Home / Counties / Kansas / Johnson County

Building permits in Johnson County, Kansas

Find the right authority before you build. Johnson County permitting follows Kansas law — here is exactly who issues the permit and where to start.

County + cities (mixed)

Johnson County — Building Codes & Permits (and incorporated-city building departments)

In unincorporated Johnson County, building permits are issued by Johnson County Building Codes & Permits. Within incorporated cities such as Overland Park, Olathe, and Shawnee the municipal building department issues the permit.

Open the official permit portal →

Johnson County administers the Kansas statewide building code for its unincorporated area through its Building Codes division.
County vs. city. Project-specific permit rules below follow Kansas state law and are shown for reference. Whether the county or your city issues the permit depends on whether your property is in an incorporated city or unincorporated Johnson County — see the authority note above and confirm with the issuing department.

Permit cheat-sheet (Kansas rules)

ProjectPermit?AuthorityTypical feeTimelineGo / No-GoKey notes
🏠 Accessory Dwelling Unit (ADU)ConditionalcityValuation-based; set by the issuing city.Case by caseKansas has no statewide residential code; whether ADUs are allowed is purely local. Some Kansas cities permit ADUs by ordinance, others do not. Confirm with the city planning department.
Exempt: Local limits vary.
🪵 Deck / PorchConditionalcityValuation-based; set by the issuing city.Wichita 5-10 business days typical.Generally allowedFootings must extend below the local frost line (24-36 in across Kansas).
Exempt: Overland Park requires a permit for all new/replacement decks; Wichita requires a permit for decks over 30 in above grade.
🧱 Fence / WallConditionalcityVaries by city; some cities exempt low fences.Often same-day/over-the-counter.Generally allowedPool-enclosure fences must meet barrier requirements. Verify locally.
Exempt: Overland Park requires a fence permit; Wichita generally exempts fences unless over ~7-8 ft.
🛖 Shed / OutbuildingConditionalcityValuation-based; set by the issuing city.Small sheds often same-day/over-the-counter.Generally allowedEven when exempt, the shed must meet zoning setbacks and HOA rules.
Exempt: Overland Park: detached accessory structures over 200 sq ft need a permit. Wichita: <=200 sq ft (city) / <=400 sq ft (unincorporated) exempt.
🪜 Basement FinishConditionalcityValuation-based; includes trade permits.Standard plan review 2-4 weeks.Generally allowedAdding a bedroom requires an egress window. Basements are common in Kansas.
Exempt: Cosmetic finishing (paint, flooring) is exempt.
🚗 Garage / CarportPermit requiredcityValuation-based; includes trade permits.New-structure plan review; varies by city.Generally allowedAttached and detached garages require a full building permit and plan review where a code is adopted.
Exempt: Detached garages over local accessory-structure limits need a permit.
☀️ Rooftop Solar PVPermit requiredcityBuilding + electrical permits; fee set by city.Often over-the-counter for small residential PV.Generally allowedKansas has no statewide energy code; local adoption of the IECC is optional.
Exempt: No size exemption; rooftop PV always permitted.
🌡️ HVAC ReplacementConditionalcityMechanical permit; fee set by city.Trade permits often issued same-day.Generally allowedEquipment must meet current energy-efficiency rules where an energy code is adopted.
Exempt: In-kind replacement in the same location may be exempt per city.
🍳 Kitchen RemodelConditionalcityValuation-based when plumbing/electrical/structural work is included.Standard review for permitted scopes.Generally allowedWhere no local code is adopted, a kitchen remodel may need no permit — verify with the city/county.
Exempt: Cabinet/countertop swap in the same layout is exempt.
🛁 Bathroom RemodelConditionalcityValuation-based when plumbing is relocated.Standard review for permitted scopes.Generally allowedVentilation to the exterior is required.
Exempt: Fixture-for-fixture swap in place is often exempt.
🏗️ Room AdditionPermit requiredcityValuation-based; includes trade permits.Plan review varies by city.Generally allowedLot-coverage and energy-code compliance are reviewed where applicable.
Exempt: No exemption — any new conditioned footprint requires a permit where a code is adopted.
🪟 Window / Door ReplacementConditionalcityUsually no fee for in-kind swap; permit needed if opening is enlarged.In-kind swaps typically need no review.Generally allowedReplacement products should meet energy-code U-factor where an energy code is adopted.
Exempt: Same-size, in-kind replacement is generally exempt.
🏘️ Roof ReplacementConditionalcityOften over-the-counter or exempt for same-footprint re-roof.Same-day/next-business-day in many cities.Generally allowedWhere no code is adopted, re-roofing may need no permit — verify locally.
Exempt: Same-material, same-slope re-roof often exempt/over-the-counter.
🅿️ Driveway / Parking PadConditionalcityBuilding permit often not required; curb-cut/right-of-way work is separate.Right-of-way permits reviewed by the city/utility.Generally allowedA separate right-of-way permit is usually needed to cut the curb or connect to the street.
Exempt: Replacing a driveway in the same footprint (no new curb cut) is generally exempt.
🏊 Swimming Pool / SpaPermit requiredcityValuation-based; includes barrier/fencing and electrical bonding review.Plan review 4-6 weeks; barrier inspection before filling.Generally allowedPool barriers (self-latching gates, non-climbable fencing) are required locally.
Exempt: Overland Park: pools more than 24 in deep and all spas/hot tubs require a permit. Small portable pools may be exempt.
🧱 Retaining WallConditionalcityValuation-based when over the height threshold.Over-threshold walls need plan review.Generally allowedTaller or surcharge-supporting walls require a sealed design.
Exempt: Overland Park: retaining walls 48 in or higher require a permit with a sealed engineered design. Walls 4 ft or less are typically exempt under the IRC.
💥 Demolition / TeardownPermit requiredcityDemolition permit fee set by the issuing authority; verify locally.Generally allowedA full teardown or major strip-out requires a demolition (building) permit. Demolition permits commonly require proof of utility disconnects (water, gas, electric, sewer) and may require asbestos/lead-paint clearance for pre-1978 homes before work begins. Verify the issuing authority for your specific property.
🚰 Septic SystemPermit requiredcountySeptic permit fee set by the local environmental/health authority; engineered systems cost more.Generally allowedNew or replacement onsite wastewater (septic) systems require a permit from the state environmental/health department (or local health district). A soil/perc evaluation and engineered design are typically required; licensed installers perform the work and the system is inspected before backfill.
🔌 EV ChargerConditionalcityElectrical permit; fee set by the issuing authority.Generally allowedA home EV charging station (240V branch circuit + wall-mounted EVSE) requires an electrical permit and must meet the NEC (Article 625). Many jurisdictions fast-track residential EVSE. A load calculation and possible service upgrade are reviewed.
Standby GeneratorConditionalcityMechanical/electrical permit; fee set by the issuing authority.Generally allowedA permanently installed standby generator requires mechanical and electrical permits (transfer switch, fuel gas/propane line). Setback, carbon-monoxide ventilation, and noise rules apply; some HOAs restrict generator placement.

Frequently asked questions

Who issues building permits in Johnson County, Kansas?

Johnson County — Building Codes & Permits (and incorporated-city building departments) is the permitting authority for Johnson County. Permitting is split — cities issue for incorporated areas, the county for unincorporated areas. Start at the official portal linked above.

Do I go to the county or my city for a building permit in Johnson County?

Permitting is split — cities issue for incorporated areas, the county for unincorporated areas.

What home projects need a permit in Johnson County?

The same project types shown in the cheat-sheet above (ADU, deck, fence, shed, solar, and more) — rules follow Kansas state law. Whether the county or your city issues it depends on your property's incorporation status.

How do I apply for a permit in Johnson County?

Use the official permit portal linked above. Most offices accept online submissions; have your plans, site information, and contractor details ready before applying.

The WikEst Editorial Team · Updated 2026-08-15
Compiled and reviewed by the WikEst editorial team from official state and municipal building-department publications.