Home / Counties / New York / Kings County

Building permits in Kings County, New York

Find the right authority before you build. Kings County permitting follows New York law — here is exactly who issues the permit and where to start.

Cities issue permits

NYC Department of Buildings (DOB)

Kings County is coextensive with the Brooklyn borough of New York City. There is no separate county permitting agency — the NYC Department of Buildings (DOB) issues all building permits for Brooklyn through its Brooklyn Borough Office. Determine your permit type and submit through DOB’s online or in-person process.

Open the official permit portal →

Use NYC DOB’s “DOB NOW” portal to apply for most residential permits.
County vs. city. Project-specific permit rules below follow New York state law and are shown for reference. Whether the county or your city issues the permit depends on whether your property is in an incorporated city or unincorporated Kings County — see the authority note above and confirm with the issuing department.

Check a home project's permit in Kings County, New York

Select a project to see its New York permit rule. Whether the county or your city issues it depends on incorporation status — see the authority note above.

New York

Exact permit fees are set by the local building department. WikEst shows the published or code-based range where one exists, linked to its official source — verify the final amount at the source before budgeting.

🏠 Accessory Dwelling Unit (ADU) permit fee in New York

Permit requiredRestrictedcity authority
Permit fee range
Permit and plan-review fees set by the city. Verify with the local building department.
Typical timeline
Varies by city; NYC ADU filings may take several weeks.
Setback
Per local zoning.
Exempt if
Allowed only where the local law permits.

Exempt criteria: None — where allowed, ADUs require a permit.

New York has no statewide by-right ADU mandate; ADUs are allowed where local law permits (e.g., the NYC ADU program, Buffalo). Zoning applies.

Representative cities for New York: New York City, Buffalo.

All 20 project fee ranges in New York

Official-source ranges where published; “By local jurisdiction” means no flat fee is published and the amount is set case by case.

ProjectPermit?AuthorityFee rangeGo / no-go
🏠 Accessory Dwelling Unit (ADU)yescityPermit and plan-review fees set by the city. Verify with the local building department.restricted
🪵 Deck / PorchconditionalcitySet by the city — typically a flat plus valuation-based fee. Verify with the city building department.allowed
🧱 Fence / WallconditionalcityUsually no building permit under local height limits; zoning setback rules apply. Verify locally.allowed
🛖 Shed / OutbuildingconditionalcityNo fee under the exemption; a permit fee applies if over the threshold.allowed
🪜 Basement FinishyescityValuation-based building permit fee. Verify with the city building department.allowed
🚗 Garage / CarportyescityValuation-based fee. Verify with the city building department.allowed
☀️ Rooftop Solar PVyescityElectrical permit fee set by the city. Verify with the city building department.allowed
🌡️ HVAC ReplacementyescityMechanical permit fee set by the city. Verify with the city building department.allowed
🍳 Kitchen RemodelyescityBuilding + electrical + plumbing permit fees. Verify with the city building department.restricted
🛁 Bathroom RemodelyescityBuilding + plumbing + electrical fees. Verify with the city building department.restricted
🏗️ Room AdditionyescityValuation-based building permit; impact fees may apply. Verify with the city building department.allowed
🪟 Window / Door ReplacementconditionalcityPermit fee if changing the opening; in-kind swap is often exempt.allowed
🏘️ Roof ReplacementconditionalcityRoofing permit fee set by the city. Verify with the city building department.allowed
🅿️ Driveway / Parking PadconditionalcityPrivate flatwork generally needs no building permit; curb cut / right-of-way needs a separate permit.allowed
🏊 Swimming Pool / SpayescityBuilding permit + electrical; fee set by the city. Verify with the city building department.allowed
🧱 Retaining WallconditionalcityNo fee under the exemption; a permit applies if over the threshold.allowed
💥 Demolition / TeardownyescityDemolition permit fee set by the city/county building department; verify locally.allowed
🚰 Septic SystemyescountySeptic permit fees set by the local (county) health department; verify locally.allowed
🔌 EV ChargerconditionalcityElectrical permit fee set by the city; verify locally.allowed
Standby GeneratoryescityElectrical (and often mechanical/gas) permit fee set by the city; verify locally.allowed

Permit cheat-sheet (New York rules)

ProjectPermit?AuthorityTypical feeTimelineGo / No-GoKey notes
🏠 Accessory Dwelling Unit (ADU)Permit requiredcityPermit and plan-review fees set by the city. Verify with the local building department.Varies by city; NYC ADU filings may take several weeks.RestrictedNew York has no statewide by-right ADU mandate; ADUs are allowed where local law permits (e.g., the NYC ADU program, Buffalo). Zoning applies.
Exempt: Allowed only where the local law permits.
🪵 Deck / PorchConditionalcitySet by the city — typically a flat plus valuation-based fee. Verify with the city building department.1–4 weeks (NYC files through DOB NOW).Generally allowedAttached or raised decks need a permit; NYC requires a DOB filing.
Exempt: Decks >30 in above grade require a permit (RCNYS R105).
🧱 Fence / WallConditionalcityUsually no building permit under local height limits; zoning setback rules apply. Verify locally.Same day / Over-the-Counter where required.Generally allowedHeight/front-yard rules set by local zoning and HOA covenants.
Exempt: Typically no building permit under local height limits (zoning).
🛖 Shed / OutbuildingConditionalcityNo fee under the exemption; a permit fee applies if over the threshold.Same day / Over-the-Counter where required.Generally allowedLarger or serviced sheds need a building permit.
Exempt: One-story detached accessory structure ≤120 sq ft is exempt (RCNYS R105.2).
🪜 Basement FinishPermit requiredcityValuation-based building permit fee. Verify with the city building department.2–6 weeks.Generally allowedFinishing a basement requires egress (RCNYS R310) and permits; a sleeping room needs a code-compliant egress window.
Exempt: N/A
🚗 Garage / CarportPermit requiredcityValuation-based fee. Verify with the city building department.2–8 weeks.Generally allowedA new garage requires a building permit under the RCNYS / NYC Building Code.
Exempt: N/A
☀️ Rooftop Solar PVPermit requiredcityElectrical permit fee set by the city. Verify with the city building department.2–4 weeks (NYC files through DOB NOW).Generally allowedRooftop PV requires an electrical permit; NYC files through DOB NOW.
Exempt: N/A
🌡️ HVAC ReplacementPermit requiredcityMechanical permit fee set by the city. Verify with the city building department.1–2 weeks.Generally allowedFurnace, AC, or heat-pump replacement requires a mechanical permit and inspection.
Exempt: N/A
🍳 Kitchen RemodelPermit requiredcityBuilding + electrical + plumbing permit fees. Verify with the city building department.NYC: ALT2 review, several weeks.RestrictedNYC: kitchen/bath renovation needs an ALT2 permit filed by a NYS-licensed PE or RA; upstate follows similar building-permit rules.
Exempt: N/A
🛁 Bathroom RemodelPermit requiredcityBuilding + plumbing + electrical fees. Verify with the city building department.NYC: ALT2 review, several weeks.RestrictedNYC: bathroom renovation needs an ALT2 permit filed by a NYS-licensed PE or RA; fixture-only swaps may be exempt.
Exempt: N/A
🏗️ Room AdditionPermit requiredcityValuation-based building permit; impact fees may apply. Verify with the city building department.3–8 weeks.Generally allowedExpanding the footprint requires full plan review; NYC uses New Building / ALT1 filings.
Exempt: N/A
🪟 Window / Door ReplacementConditionalcityPermit fee if changing the opening; in-kind swap is often exempt.Same day / Over-the-Counter where required.Generally allowedEnlarging openings or changes to means of egress need a permit (NYC PE/RA filing).
Exempt: In-kind same-size replacement generally needs no permit.
🏘️ Roof ReplacementConditionalcityRoofing permit fee set by the city. Verify with the city building department.1–3 weeks.Generally allowedRe-roofing generally requires a permit; NYC requires a roofing permit. Minor repair may be exempt.
Exempt: N/A
🅿️ Driveway / Parking PadConditionalcityPrivate flatwork generally needs no building permit; curb cut / right-of-way needs a separate permit.Varies.Generally allowedA curb cut or work in the public right-of-way requires a separate permit from the city / public works.
Exempt: N/A
🏊 Swimming Pool / SpaPermit requiredcityBuilding permit + electrical; fee set by the city. Verify with the city building department.3–8 weeks.Generally allowedPools require a permit and barrier per RCNYS R328 (barrier, alarms, entrapment protection).
Exempt: N/A
🧱 Retaining WallConditionalcityNo fee under the exemption; a permit applies if over the threshold.2–4 weeks if required.Generally allowedTaller or surcharge-supporting walls need design and a permit.
Exempt: Retaining walls ≤4 ft (bottom of footing to top), not supporting a surcharge, are exempt (RCNYS R105.2).
💥 Demolition / TeardownPermit requiredcityDemolition permit fee set by the city/county building department; verify locally.Generally allowedA full teardown or major strip-out requires a demolition (building) permit from the city or county building department under the Uniform Code / Residential Code of NY State. Demolition permits commonly require utility disconnects and, for older homes, asbestos/lead clearance. NYC files demolition through DOB NOW.
🚰 Septic SystemPermit requiredcountySeptic permit fees set by the local (county) health department; verify locally.Generally allowedNew or replacement onsite wastewater (septic) systems require a permit from the local county health department under NYSDOH Appendix 75-A. Engineered design and a site/percolation evaluation are typically required; the local health department is the permitting authority.
🔌 EV ChargerConditionalcityElectrical permit fee set by the city; verify locally.Generally allowedA home EV charging station needs an electrical permit (dedicated 240V circuit and wall unit) issued by the city under the Uniform Code. New York has no single statewide EV-permitting fast-track, so review time varies by city (NYC files through DOB NOW). Work must meet the NEC.
Standby GeneratorPermit requiredcityElectrical (and often mechanical/gas) permit fee set by the city; verify locally.Generally allowedA permanently installed standby generator with a transfer switch and fuel (gas/propane) line requires electrical and often mechanical/gas permits, plus inspection. Setback, noise, and carbon-monoxide rules may apply, and HOAs may restrict installation. Verify with the city building department.

Frequently asked questions

Who issues building permits in Kings County, New York?

NYC Department of Buildings (DOB) is the permitting authority for Kings County. Permits are issued by the incorporated cities; the county handles only unincorporated areas. Start at the official portal linked above.

Do I go to the county or my city for a building permit in Kings County?

Permits are issued by the incorporated cities; the county handles only unincorporated areas.

What home projects need a permit in Kings County?

The same project types shown in the cheat-sheet above (ADU, deck, fence, shed, solar, and more) — rules follow New York state law. Whether the county or your city issues it depends on your property's incorporation status.

How do I apply for a permit in Kings County?

Use the official permit portal linked above. Most offices accept online submissions; have your plans, site information, and contractor details ready before applying.

The WikEst Editorial Team · Updated 2026-08-15
Compiled and reviewed by the WikEst editorial team from official state and municipal building-department publications.

Related tools from our network

A focused set of free calculators and guides across related topics — no account required.