Home / Counties / Texas / Harris County

Building permits in Harris County, Texas

Find the right authority before you build. Harris County permitting follows Texas law — here is exactly who issues the permit and where to start.

County + cities (mixed)

Harris County Engineering Department — Development Services & Permits

Harris County issues building permits only for unincorporated Harris County (outside city limits) through its Engineering Department – Development Services & Permits (E-Permits). Most residents live inside the City of Houston or other incorporated cities (Pasadena, Baytown, etc.), where that city’s building department issues the permit. Texas counties generally have no residential building-code authority in their extraterritorial jurisdiction (ETJ).

Open the official permit portal →

Could not verify the exact production E-Permits portal URL; the Harris County Engineering Department runs online permit submittal/inspection for unincorporated areas. Confirm the current portal via the county website before applying.
County vs. city. Project-specific permit rules below follow Texas state law and are shown for reference. Whether the county or your city issues the permit depends on whether your property is in an incorporated city or unincorporated Harris County — see the authority note above and confirm with the issuing department.

Permit cheat-sheet (Texas rules)

ProjectPermit?AuthorityTypical feeTimelineGo / No-GoKey notes
🏠 Accessory Dwelling Unit (ADU)Permit requiredcityPermit and plan-review fees set by the city. Verify with the local building department.Varies by city; 2–8 weeks.RestrictedTexas has no statewide ADU mandate; ADUs are allowed only where the local ordinance permits (e.g., Austin, Houston, Dallas). Zoning, size caps, and parking rules apply.
Exempt: Allowed only where the local ordinance permits.
🪵 Deck / PorchConditionalcitySet by the city — typically a flat plus valuation-based fee. Verify with the city building department.1–4 weeks.Generally allowedAttached decks or decks over 30 in above grade require a building permit.
Exempt: Decks ≤30 in above grade are exempt (Houston IBC 105.2; Dallas same).
🧱 Fence / WallConditionalcityHouston: fee per city schedule where a permit is required. Verify locally.Houston: ~10 days for fence permits.Generally allowedHeight limits and front-yard rules are set by each city; HOA covenants may also apply.
Exempt: Houston: fences >8 ft or any masonry/concrete fence require a permit. Dallas: >6 ft (or >4 ft in a front yard) require a permit.
🛖 Shed / OutbuildingConditionalcityNo fee under the exemption; a permit fee applies if over the threshold.Same day / Over-the-Counter where required.Generally allowedLarger sheds or those with plumbing/electrical need a building permit.
Exempt: Dallas: utility building <200 sq ft needs no permit; generally a one-story detached structure ≤120 sq ft is exempt under the IRC.
🪜 Basement FinishPermit requiredcityValuation-based building permit fee. Verify with the city building department.2–6 weeks.Generally allowedUncommon in Texas; finishing a basement requires egress and permits.
Exempt: N/A
🚗 Garage / CarportPermit requiredcityValuation-based fee. Verify with the city building department.2–8 weeks.Generally allowedA new garage requires a building permit; Austin reviews to the 2024 IRC with local amendments.
Exempt: N/A
☀️ Rooftop Solar PVPermit requiredcityElectrical permit fee set by the city. Verify with the city building department.Often streamlined (1–3 days via SolarAPP+ where adopted); 2–4 weeks otherwise.Generally allowedRooftop PV requires an electrical permit; many Texas cities use SolarAPP+ for streamlined review.
Exempt: N/A
🌡️ HVAC ReplacementPermit requiredcityMechanical permit fee set by the city. Verify with the city building department.1–2 weeks.Generally allowedFurnace, AC, or heat-pump replacement requires a mechanical permit and inspection.
Exempt: N/A
🍳 Kitchen RemodelPermit requiredcityBuilding + electrical + plumbing permit fees. Verify with the city building department.2–6 weeks.Generally allowedMoving plumbing/electrical or walls triggers permits.
Exempt: N/A
🛁 Bathroom RemodelPermit requiredcityBuilding + plumbing + electrical fees. Verify with the city building department.2–6 weeks.Generally allowedPlumbing/electrical relocation requires permits.
Exempt: N/A
🏗️ Room AdditionPermit requiredcityValuation-based building permit; impact fees may apply. Verify with the city building department.3–8 weeks.Generally allowedExpanding the footprint requires full plan review and zoning compliance.
Exempt: N/A
🪟 Window / Door ReplacementConditionalcityPermit fee if changing the opening; in-kind swap is often exempt.Same day / Over-the-Counter where required.Generally allowedEnlarging openings or adding egress windows requires a permit.
Exempt: In-kind same-size replacement generally needs no permit.
🏘️ Roof ReplacementConditionalcityRoofing permit fee set by the city. Verify with the city building department.1–3 weeks.Generally allowedA full re-roof generally requires a roofing permit; structural deck damage requires a building permit.
Exempt: Dallas: re-roof of a single-family/duplex dwelling if value ≤$500 needs no permit.
🅿️ Driveway / Parking PadConditionalcityPrivate flatwork generally needs no building permit; floodplain/curb-cut work may be fee-based.Varies.Generally allowedHouston requires a floodplain development permit if the work is in a regulated floodplain (Chapter 19); a curb cut or right-of-way work needs a separate permit.
Exempt: Driveway not over 30 in above grade and off the right-of-way is generally exempt (Dallas).
🏊 Swimming Pool / SpaPermit requiredcityBuilding permit + electrical; fee set by the city. Verify with the city building department.3–8 weeks.Generally allowedIn-ground and most above-ground pools need a permit and barrier/fencing per local code.
Exempt: N/A
🧱 Retaining WallConditionalcityNo fee under the exemption; a permit applies if over the threshold.2–4 weeks if required.Generally allowedTaller walls or walls supporting a surcharge (driveway, structure, slope above) require design and a permit.
Exempt: Retaining walls not over 4 ft (bottom of footing to top) are exempt (Dallas; IRC 105.2).
The WikEst Editorial Team · Updated 2026-08-15
Compiled and reviewed by the WikEst editorial team from official state and municipal building-department publications.