Building permits in Wayne County, Michigan

Find the right authority before you build. Wayne County permitting follows Michigan law — here is exactly who issues the permit and where to start.

Cities issue permits

Municipalities issue permits — City of Detroit Buildings, Safety Engineering & Environmental Department (BSEED); other Wayne County cities issue their own

Wayne County government does not issue residential building permits. In Detroit, permits are issued by the City’s Buildings, Safety Engineering & Environmental Department (BSEED) through its Accela/eLAPS portal; in other Wayne County cities such as Livonia, Dearborn, Westland, Taylor and Romulus the municipal building department issues them. Homeowners apply through their own city.

Open the official permit portal →

For Detroit addresses use the Accela/eLAPS portal at detroitmi.gov; for suburbs, contact that city’s building department.
County vs. city. Project-specific permit rules below follow Michigan state law and are shown for reference. Whether the county or your city issues the permit depends on whether your property is in an incorporated city or unincorporated Wayne County — see the authority note above and confirm with the issuing department.

Permit cheat-sheet (Michigan rules)

ProjectPermit?AuthorityTypical feeTimelineGo / No-GoKey notes
🏠 Accessory Dwelling Unit (ADU)Permit requiredcityBuilding permit based on project valuation; verify with the city. Detroit issues residential permits in about 5 days.Typically 5–15 business days; Detroit ~5 days, Grand Rapids 5–10 days for simple projects.Generally allowedADUs are allowed in Michigan subject to local zoning. A building permit and zoning approval are required; some cities cap size and occupant/rental rules. Confirm with Detroit or Grand Rapids planning.
Exempt: No state size exemption for an ADU (it is habitable space).
🪵 Deck / PorchConditionalcityValuation-based building permit; verify with the city.Typically 5–15 business days; Detroit ~5 days.Generally allowedFootings must extend below the frost line — 42 in in the Detroit/Grand Rapids area. Guards required at 30 in+ above grade. Verify setback and lot coverage with the city.
Exempt: State R105.2 exempts decks ≤200 sq ft, ≤30 in above grade, not attached, not within 36 in of the dwelling, and not serving egress.
🧱 Fence / WallConditionalcityTypically a zoning/building permit fee; verify with the city.Often issued in days to 1–2 weeks.Generally allowedMichigan exempts fences up to 7 ft under the state code, but cities set their own height/yard limits and may require a zoning review. Always check local ordinance and HOA.
Exempt: State R105.2 exempts fences 7 ft high or less (Detroit: 7 ft or less, not in a Special Review District).
🛖 Shed / OutbuildingConditionalcityValuation-based where required; structures <200 sq ft often use a lower-compliance permit.Often 5–10 business days; smaller sheds may be issued faster.Generally allowedSmall detached storage sheds are usually exempt, but adding electricity/plumbing or exceeding 200 sq ft triggers a permit. Confirm setbacks with the city.
Exempt: State R105.2 exempts one-story detached accessory structures ≤200 sq ft. Grand Rapids: <200 sq ft = Planning Accessory Structure Permit; ≥200 sq ft = building permit.
🪜 Basement FinishPermit requiredcityValuation-based building permit; verify with the city.Plan review typically 2–4 weeks plus inspections.Generally allowedConverting a basement to living space requires permits for framing, egress, electrical, plumbing, and mechanical. Egress windows are required for bedrooms.
Exempt: n/a
🚗 Garage / CarportPermit requiredcityValuation-based building permit; verify with the city.Plan review typically 2–4 weeks plus inspections.Generally allowedNew detached or attached garages and carports require a building permit and zoning/setback review.
Exempt: Detroit exempts detached accessory structures ≤200 sq ft; new garages over that need a permit.
☀️ Rooftop Solar PVPermit requiredcityElectrical (and structural) permit per city schedule; verify locally.Often 1–3 weeks; some jurisdictions expedite residential PV.Generally allowedResidential rooftop solar PV requires an electrical (and often structural/mechanical) permit plus utility interconnection approval.
Exempt: Any grid-tied rooftop PV system requires a permit.
🌡️ HVAC ReplacementPermit requiredcityMechanical permit fee per city schedule; verify locally.Usually 1–2 weeks; light plan review, straightforward inspection.Generally allowedReplacing or upgrading HVAC equipment requires a mechanical permit and inspection before energizing.
Exempt: Any furnace, AC, or heat-pump replacement/installation requires a permit.
🍳 Kitchen RemodelPermit requiredcityBuilding + trade permits based on valuation; verify with the city.Plan review typically 2–4 weeks plus trade inspections.Generally allowedKitchen remodels moving plumbing/electrical or altering walls require building, plumbing, and electrical permits.
Exempt: Any layout/plumbing/electrical change requires a permit.
🛁 Bathroom RemodelPermit requiredcityBuilding + trade permits based on valuation; verify with the city.Plan review typically 1–3 weeks plus trade inspections.Generally allowedBathroom remodels that move fixtures, add ventilation, or alter plumbing/electrical require permits.
Exempt: Any fixture relocation or new wet wall requires a permit.
🏗️ Room AdditionPermit requiredcityBuilding permit based on valuation plus trade permits; verify with the city.Plan review typically 3–6 weeks plus multiple inspections.Generally allowedRoom additions change the footprint and require foundation, framing, egress, and trade reviews. Historic districts need a Certificate of Appropriateness.
Exempt: Any new conditioned square footage requires a full permit.
🪟 Window / Door ReplacementConditionalcityBuilding permit (alteration) where required; verify with the city.Often 1–2 weeks; many window jobs are issued without plan review.Generally allowedReplacing windows/doors in the same opening is typically exempt; enlarging an opening or cutting a new one requires a permit.
Exempt: In-kind replacement in the same opening is often exempt.
🏘️ Roof ReplacementPermit requiredcityBuilding permit (re-roof) per city schedule; verify locally.Often 1–2 weeks; inspection after decking/underlayment and after shingles.Generally allowedDetroit requires a permit for roof replacement. Other jurisdictions vary — verify locally before starting.
Exempt: Detroit requires a permit for roof replacement (removal of substantial shingles).
🅿️ Driveway / Parking PadConditionalcityPermit fee where required; verify locally.Often 1–2 weeks; right-of-way review can add time.Generally allowedNew or widened driveways, curb cuts, and right-of-way work typically require a permit and possibly stormwater review.
Exempt: State R105.2 exempts sidewalks/driveways ≤30 in above adjacent grade and not over a basement.
🏊 Swimming Pool / SpaConditionalcityBuilding + electrical permit per city schedule; verify locally.Plan review typically 2–4 weeks plus inspections.Generally allowedPools require a building permit and code-compliant barrier (self-closing/self-latching gate). Electrical permit for wiring.
Exempt: State R105.2 exempts prefab pools <24 in deep, ≤5,000 gal, installed entirely above ground.
🧱 Retaining WallConditionalcityBuilding permit where required; verify with the city.1–3 weeks; walls over threshold may need engineered drawings.Generally allowedRetaining walls holding more than 4 ft of fill require a permit and often professional design. Check HOA and drainage too.
Exempt: State R105.2 exempts retaining walls ≤4 ft measured from bottom of footing to top (unless supporting a surcharge).
The WikEst Editorial Team · Updated 2026-08-15
Compiled and reviewed by the WikEst editorial team from official state and municipal building-department publications.