Building permits in King County, Washington

Find the right authority before you build. King County permitting follows Washington law — here is exactly who issues the permit and where to start.

County + cities (mixed)

King County Dept. of Local Services (unincorporated) / City of Seattle for in-city

In unincorporated King County, building permits are issued by the King County Department of Local Services. Within Seattle, Bellevue, and other incorporated cities, the city building department issues the permit instead.

Open the official permit portal →

County vs. city. Project-specific permit rules below follow Washington state law and are shown for reference. Whether the county or your city issues the permit depends on whether your property is in an incorporated city or unincorporated King County — see the authority note above and confirm with the issuing department.

Permit cheat-sheet (Washington rules)

ProjectPermit?AuthorityTypical feeTimelineGo / No-GoKey notes
🏠 Accessory Dwelling Unit (ADU)Permit requiredcityValuation-based; Seattle SDCI issue fees scale with project value (no flat state fee).Seattle pre-approved DADU plans ~2–6 weeks; custom plans longer.Generally allowedWashington HB 1337 (2025) mandates ADUs; Seattle also allows two ADUs per lot. Owner-occupancy and extra parking are not required in Seattle.
Exempt: Statewide HB 1337 (eff. 2025) allows ≥1 ADU per lot; Seattle allows up to 2 ADUs.
🪵 Deck / PorchConditionalcityValuation-based; fee set by the issuing city.Simple decks may be Subject-to-Field-Inspection; standard review 4–8 weeks.Generally allowedAttached decks and decks over 30 in above grade always require a permit.
Exempt: Freestanding decks ≤30 in above grade and ≤200 sq ft are commonly exempt.
🧱 Fence / WallConditionalcityOften no building-permit fee when under the height threshold; zoning rules still apply.Typically no building permit below threshold; review only if over height.Generally allowedCorner lots have sight-triangle limits; Environmentally Critical Area (ECA) lots need a pre-application site visit.
Exempt: Seattle: no building permit for fences < 8 ft; Spokane generally requires a permit for new/replacement fences.
🛖 Shed / OutbuildingConditionalcityValuation-based when a permit is required; many small sheds are exempt.Exempt sheds need no review; others often Subject-to-Field-Inspection.Generally allowedLot-coverage and stormwater rules still apply even when a permit is not required.
Exempt: Seattle: one-story detached accessory building <120 sq ft roof area on slab-on-grade exempt; Spokane <200 sq ft exempt.
🪜 Basement FinishPermit requiredcityValuation-based; includes trade permits (electrical, plumbing).Standard review 4–8 weeks.Generally allowedBedrooms must have an emergency egress window (≥5.7 sq ft opening).
Exempt: Cosmetic-only finishing (paint, flooring) is exempt.
🚗 Garage / CarportPermit requiredcityValuation-based; includes trade permits.New structure review; complex projects 8–16 weeks.Generally allowedAttached and detached garages require a full building permit and plan review.
Exempt: No exemption — a new garage is a new structure.
☀️ Rooftop Solar PVPermit requiredcityBuilding + electrical permits; Seattle combined fees typically a few hundred dollars.Seattle Solar Express: same-day for standard residential PV <30 kW (RCW 64.40 / HB 1117).Generally allowedWashington HB 1117 requires expedited solar permitting; HOA solar restrictions are limited by RCW 64.38.055.
Exempt: No size exemption; systems >30 kW use the standard path.
🌡️ HVAC ReplacementPermit requiredcityMechanical (trade) permit; fee set by city.Trade permits often issued quickly; same-day in many cases.Generally allowedNew equipment must meet the Washington State Energy Code (WSEC-R).
Exempt: No exemption for equipment replacement.
🍳 Kitchen RemodelConditionalcityValuation-based when structural/plumbing/electrical work is included.Standard review 4–8 weeks for permitted scopes.Generally allowedVerify whether walls are load-bearing before any layout change.
Exempt: Cabinet/countertop swap in the same layout is exempt.
🛁 Bathroom RemodelConditionalcityValuation-based when plumbing is relocated.Standard review for permitted scopes.Generally allowedVentilation must meet code; exhaust to the exterior is required.
Exempt: Fixture-for-fixture swap in place is often exempt.
🏗️ Room AdditionPermit requiredcityValuation-based; includes trade permits.Complex review 8–16 weeks.Generally allowedMiddle-housing reforms (HB 1110) may allow more units by right; check zoning.
Exempt: No exemption — any new conditioned footprint requires a permit.
🪟 Window / Door ReplacementConditionalcityUsually no fee for in-kind swap; permit needed if opening is enlarged.In-kind swaps typically need no review.Generally allowedReplacement windows should meet U-factor requirements when the energy code is triggered.
Exempt: Same-size, in-kind replacement is generally exempt.
🏘️ Roof ReplacementConditionalcityOften Subject-to-Field-Inspection or exempt for same-footprint re-roof.STFI re-roofs can be approved same-day.Generally allowedSnow-load and seismic detailing apply in eastern WA (Spokane).
Exempt: Same-material, same-slope re-roof often exempt/STFI.
🅿️ Driveway / Parking PadConditionalcityBuilding permit often not required; curb-cut/right-of-way work is separate.Right-of-way permits reviewed by the city/utility.Generally allowedA separate right-of-way or utility permit is usually needed to cut the curb.
Exempt: Seattle: driveways <18 in above grade exempt from building permit; Spokane <30 in exempt.
🏊 Swimming Pool / SpaPermit requiredcityValuation-based; includes barrier/fencing review.Standard review; varies by city.Generally allowedWashington adopts the International Swimming Pool & Spa Code (WAC 51-50-3109); barrier fencing is mandatory.
Exempt: No exemption — pools/spas require a permit (incl. most above-ground).
🧱 Retaining WallConditionalcityValuation-based when over the height threshold.Over-threshold walls need plan review.Generally allowedWalls in Environmentally Critical Areas need a pre-application site visit.
Exempt: Walls <4 ft from bottom of footing are generally exempt.
The WikEst Editorial Team · Updated 2026-08-15
Compiled and reviewed by the WikEst editorial team from official state and municipal building-department publications.