Building permits in Fairfax County, Virginia

Find the right authority before you build. Fairfax County permitting follows Virginia law — here is exactly who issues the permit and where to start.

County issues permits

Fairfax County Department of Planning & Development / Land Development Services (county issues permits)

Fairfax County issues building permits for the unincorporated county through its Department of Planning & Development / Land Development Services via the PLUS system. The independent City of Fairfax and the towns of Vienna, Herndon and Clifton issue their own permits through their municipal building departments rather than the County.

Open the official permit portal →

County vs. city. Project-specific permit rules below follow Virginia state law and are shown for reference. Whether the county or your city issues the permit depends on whether your property is in an incorporated city or unincorporated Fairfax County — see the authority note above and confirm with the issuing department.

Permit cheat-sheet (Virginia rules)

ProjectPermit?AuthorityTypical feeTimelineGo / No-GoKey notes
🏠 Accessory Dwelling Unit (ADU)Permit requiredcityBuilding permit based on valuation plus a 2% state levy (Virginia Beach); verify with the city.Residential plan review ~10 business days for new construction; zoning first.Generally allowedVirginia law requires localities to allow ADUs in single-family zoning. A USBC building permit and zoning approval are required. Henrico lists ADUs as permit-required.
Exempt: No state size exemption — ADUs are habitable accessory structures.
🪵 Deck / PorchPermit requiredcityBuilding permit based on valuation plus a 2% state levy; verify with the city.Virginia Beach initial online review targets 3 business days; typical issuance 10–15 business days.Generally allowedA building permit is required for new decks (Virginia Beach requires it for every deck, no size/height exemption). Inspections: footing, framing, final. Footings ~18 in in coastal Virginia.
Exempt: Prince William: decks with floor ≥16.5 in above grade require a permit. Virginia Beach requires a permit for ALL decks regardless of size/height.
🧱 Fence / WallConditionalcityPermit fee where required (e.g., >6 ft) plus any zoning fee; verify with the city.Often 1–2 weeks; zoning review may apply.Generally allowedStandard yard fences under 6 ft are typically permit-exempt under the VUSBC, but a pool-barrier fence is always regulated. Taller fences and HOA rules may require a permit. Verify locally.
Exempt: State VUSBC exempts fences <6 ft (unless a pool barrier). Richmond requires a permit for fences >6 ft.
🛖 Shed / OutbuildingConditionalcityBuilding permit where required (valuation-based); Virginia Beach adds wind-design review for larger sheds.Often 1–2 weeks; simple sheds may be issued at counter.Generally allowedSheds ≤256 sq ft are exempt from a building permit but must meet zoning setbacks and HOA rules. Larger sheds need a permit and (in Virginia Beach) engineered anchoring for 115 mph wind.
Exempt: State VUSBC exempts one-story detached sheds ≤256 sq ft (storage/utility). Virginia Beach exempts sheds ≤256 sq ft.
🪜 Basement FinishPermit requiredcityBuilding permit based on valuation; verify with the city.Plan review ~10 business days plus inspections.Generally allowedBasement finishing requires permits for framing, egress, electrical, plumbing, and mechanical. Egress windows required for bedrooms.
Exempt: n/a
🚗 Garage / CarportPermit requiredcityBuilding permit based on valuation; verify with the city.Plan review ~10 business days plus inspections.Generally allowedNew garages and carports require a USBC building permit and zoning/setback review. Richmond lists garages as permit-required.
Exempt: Any new detached or attached garage requires a building permit.
☀️ Rooftop Solar PVPermit requiredcityElectrical (and building) permit per VUSBC schedule; verify locally.Often 1–3 weeks; some jurisdictions expedite residential PV.Generally allowedResidential rooftop solar PV requires a building/electrical permit plus utility interconnection approval.
Exempt: Any grid-tied rooftop PV system requires a permit (solar energy equipment is permit-required under VUSBC).
🌡️ HVAC ReplacementPermit requiredcityMechanical permit fee per VUSBC schedule; verify locally.Usually 1–2 weeks; light plan review.Generally allowedReplacing or upgrading HVAC equipment requires a mechanical permit and inspection before energizing. Use a DPOR-licensed contractor.
Exempt: Any furnace, AC, or heat-pump replacement/installation requires a mechanical permit.
🍳 Kitchen RemodelPermit requiredcityBuilding + trade permits based on valuation; verify with the city.Plan review ~10 business days plus trade inspections.Generally allowedKitchen remodels moving plumbing/electrical or altering walls require building, plumbing, and electrical permits.
Exempt: Any layout/plumbing/electrical change requires a permit.
🛁 Bathroom RemodelPermit requiredcityBuilding + trade permits based on valuation; verify with the city.Plan review ~10 business days plus trade inspections.Generally allowedBathroom remodels that move fixtures, add ventilation, or alter plumbing/electrical require permits.
Exempt: Any fixture relocation or new wet wall requires a permit.
🏗️ Room AdditionPermit requiredcityBuilding permit based on valuation plus trade permits and a 2% state levy; verify with the city.Plan review ~10 business days (new construction) plus multiple inspections.Generally allowedRoom additions change the footprint and require foundation, framing, egress, and trade reviews. Historic districts need design review.
Exempt: Any new conditioned square footage requires a full permit.
🪟 Window / Door ReplacementConditionalcityBuilding permit where required; verify with the city.Often 1–2 weeks; many same-opening swaps are exempt.Generally allowedSame-size window/door swaps are exempt; converting a window to a door or enlarging an opening requires a permit.
Exempt: In-kind replacement in the same opening is exempt (ordinary repair).
🏘️ Roof ReplacementNo permitcityGenerally no construction permit fee for a like-for-like re-roof in 1-2 family dwellings.Not required for ordinary re-roof; structural decking work adds review time.Generally allowedA like-for-like re-roof on a 1- or 2-family home is ordinary repair under the VUSBC and needs no permit; replacing >256 sq ft of roof sheathing does.
Exempt: Re-roofing a 1- or 2-family home is ordinary repair and does not require a permit.
🅿️ Driveway / Parking PadConditionalcityTypically no building permit; stormwater/erosion or right-of-way fees may apply — verify locally.Zoning/erosion review typically 1–2 weeks where triggered.Generally allowedDriveways usually do not require a building permit, but new curb cuts, right-of-way work, and soil disturbance over threshold need zoning/erosion approval.
Exempt: A standard driveway in the same footprint is generally exempt from a building permit (Norfolk lists driveways as not requiring one).
🏊 Swimming Pool / SpaConditionalcityBuilding permit based on valuation plus electrical; verify locally.Plan review ~10 business days plus inspections.Generally allowedPools over 24 in deep require a USBC permit and code-compliant barrier (self-closing/self-latching gate). Electrical permit for wiring.
Exempt: VUSBC: pools >150 sq ft and >24 in deep require a permit. Small shallow above-ground pools are exempt.
🧱 Retaining WallConditionalcityBuilding permit where required; verify with the city.1–3 weeks; walls over threshold may need engineered drawings.Generally allowedRetaining walls holding more than 3 ft of unbalanced fill require a permit and often professional design. Tiered walls have special rules. Check HOA too.
Exempt: VUSBC exempts retaining walls supporting <3 ft (36 in) of unbalanced fill. Over 3 ft requires a permit.
The WikEst Editorial Team · Updated 2026-08-15
Compiled and reviewed by the WikEst editorial team from official state and municipal building-department publications.