Building permits in Cameron County, Texas

Find the right authority before you build. Cameron County permitting follows Texas law — here is exactly who issues the permit and where to start.

County + cities (mixed)

Cameron County Department of Transportation — Building & Inspections Division

The Cameron County Building & Inspections Division (within the Department of Transportation) processes and issues residential and commercial building permits for the unincorporated areas of Cameron County. Incorporated cities (Brownsville, Harlingen, San Benito, etc.) issue their own permits.

Open the official permit portal →

Building permits for unincorporated areas require a completed application, site plan, construction plans and proof of ownership; contact the Division at [email protected].
County vs. city. Project-specific permit rules below follow Texas state law and are shown for reference. Whether the county or your city issues the permit depends on whether your property is in an incorporated city or unincorporated Cameron County — see the authority note above and confirm with the issuing department.

Check a home project's permit in Cameron County, Texas

Select a project to see its Texas permit rule. Whether the county or your city issues it depends on incorporation status — see the authority note above.

Texas

Exact permit fees are set by the local building department. WikEst shows the published or code-based range where one exists, linked to its official source — verify the final amount at the source before budgeting.

🏠 Accessory Dwelling Unit (ADU) permit fee in Texas

Permit requiredRestrictedcity authority
Permit fee range
Permit and plan-review fees set by the city. Verify with the local building department.
Typical timeline
Varies by city; 2–8 weeks.
Setback
Per local zoning.
Exempt if
Allowed only where the local ordinance permits.

Exempt criteria: None — where allowed, ADUs require a permit.

Texas has no statewide ADU mandate; ADUs are allowed only where the local ordinance permits (e.g., Austin, Houston, Dallas). Zoning, size caps, and parking rules apply.

Representative cities for Texas: Houston, Dallas, Austin.

All 20 project fee ranges in Texas

Official-source ranges where published; “By local jurisdiction” means no flat fee is published and the amount is set case by case.

ProjectPermit?AuthorityFee rangeGo / no-go
🏠 Accessory Dwelling Unit (ADU)yescityPermit and plan-review fees set by the city. Verify with the local building department.restricted
🪵 Deck / PorchconditionalcitySet by the city — typically a flat plus valuation-based fee. Verify with the city building department.allowed
🧱 Fence / WallconditionalcityHouston: fee per city schedule where a permit is required. Verify locally.allowed
🛖 Shed / OutbuildingconditionalcityNo fee under the exemption; a permit fee applies if over the threshold.allowed
🪜 Basement FinishyescityValuation-based building permit fee. Verify with the city building department.allowed
🚗 Garage / CarportyescityValuation-based fee. Verify with the city building department.allowed
☀️ Rooftop Solar PVyescityElectrical permit fee set by the city. Verify with the city building department.allowed
🌡️ HVAC ReplacementyescityMechanical permit fee set by the city. Verify with the city building department.allowed
🍳 Kitchen RemodelyescityBuilding + electrical + plumbing permit fees. Verify with the city building department.allowed
🛁 Bathroom RemodelyescityBuilding + plumbing + electrical fees. Verify with the city building department.allowed
🏗️ Room AdditionyescityValuation-based building permit; impact fees may apply. Verify with the city building department.allowed
🪟 Window / Door ReplacementconditionalcityPermit fee if changing the opening; in-kind swap is often exempt.allowed
🏘️ Roof ReplacementconditionalcityRoofing permit fee set by the city. Verify with the city building department.allowed
🅿️ Driveway / Parking PadconditionalcityPrivate flatwork generally needs no building permit; floodplain/curb-cut work may be fee-based.allowed
🏊 Swimming Pool / SpayescityBuilding permit + electrical; fee set by the city. Verify with the city building department.allowed
🧱 Retaining WallconditionalcityNo fee under the exemption; a permit applies if over the threshold.allowed
💥 Demolition / TeardownyescityDemolition permit fee set by the city/county; verify locally.allowed
🚰 Septic SystemyescountySeptic permit fees set by the local authorized agent (county/city) under TCEQ rules; verify locally.allowed
🔌 EV ChargerconditionalcityElectrical permit fee set by the city; verify locally.allowed
Standby GeneratoryescityElectrical (and often mechanical/gas) permit fee set by the city; verify locally.allowed

Permit cheat-sheet (Texas rules)

ProjectPermit?AuthorityTypical feeTimelineGo / No-GoKey notes
🏠 Accessory Dwelling Unit (ADU)Permit requiredcityPermit and plan-review fees set by the city. Verify with the local building department.Varies by city; 2–8 weeks.RestrictedTexas has no statewide ADU mandate; ADUs are allowed only where the local ordinance permits (e.g., Austin, Houston, Dallas). Zoning, size caps, and parking rules apply.
Exempt: Allowed only where the local ordinance permits.
🪵 Deck / PorchConditionalcitySet by the city — typically a flat plus valuation-based fee. Verify with the city building department.1–4 weeks.Generally allowedAttached decks or decks over 30 in above grade require a building permit.
Exempt: Decks ≤30 in above grade are exempt (Houston IBC 105.2; Dallas same).
🧱 Fence / WallConditionalcityHouston: fee per city schedule where a permit is required. Verify locally.Houston: ~10 days for fence permits.Generally allowedHeight limits and front-yard rules are set by each city; HOA covenants may also apply.
Exempt: Houston: fences >8 ft or any masonry/concrete fence require a permit. Dallas: >6 ft (or >4 ft in a front yard) require a permit.
🛖 Shed / OutbuildingConditionalcityNo fee under the exemption; a permit fee applies if over the threshold.Same day / Over-the-Counter where required.Generally allowedLarger sheds or those with plumbing/electrical need a building permit.
Exempt: Dallas: utility building <200 sq ft needs no permit; generally a one-story detached structure ≤120 sq ft is exempt under the IRC.
🪜 Basement FinishPermit requiredcityValuation-based building permit fee. Verify with the city building department.2–6 weeks.Generally allowedUncommon in Texas; finishing a basement requires egress and permits.
Exempt: N/A
🚗 Garage / CarportPermit requiredcityValuation-based fee. Verify with the city building department.2–8 weeks.Generally allowedA new garage requires a building permit; Austin reviews to the 2024 IRC with local amendments.
Exempt: N/A
☀️ Rooftop Solar PVPermit requiredcityElectrical permit fee set by the city. Verify with the city building department.Often streamlined (1–3 days via SolarAPP+ where adopted); 2–4 weeks otherwise.Generally allowedRooftop PV requires an electrical permit; many Texas cities use SolarAPP+ for streamlined review.
Exempt: N/A
🌡️ HVAC ReplacementPermit requiredcityMechanical permit fee set by the city. Verify with the city building department.1–2 weeks.Generally allowedFurnace, AC, or heat-pump replacement requires a mechanical permit and inspection.
Exempt: N/A
🍳 Kitchen RemodelPermit requiredcityBuilding + electrical + plumbing permit fees. Verify with the city building department.2–6 weeks.Generally allowedMoving plumbing/electrical or walls triggers permits.
Exempt: N/A
🛁 Bathroom RemodelPermit requiredcityBuilding + plumbing + electrical fees. Verify with the city building department.2–6 weeks.Generally allowedPlumbing/electrical relocation requires permits.
Exempt: N/A
🏗️ Room AdditionPermit requiredcityValuation-based building permit; impact fees may apply. Verify with the city building department.3–8 weeks.Generally allowedExpanding the footprint requires full plan review and zoning compliance.
Exempt: N/A
🪟 Window / Door ReplacementConditionalcityPermit fee if changing the opening; in-kind swap is often exempt.Same day / Over-the-Counter where required.Generally allowedEnlarging openings or adding egress windows requires a permit.
Exempt: In-kind same-size replacement generally needs no permit.
🏘️ Roof ReplacementConditionalcityRoofing permit fee set by the city. Verify with the city building department.1–3 weeks.Generally allowedA full re-roof generally requires a roofing permit; structural deck damage requires a building permit.
Exempt: Dallas: re-roof of a single-family/duplex dwelling if value ≤$500 needs no permit.
🅿️ Driveway / Parking PadConditionalcityPrivate flatwork generally needs no building permit; floodplain/curb-cut work may be fee-based.Varies.Generally allowedHouston requires a floodplain development permit if the work is in a regulated floodplain (Chapter 19); a curb cut or right-of-way work needs a separate permit.
Exempt: Driveway not over 30 in above grade and off the right-of-way is generally exempt (Dallas).
🏊 Swimming Pool / SpaPermit requiredcityBuilding permit + electrical; fee set by the city. Verify with the city building department.3–8 weeks.Generally allowedIn-ground and most above-ground pools need a permit and barrier/fencing per local code.
Exempt: N/A
🧱 Retaining WallConditionalcityNo fee under the exemption; a permit applies if over the threshold.2–4 weeks if required.Generally allowedTaller walls or walls supporting a surcharge (driveway, structure, slope above) require design and a permit.
Exempt: Retaining walls not over 4 ft (bottom of footing to top) are exempt (Dallas; IRC 105.2).
💥 Demolition / TeardownPermit requiredcityDemolition permit fee set by the city/county; verify locally.Generally allowedA full teardown or major strip-out requires a demolition (building) permit. Texas is home-rule: cities issue the permit under their locally adopted code, while unincorporated areas are permitted by the county. Demolition permits often require utility disconnects and, for older homes, asbestos/lead clearance before work begins.
🚰 Septic SystemPermit requiredcountySeptic permit fees set by the local authorized agent (county/city) under TCEQ rules; verify locally.Generally allowedNew or replacement onsite wastewater (septic) systems require a permit under TCEQ Chapter 285 (OSSF). The local authorized agent (usually the county) issues the permit after a site evaluation and engineered design; a percolation/soil test is typically required. Verify with your county environmental health or TCEQ regional office.
🔌 EV ChargerConditionalcityElectrical permit fee set by the city; verify locally.Generally allowedA home EV charging station needs an electrical permit (dedicated 240V circuit and wall unit) issued by the city under its locally adopted code. Texas has no single statewide EV-permitting mandate, so review time and any fast-track process vary by city. Work must meet the NEC.
Standby GeneratorPermit requiredcityElectrical (and often mechanical/gas) permit fee set by the city; verify locally.Generally allowedA permanently installed standby generator with a transfer switch and fuel (gas/propane) line requires electrical and often mechanical/gas permits, plus inspection. Setback, noise, and carbon-monoxide rules may apply, and HOAs may restrict installation. Verify with the city building department.

Frequently asked questions

Who issues building permits in Cameron County, Texas?

Cameron County Department of Transportation — Building & Inspections Division is the permitting authority for Cameron County. Permitting is split — cities issue for incorporated areas, the county for unincorporated areas. Start at the official portal linked above.

Do I go to the county or my city for a building permit in Cameron County?

Permitting is split — cities issue for incorporated areas, the county for unincorporated areas.

What home projects need a permit in Cameron County?

The same project types shown in the cheat-sheet above (ADU, deck, fence, shed, solar, and more) — rules follow Texas state law. Whether the county or your city issues it depends on your property's incorporation status.

How do I apply for a permit in Cameron County?

Use the official permit portal linked above. Most offices accept online submissions; have your plans, site information, and contractor details ready before applying.

The WikEst Editorial Team · Updated 2026-08-15
Compiled and reviewed by the WikEst editorial team from official state and municipal building-department publications.