Building permits in Bonneville County, Idaho

Find the right authority before you build. Bonneville County permitting follows Idaho law — here is exactly who issues the permit and where to start.

County + cities (mixed)

Bonneville County — Planning & Zoning (Building Division) (and City of Idaho Falls Building Department)

In unincorporated Bonneville County, building permits are issued by the Bonneville County Planning & Zoning (Building Division). Within the City of Idaho Falls (and other incorporated cities such as Ammon) the municipal building department issues the permit. Note: as of January 2026 Bonneville County also processes electrical and plumbing permits locally.

Open the official permit portal →

County vs. city. Project-specific permit rules below follow Idaho state law and are shown for reference. Whether the county or your city issues the permit depends on whether your property is in an incorporated city or unincorporated Bonneville County — see the authority note above and confirm with the issuing department.

Permit cheat-sheet (Idaho rules)

ProjectPermit?AuthorityTypical feeTimelineGo / No-GoKey notes
🏠 Accessory Dwelling Unit (ADU)Permit requiredcityValuation-based; set by the issuing city or, in unincorporated areas, by Idaho DOPL.Plan review typically 1–3 weeks in Treasure Valley cities.Generally allowedIdaho has no single statewide ADU mandate; cities adopt ADU rules by local ordinance. Boise and other growing cities allow ADUs subject to zoning. Verify with the local building department.
Exempt: No statewide size exemption; local zoning sets ADU size and lot limits.
🪵 Deck / PorchConditionalcityValuation-based; set by the issuing city.Over-the-counter or plan review depending on complexity.Generally allowedAttached decks with a structural ledger connection should be verified with the building department; mountain areas require local snow-load design.
Exempt: Decks ≤30 in above grade (not serving as an exit) are exempt under the Idaho Residential Code.
🧱 Fence / WallConditionalcityMost low fences are exempt; over-height fences follow the city valuation-based permit fee.Over-height fences go through plan review.Generally allowedUtility locates (811) and property-line verification are required before digging. Verify with the local building department.
Exempt: Most Idaho cities exempt fences ≤6 ft; Boise exempts fences <7 ft (front-yard fences often limited to 4 ft).
🛖 Shed / OutbuildingConditionalcityValuation-based; set by the issuing city (small sheds often exempt).Exempt sheds need no permit; permitted sheds go through plan review.Generally allowedEven exempt sheds must meet zoning setbacks and local snow-load design (20 psf in the Treasure Valley, much higher in mountain areas). Verify with the local building department.
Exempt: Idaho Residential Code exempts one-story detached accessory structures ≤200 sq ft (storage, no plumbing/electrical). Some cities use a 120 sq ft threshold.
🪜 Basement FinishPermit requiredcityValuation-based; includes trade permits.Standard plan review.Generally allowedBasement finishing requires permits when it creates habitable space. Verify with the local building department.
Exempt: Cosmetic finishing (paint, flooring) is exempt.
🚗 Garage / CarportPermit requiredcityValuation-based; includes trade permits.New-structure plan review; varies by city.Generally allowedAttached and detached garages require a full building permit and plan review. Verify with the local building department.
Exempt: New detached structures over the exemption threshold (120–200 sq ft) require a permit.
☀️ Rooftop Solar PVPermit requiredcityBuilding + electrical permits; Boise residential solar PV plan-review/inspection fee ~$165.Residential PV is typically expedited; Boise reviews standard rooftop systems quickly.Generally allowedElectrical permits are handled by Idaho DOPL (or the city where it has trade jurisdiction). Verify with the local building department.
Exempt: No size exemption; large/ground-mounted systems need structural review.
🌡️ HVAC ReplacementConditionalcityMechanical permit; fee set by city or Idaho DOPL (trade permit).Trade permits often issued same-day.Generally allowedHomeowners may pull their own HVAC permit on a primary residence in many Idaho jurisdictions. Verify with the local building department.
Exempt: In-kind replacement in the same location may be exempt; verify locally.
🍳 Kitchen RemodelConditionalcityValuation-based when structural/plumbing/electrical work is included.Standard review for permitted scopes.Generally allowedIdaho’s energy code is reviewed on remodels. Verify with the local building department.
Exempt: Cabinet/countertop swap in the same layout is exempt.
🛁 Bathroom RemodelConditionalcityValuation-based when plumbing is relocated.Standard review for permitted scopes.Generally allowedVentilation to the exterior is required. Verify with the local building department.
Exempt: Fixture-for-fixture swap in place is often exempt.
🏗️ Room AdditionPermit requiredcityValuation-based; includes trade permits.City plan review; multiple inspections.Generally allowedLot-coverage and energy-code compliance are reviewed. Verify with the local building department.
Exempt: No exemption — any new conditioned footprint requires a permit.
🪟 Window / Door ReplacementConditionalcityUsually no fee for in-kind swap; permit needed if opening is enlarged.In-kind swaps typically need no review.Generally allowedReplacement products should meet energy-code U-factor when the code is triggered. Verify with the local building department.
Exempt: Same-size, in-kind replacement is generally exempt.
🏘️ Roof ReplacementConditionalcityOften exempt/over-the-counter for same-footprint re-roof; fee set by city if required.Same-material re-roof is often exempt or over-the-counter.Generally allowedLocal snow-load design applies to any structural roof change. Verify with the local building department.
Exempt: Same-material, same-slope re-roof often exempt under the IRC.
🅿️ Driveway / Parking PadConditionalcityBuilding permit often not required; curb-cut/right-of-way work is separate.Right-of-way permits reviewed by the city/county.Generally allowedA separate right-of-way permit is usually needed to cut the curb or connect to the street. Verify with the local building department.
Exempt: Slabs/walks/driveways not more than 30 in above grade (and not over a basement) are exempt; concrete slabs are commonly exempt.
🏊 Swimming Pool / SpaPermit requiredcityValuation-based; includes barrier/fencing and electrical bonding review.Plan review; barrier inspection required before filling.Generally allowedIdaho follows IRC barrier requirements (4 ft minimum, no climbable openings). Verify with the local building department.
Exempt: Above-ground prefab pools <24 in deep and <5,000 gal (R-3) are typically exempt.
🧱 Retaining WallConditionalcityValuation-based when over the height threshold.Over-threshold walls need plan review.Generally allowedWalls in hillside/WUI zones have stricter rules. Verify with the local building department.
Exempt: Walls ≤4 ft (measured from bottom of footing to top) and not supporting a surcharge are commonly exempt.
💥 Demolition / TeardownPermit requiredcityDemolition permit fee set by the issuing authority; verify locally.Generally allowedA full teardown or major strip-out requires a demolition (building) permit. Demolition permits commonly require proof of utility disconnects (water, gas, electric, sewer) and may require asbestos/lead-paint clearance for pre-1978 homes before work begins. Verify the issuing authority for your specific property.
🚰 Septic SystemPermit requiredcountySeptic permit fee set by the local environmental/health authority; engineered systems cost more.Generally allowedNew or replacement onsite wastewater (septic) systems require a permit from the state environmental/health department (or local health district). A soil/perc evaluation and engineered design are typically required; licensed installers perform the work and the system is inspected before backfill.
🔌 EV ChargerConditionalcityElectrical permit; fee set by the issuing authority.Generally allowedA home EV charging station (240V branch circuit + wall-mounted EVSE) requires an electrical permit and must meet the NEC (Article 625). Many jurisdictions fast-track residential EVSE. A load calculation and possible service upgrade are reviewed.
Standby GeneratorConditionalcityMechanical/electrical permit; fee set by the issuing authority.Generally allowedA permanently installed standby generator requires mechanical and electrical permits (transfer switch, fuel gas/propane line). Setback, carbon-monoxide ventilation, and noise rules apply; some HOAs restrict generator placement.

Frequently asked questions

Who issues building permits in Bonneville County, Idaho?

Bonneville County — Planning & Zoning (Building Division) (and City of Idaho Falls Building Department) is the permitting authority for Bonneville County. Permitting is split — cities issue for incorporated areas, the county for unincorporated areas. Start at the official portal linked above.

Do I go to the county or my city for a building permit in Bonneville County?

Permitting is split — cities issue for incorporated areas, the county for unincorporated areas.

What home projects need a permit in Bonneville County?

The same project types shown in the cheat-sheet above (ADU, deck, fence, shed, solar, and more) — rules follow Idaho state law. Whether the county or your city issues it depends on your property's incorporation status.

How do I apply for a permit in Bonneville County?

Use the official permit portal linked above. Most offices accept online submissions; have your plans, site information, and contractor details ready before applying.

The WikEst Editorial Team · Updated 2026-08-15
Compiled and reviewed by the WikEst editorial team from official state and municipal building-department publications.