Building permits in Burleigh County, North Dakota

Find the right authority before you build. Burleigh County permitting follows North Dakota law — here is exactly who issues the permit and where to start.

County + cities (mixed)

Burleigh County Building/Planning/Zoning Department (unincorporated areas); City of Bismarck issues within city limits/ETA

Burleigh County issues building permits through its Building/Planning/Zoning Department for unincorporated areas; the City of Bismarck issues permits within city limits and its extraterritorial area (ETA).

Open the official permit portal →

County vs. city. Project-specific permit rules below follow North Dakota state law and are shown for reference. Whether the county or your city issues the permit depends on whether your property is in an incorporated city or unincorporated Burleigh County — see the authority note above and confirm with the issuing department.

Permit cheat-sheet (North Dakota rules)

ProjectPermit?AuthorityTypical feeTimelineGo / No-GoKey notes
🏠 Accessory Dwelling Unit (ADU)Permit requiredcityGenerally allowedNorth Dakota has no statewide by-right ADU law; allowance is set by local zoning. Verify with your city/county building department whether ADUs are permitted in your zone.
Exempt: No statewide ADU mandate; an ADU is a dwelling and requires a building permit where codes are enforced.
🪵 Deck / PorchConditionalcityGenerally allowedFootings must extend below ND frost depth (commonly 48–60 in depending on region). Ledger flashing and guardrail details are reviewed. Check with your local building department.
Exempt: State code (IRC R105.2) exempts decks ≤200 sq ft, ≤30 in above grade, not attached, not serving the exit door.
🧱 Fence / WallConditionalcityGenerally allowedVisibility-triangle rules at corner lots apply in every major city. Zoning (height, placement, materials) is separate from the building-permit exemption — verify locally.
Exempt: IRC R105.2 exempts fences not over 7 ft; local thresholds vary (Fargo & Bismarck ~8.5 ft, Grand Forks 6 ft).
🛖 Shed / OutbuildingConditionalcityGenerally allowedAdding electrical or plumbing requires separate trade permits (State Electrical/Plumbing Boards). In non-enforcing rural townships a building permit may not be required at all.
Exempt: One-story detached accessory structures (sheds) ≤120 sq ft are exempt (IRC R105.2, unamended in ND).
🪜 Basement FinishPermit requiredcityGenerally allowedBasement finishes trigger egress, smoke-alarm, and trade-permit requirements. Outside enforcing jurisdictions, state electrical/plumbing permits still apply.
Exempt: Cosmetic finishing (paint, flooring) is exempt.
🚗 Garage / CarportPermit requiredcityGenerally allowedSetbacks, lot coverage, and energy-code (2024 IECC) compliance are reviewed; frost-depth footings required.
Exempt: New detached structures over the accessory-exemption size require a permit.
☀️ Rooftop Solar PVPermit requiredcityGenerally allowedStructural review accounts for ND snow loads and frost-depth footings for ground mounts. Electrical work is permitted through the State Electrical Board statewide.
Exempt: No size exemption; rooftop PV always permitted.
🌡️ HVAC ReplacementConditionalcityGenerally allowedThe ND State Building Code adopts the IMC/IFGC; mechanical permits are issued locally where codes are enforced. Equipment must meet current energy-code efficiency.
Exempt: In-kind replacement in the exact location may be treated as repair; verify with the local official.
🍳 Kitchen RemodelConditionalcityGenerally allowed2024 IECC energy requirements are triggered on remodels. Verify scope with your local building department.
Exempt: Cabinet/countertop swap in the same layout is exempt.
🛁 Bathroom RemodelConditionalcityGenerally allowedExterior ventilation is required; plumbing permits go through the State Plumbing Board (or local AHJ where enforcing).
Exempt: Fixture-for-fixture swap in place is often exempt.
🏗️ Room AdditionPermit requiredcityGenerally allowedPlan review covers setbacks, lot coverage, energy code, and frost-depth footings. Outside enforcing jurisdictions, state electrical/plumbing permits still apply.
Exempt: No exemption — any new conditioned footprint requires a permit.
🪟 Window / Door ReplacementConditionalcityGenerally allowedReplacement products should meet energy-code requirements when the code is triggered. Electrical/structural changes need separate permits.
Exempt: Same-size, in-kind replacement is generally exempt.
🏘️ Roof ReplacementConditionalcityGenerally allowedND requires ice-and-water barrier at eaves (cold-climate code). Confirm with your local building department whether a permit is required for your re-roof.
Exempt: Same-footprint, in-kind re-roof is often exempt/over-the-counter.
🅿️ Driveway / Parking PadConditionalcityGenerally allowedA separate driveway/right-of-way permit is usually needed to cut the curb or connect to the street (city/county or NDDOT).
Exempt: Sidewalks and driveways not over 30 in above grade and not over a basement are exempt (IRC R105.2).
🏊 Swimming Pool / SpaConditionalcityGenerally allowedBarrier/fencing and electrical bonding are reviewed; pool-barrier requirements apply.
Exempt: Prefabricated swimming pools less than 24 in deep are exempt (IRC R105.2).
🧱 Retaining WallConditionalcityGenerally allowedDeep frost and expansive soils make proper footing design critical. Verify the threshold with your building department.
Exempt: Retaining walls not over 4 ft (bottom of footing to top) are exempt (IRC R105.2).
💥 Demolition / TeardownPermit requiredcityDemolition permit fee set by the issuing authority; verify locally.Generally allowedA full teardown or major strip-out requires a demolition (building) permit. Municipalities require utility disconnects (electric, gas, water, sewer) and, for pre-1978 homes, an asbestos/lead-paint clearance before demolition.
🚰 Septic SystemPermit requiredcountySeptic permit fee set by the local environmental/health authority; engineered systems cost more.Generally allowedNew or replacement onsite wastewater (septic) systems require a permit from the North Dakota Department of Environmental Quality; a soil/perc evaluation and engineered design are typically required, with inspections handled by the local public health unit.
🔌 EV ChargerConditionalcityElectrical permit; fee set by the issuing authority.Generally allowedA home EV charging station (240V branch circuit + wall-mounted EVSE) requires an electrical permit and must meet the NEC (Article 625). Many jurisdictions fast-track residential EVSE.
Standby GeneratorConditionalcityMechanical/electrical permit; fee set by the issuing authority.Generally allowedA permanently installed standby generator requires mechanical and electrical permits (transfer switch, fuel gas/propane line). Setback, carbon-monoxide ventilation, and noise rules apply.

Frequently asked questions

Who issues building permits in Burleigh County, North Dakota?

Burleigh County Building/Planning/Zoning Department (unincorporated areas); City of Bismarck issues within city limits/ETA is the permitting authority for Burleigh County. Permitting is split — cities issue for incorporated areas, the county for unincorporated areas. Start at the official portal linked above.

Do I go to the county or my city for a building permit in Burleigh County?

Permitting is split — cities issue for incorporated areas, the county for unincorporated areas.

What home projects need a permit in Burleigh County?

The same project types shown in the cheat-sheet above (ADU, deck, fence, shed, solar, and more) — rules follow North Dakota state law. Whether the county or your city issues it depends on your property's incorporation status.

How do I apply for a permit in Burleigh County?

Use the official permit portal linked above. Most offices accept online submissions; have your plans, site information, and contractor details ready before applying.

The WikEst Editorial Team · Updated 2026-08-15
Compiled and reviewed by the WikEst editorial team from official state and municipal building-department publications.