs. city. Project-specific permit rules below follow Hawaii state law and are shown for reference. Whether the county or your city issues the permit depends on whether your property is in an incorporated city or unincorporated Honolulu County — see the authority note above and confirm with the issuing department.

Permit cheat-sheet (Hawaii rules)

ProjectPermit?AuthorityTypical feeTimelineGo / No-GoKey notes
🏠 Accessory Dwelling Unit (ADU)Permit requiredcountyValuation-based; set by the county building department (R-3 / U occupancy schedule).Plan review typically several weeks; varies by county workload.Generally allowedHawaii’s statewide ADU law (Act 50, 2008) allows one accessory dwelling unit per single-family lot; the four counties administer permits and set local size/setback rules. Owner-occupancy and parking standards vary by county.
Exempt: Statewide ADU law allows one ADU per single-family lot; counties set size limits (commonly 400–1,000 sq ft by county).
🪵 Deck / PorchConditionalcountyValuation-based; set by the county building department.Plan review for permitted decks; over-the-counter for simple low platforms where exempt.Generally allowedAll structural lumber above ground must be preservative-treated for Formosan termite resistance per Hawaii’s amended code; wind-load design (105–170 mph gusts by location) applies. Verify with the county building department.
Exempt: Platforms, walks, and driveways not more than 30 in above grade and not over a basement are exempt.
🧱 Fence / WallConditionalcountyPermit fee set by county; many low fences are exempt from a building permit.Exempt fences need no permit; over-height fences go through plan review.Generally allowedVegetation-clearing, shoreline setback, and Special Management Area (SMA) review can add requirements even for exempt fences. Verify with the county.
Exempt: Honolulu & Hawaii County: fences/walls over 6 ft require a permit; Maui allows up to 7 ft before a permit. Walls over 30 in (Honolulu) need a permit.
🛖 Shed / OutbuildingConditionalcountyValuation-based; Hawaii County charges $10 per 100 sq ft for U-occupancy accessory structures.Exempt sheds need no permit; permitted sheds go through plan review.Generally allowedAgricultural buildings may be exempt under HRS §46-88 (up to 1,000 sq ft nonresidential). Verify with the county building department.
Exempt: One-story detached accessory buildings (storage sheds, tool sheds, playhouses) ≤120 sq ft are exempt in all four counties.
🪜 Basement FinishPermit requiredcountyValuation-based; includes trade permits.Standard plan review where basements are constructed.Generally allowedBasements are uncommon in Hawaii, but the same permitting logic applies when one is built or finished. Verify with the county building department.
Exempt: Cosmetic finishing (paint, flooring) is exempt.
🚗 Garage / CarportPermit requiredcountyValuation-based; includes trade permits.New-structure plan review; varies by county.Generally allowedAttached and detached garages require a full building permit and plan review. Verify with the county building department.
Exempt: New detached structures over 120 sq ft require a permit (smaller are still subject to zoning).
☀️ Rooftop Solar PVPermit requiredcountyBuilding + electrical permits; fee set by county.Counties offer expedited/solar-specific review for standard rooftop PV.Generally allowedProvide racking structural design for tile or flat-roof installations; meet hurricane/wind uplift requirements. Verify with the county building department.
Exempt: No size exemption; large/ground-mounted systems need structural review.
🌡️ HVAC ReplacementConditionalcountyMechanical permit; fee set by county (Maui lists Motors & HVAC trade permits).Trade permits often issued same-day or over-the-counter.Generally allowedEquipment must meet current energy-efficiency and mechanical code requirements. Verify with the county building department.
Exempt: In-kind replacement in the same location may be exempt; verify with the county.
🍳 Kitchen RemodelConditionalcountyValuation-based when structural/plumbing/electrical work is included.Standard review for permitted scopes.Generally allowedHawaii’s energy code is reviewed on remodels (insulation, window U-factor, HVAC). Verify with the county building department.
Exempt: Cabinet/countertop swap in the same layout is exempt.
🛁 Bathroom RemodelConditionalcountyValuation-based when plumbing is relocated.Standard review for permitted scopes.Generally allowedVentilation to the exterior is required. Verify with the county building department.
Exempt: Fixture-for-fixture swap in place is often exempt.
🏗️ Room AdditionPermit requiredcountyValuation-based; includes trade permits.County plan review; multiple inspections.Generally allowedLot-coverage, shoreline/SMA, and energy-code compliance are reviewed. Verify with the county building department.
Exempt: No exemption — any new conditioned footprint requires a permit.
🪟 Window / Door ReplacementConditionalcountyUsually no fee for in-kind swap; permit needed if opening is enlarged.In-kind swaps typically need no review.Generally allowedReplacement products should meet energy-code U-factor when the code is triggered. Verify with the county building department.
Exempt: Same-size, in-kind replacement is generally exempt.
🏘️ Roof ReplacementConditionalcountyOften exempt/over-the-counter for same-footprint re-roof; fee set by county if required.Same-material re-roof is typically exempt or over-the-counter.Generally allowedCounties list re-roofing with same/similar material for R-3/U occupancies as exempt. Verify with the county building department.
Exempt: Same-material, same-slope re-roof often exempt.
🅿️ Driveway / Parking PadConditionalcountyBuilding permit often not required; curb-cut/right-of-way work is separate.Right-of-way permits reviewed by the county.Generally allowedA separate right-of-way permit is usually needed to cut the curb or connect to the street. Verify with the county.
Exempt: Platforms, walks, and driveways not more than 30 in above grade are exempt.
🏊 Swimming Pool / SpaPermit requiredcountyValuation-based; includes barrier/fencing and electrical bonding review.Plan review; barrier inspection required before filling.Generally allowedHawaii follows the IRC barrier requirements (4 ft minimum, no climbable openings). Verify with the county building department.
Exempt: In-ground, >3 ft deep, or >5,000 gal pools always require a permit; above-ground prefab <24 in deep (or <5,000 gal, Maui) may be exempt.
🧱 Retaining WallConditionalcountyValuation-based when over the height threshold.Over-threshold walls need plan review.Generally allowedWalls in hillside/SMA zones have stricter rules. Verify with the county building department.
Exempt: Walls with ≤3 ft of retained earth and ≤6 ft total height (not supporting a surcharge or impounding liquids) are exempt.
💥 Demolition / TeardownPermit requiredcountyDemolition permit fee set by the issuing authority; verify locally.Generally allowedA full teardown or major strip-out requires a demolition (building) permit. Demolition permits commonly require proof of utility disconnects (water, gas, electric, sewer) and may require asbestos/lead-paint clearance for pre-1978 homes before work begins. Verify the issuing authority for your specific property.
🚰 Septic SystemPermit requiredstateSeptic permit fee set by the state environmental/health authority; engineered systems cost more.Generally allowedNew or replacement onsite wastewater (septic) systems require a permit from the Hawaii Department of Health Wastewater Branch. A soil/perc evaluation and engineered design are typically required; licensed installers perform the work and the system is inspected before backfill.
🔌 EV ChargerConditionalcountyElectrical permit; fee set by the issuing authority.Generally allowedA home EV charging station (240V branch circuit + wall-mounted EVSE) requires an electrical permit and must meet the NEC (Article 625). Many jurisdictions fast-track residential EVSE. A load calculation and possible service upgrade are reviewed.
Standby GeneratorConditionalcountyMechanical/electrical permit; fee set by the issuing authority.Generally allowedA permanently installed standby generator requires mechanical and electrical permits (transfer switch, fuel gas/propane line). Setback, carbon-monoxide ventilation, and noise rules apply; some HOAs restrict generator placement.

Frequently asked questions

Who issues building permits in Honolulu County, Hawaii?

City and County of Honolulu — Dept. of Planning & Permitting (DPP) is the permitting authority for Honolulu County. The county issues permits for both unincorporated areas and incorporated cities. Start at the official portal linked above.

Do I go to the county or my city for a building permit in Honolulu County?

The county issues permits for both unincorporated areas and incorporated cities.

What home projects need a permit in Honolulu County?

The same project types shown in the cheat-sheet above (ADU, deck, fence, shed, solar, and more) — rules follow Hawaii state law. Whether the county or your city issues it depends on your property's incorporation status.

How do I apply for a permit in Honolulu County?

Use the official permit portal linked above. Most offices accept online submissions; have your plans, site information, and contractor details ready before applying.

The WikEst Editorial Team · Updated 2026-08-15
Compiled and reviewed by the WikEst editorial team from official state and municipal building-department publications.