🪵 Deck / Porch permit in Montana

An attached or freestanding outdoor platform, usually wood or composite, elevated above grade or at grade level. Here is the Montana-specific rule: who issues it, typical fees, timeline, go / no-go, and the official source to verify.

Verify locally. Montana adopts the 2021 IRC (ARM 24.301.154) but MCA 50-60-102 exempts residential buildings with fewer than five dwelling units from the STATE building permit unless the local government has certified a building-code program. Billings, Missoula and about three dozen other cities (plus six counties) enforce locally; much of rural Montana has no structural building-permit requirement for single-family homes. State electrical (NEC), plumbing (UPC) and mechanical permits are required statewide regardless of location. Verify with your city building department or the MT DLI Building Codes Program. Rules below are Montana-level guidance drawn from official sources — always confirm with the issuing building department before starting work. See the county permit authorities to find the right office.

Deck / Porch permit in Montana

The Montana rule for a deck / porch, with fee range, timeline, go / no-go, and the official source.

Montana
🪵 Deck / Porch

Exact permit fees are set by the local building department. WikEst shows the published or code-based range where one exists, linked to its official source — verify the final amount at the source before budgeting.

🪵 Deck / Porch permit fee in Montana

ConditionalGenerally allowedcity authority
Permit fee range
Where enforced, fees follow the local schedule; verify locally.
Typical timeline
Where enforced, simple decks often over-the-counter to a few weeks.
Setback
Exempt if
Freestanding decks not over 30 in above grade are typically exempt (2021 IRC R105.2). Billings requires a permit for decks over 30 in above grade.

Exempt criteria: Freestanding deck not attached and not over 30 in above grade is generally exempt (2021 IRC R105.2).

In certified cities a permit is required for elevated or attached decks. In non-certified areas, single-family homes are exempt from the state building permit. State trade permits still apply.

Representative cities for Montana: Billings, Missoula.

All 20 project fee ranges in Montana

Official-source ranges where published; “By local jurisdiction” means no flat fee is published and the amount is set case by case.

ProjectPermit?AuthorityFee rangeGo / no-go
🏠 Accessory Dwelling Unit (ADU)conditionalcityWhere a certified city/county enforces, fees follow that jurisdiction; in non-certified areas a single-family home is exempt from the state building permit (trade permits still apply). Verify locally.case-by-case
🪵 Deck / PorchconditionalcityWhere enforced, fees follow the local schedule; verify locally.allowed
🧱 Fence / WallconditionalcityWhere enforced, fencing permits apply above local height limits; verify locally.allowed
🛖 Shed / OutbuildingconditionalcityWhere enforced, small detached sheds may be exempt; verify locally.allowed
🪜 Basement FinishconditionalcityWhere a certified city enforces, a building permit fee applies; in non-certified areas the state building permit is exempt for single-family homes (trade permits still apply). Verify locally.allowed
🚗 Garage / CarportconditionalcityWhere enforced, attached garages (additions) are permitted; verify locally.allowed
☀️ Rooftop Solar PVyesstateElectrical permit required statewide by the MT DLI Building Codes Program (NEC); local jurisdictions may also be involved.allowed
🌡️ HVAC ReplacementyesstateMechanical permit required statewide by the MT DLI Building Codes Program; licensed contractors perform the work.allowed
🍳 Kitchen RemodelconditionalcityWhere enforced, a building permit plus trade permits apply; verify locally.allowed
🛁 Bathroom RemodelconditionalcityWhere enforced, a building permit plus trade permits apply; verify locally.allowed
🏗️ Room AdditionconditionalcityWhere a certified city enforces, a building permit based on valuation applies; in non-certified areas the state building permit is exempt for single-family homes (trade permits still apply). Verify locally.allowed
🪟 Window / Door ReplacementconditionalcityWhere enforced, a permit fee applies if enlarging the opening; in-kind swap often exempt. Verify locally.allowed
🏘️ Roof ReplacementconditionalcityWhere enforced, an in-kind re-roof may be exempt; structural deck replacement requires a permit. Verify locally.allowed
🅿️ Driveway / Parking PadconditionalcityNo building permit for private flatwork where enforced; a right-of-way permit may be needed. Verify locally.allowed
🏊 Swimming Pool / SpaconditionalcityWhere enforced, a building permit plus barrier fencing applies; verify locally.allowed
🧱 Retaining WallconditionalcityWhere enforced, a permit applies if over 4 ft; verify locally.allowed
💥 Demolition / TeardownyescityDemolition permit fee set by the issuing authority; verify locally.allowed
🚰 Septic SystemyescountySeptic permit fee set by the local environmental/health authority; engineered systems cost more.allowed
🔌 EV ChargerconditionalcityElectrical permit; fee set by the issuing authority.allowed
Standby GeneratorconditionalcityMechanical/electrical permit; fee set by the issuing authority.allowed

Montana rule at a glance

Needs permit
conditional
Issuing authority
city
Typical fee
Where enforced, fees follow the local schedule; verify locally.
Typical timeline
Where enforced, simple decks often over-the-counter to a few weeks.
Setback
Exempt if
Freestanding decks not over 30 in above grade are typically exempt (2021 IRC R105.2). Billings requires a permit for decks over 30 in above grade.
In certified cities a permit is required for elevated or attached decks. In non-certified areas, single-family homes are exempt from the state building permit. State trade permits still apply.

Frequently asked questions

Does a deck / porch need a permit in Montana?

In Montana, a deck / porch is conditional / size-dependent. Issuance is at the city level. Confirm the exact threshold with the local building department using the sources on this page.

Who issues the deck / porch permit in Montana?

Montana permits for this project are handled at the city level — usually the city or county building department. Use the county permit authority lookup to find the exact office for your property.

How much does a deck / porch permit cost in Montana?

Fees are set locally in Montana and are not a single statewide number. Open the official authority link on this page for the current schedule.

What exemptions apply to a deck / porch in Montana?

A common threshold: Freestanding decks not over 30 in above grade are typically exempt (2021 IRC R105.2). Billings requires a permit for decks over 30 in above grade.. Freestanding deck not attached and not over 30 in above grade is generally exempt (2021 IRC R105.2). City or county amendments may apply — verify locally.

Deck / Porch in other states

StatePermit?AuthorityTypical feeTimelineGo / No-GoKey notes
CaliforniaConditionalcitySet by the city — typically a flat fee plus a valuation-based fee. Verify with the city building department.Same-day Over-the-Counter for low decks (SF); 2–4 weeks elsewhere.Generally allowedAttached decks and any deck over 30 in above grade need a permit. SF issues Over-the-Counter permits for decks less than 10 ft above grade that meet setbacks.
Exempt: Decks over 30 in (760 mm) above grade require a permit; lower decks are often exempt.
TexasConditionalcitySet by the city — typically a flat plus valuation-based fee. Verify with the city building department.1–4 weeks.Generally allowedAttached decks or decks over 30 in above grade require a building permit.
Exempt: Decks ≤30 in above grade are exempt (Houston IBC 105.2; Dallas same).
FloridaConditionalcitySet by the city — typically a flat plus valuation-based fee. Verify with the city building department.1–4 weeks.Generally allowedAttached or raised decks need a building permit.
Exempt: Decks >30 in above grade or attached require a permit (FBC R105).
New YorkConditionalcitySet by the city — typically a flat plus valuation-based fee. Verify with the city building department.1–4 weeks (NYC files through DOB NOW).Generally allowedAttached or raised decks need a permit; NYC requires a DOB filing.
Exempt: Decks >30 in above grade require a permit (RCNYS R105).
PennsylvaniaPermit requiredcityMunicipal permit fee; Philadelphia EZ Permit available for eligible decks.Philadelphia EZ Permits reviewed while you wait; standard permits ~15 business days.Generally allowedAttached decks and any deck more than 30 in above grade need a permit. Philadelphia offers an EZ Permit for residential decks up to 216 sq ft.
IllinoisPermit requiredcityChicago fees via online calculator; other municipalities set their own.Generally allowedDecks and porches require a permit (Chicago requires permits for decks/porches). Chicago offers an Express Permit for eligible deck work; most other IL towns follow IRC R105.
OhioPermit requiredcityColumbus minimum permit fee $125; total scales with valuation.Residential permits ~10 business days (Columbus BZS).Generally allowedDecks require a permit (Columbus lists deck/ramp permits). Attached decks and any deck more than 30 in above grade always require one.
GeorgiaPermit requiredcityAtlanta minimum permit cost $150 plus $25 technology fee; total scales with construction cost.Generally allowedDeck/patio additions require a permit (Atlanta lists deck/patio addition). Attached decks and decks over 30 in above grade always require one.
North CarolinaPermit requiredcityValuation-based building permit fee; Raleigh uses its Development Fee Guide / calculator. No flat statewide figure.Plan review commonly 1–3 weeks; Mecklenburg targets ~7 business days for 1–2 family decks.Generally allowedCharlotte (Mecklenburg) and Raleigh both require a building permit for any deck/porch regardless of size or height. Footings must reach 12 in below grade; guards required at 30 in+.
Exempt: State IRC R105.2 exempts only freestanding decks ≤200 sq ft, ≤30 in above grade, not serving egress — but Charlotte and Raleigh require a permit for ALL decks.
MichiganConditionalcityValuation-based building permit; verify with the city.Typically 5–15 business days; Detroit ~5 days.Generally allowedFootings must extend below the frost line — 42 in in the Detroit/Grand Rapids area. Guards required at 30 in+ above grade. Verify setback and lot coverage with the city.
Exempt: State R105.2 exempts decks ≤200 sq ft, ≤30 in above grade, not attached, not within 36 in of the dwelling, and not serving egress.
New JerseyPermit requiredcityConstruction permit based on valuation; plan review fee applies. Verify with the city.Plan review commonly up to 20 business days; simple permits may be issued sooner.Generally allowedNew decks require a UCC construction permit and zoning approval; plans by a NJ-licensed design professional are typically required. Newark footings are ~36 in. Repairs to existing decks are exempt if non-structural.
Exempt: Newark requires a permit for attached or detached decks over 30 in high; Jersey City requires a permit for any new deck.
VirginiaPermit requiredcityBuilding permit based on valuation plus a 2% state levy; verify with the city.Virginia Beach initial online review targets 3 business days; typical issuance 10–15 business days.Generally allowedA building permit is required for new decks (Virginia Beach requires it for every deck, no size/height exemption). Inspections: footing, framing, final. Footings ~18 in in coastal Virginia.
Exempt: Prince William: decks with floor ≥16.5 in above grade require a permit. Virginia Beach requires a permit for ALL decks regardless of size/height.
WashingtonConditionalcityValuation-based; fee set by the issuing city.Simple decks may be Subject-to-Field-Inspection; standard review 4–8 weeks.Generally allowedAttached decks and decks over 30 in above grade always require a permit.
Exempt: Freestanding decks ≤30 in above grade and ≤200 sq ft are commonly exempt.
ArizonaConditionalcityValuation-based; Phoenix base building-permit fee is $150.Over-the-counter or 1–3 weeks depending on complexity.Generally allowedAttached decks with a structural ledger connection should be verified with the building department.
Exempt: Decks ≤30 in above grade (and not over a basement) are exempt.
MassachusettsConditionalcityValuation-based; each city sets its own schedule.Worcester: ~3–4 weeks; Boston: short-form fast, long-form several weeks.Generally allowedA licensed Construction Supervisor (CSL) is required unless the owner does the work on an owner-occupied home.
Exempt: Decks ≤200 sq ft, ≤30 in above grade, not attached, not serving a required exit are exempt.
TennesseeConditionalcityValuation-based; set by the issuing city/county.Memphis OCCE ~5–10 business days for standard decks.Generally allowedFooting depth follows local frost line (shallow in Memphis, ~12 in Middle TN).
Exempt: Decks ≤200 sq ft, ≤30 in above grade, not attached, not serving a required exit are exempt.
IndianaConditionalcitySet by the local building department.Generally allowedAttached decks and any deck over 30 in above grade need a permit. Indianapolis requires a structural permit for deck work.
Exempt: Decks more than 30 in above grade generally require a building permit under the Indiana Residential Code (IRC R105.2).
MissouriConditionalcityPermit fees set locally by each municipality — verify with the city building department.Varies by municipality — over-the-counter/simple permits often same-day to ~2 weeks.Generally allowedKansas City adopted the 2018 IRC (effective 2020); St. Louis enforces the I-Codes locally. Exact thresholds follow local amendments — verify with your city.
Exempt: Freestanding decks low to grade and not attached are generally exempt under the locally adopted IRC R105.2; attached decks and decks over 30 in require a permit.
MarylandConditionalcitySet by the city.Generally allowedAttached decks and decks over 30 in above grade need a permit. Annapolis publishes deck construction requirements.
Exempt: Decks over 30 in above grade generally require a building permit under the IRC (adopted in MD as MBPS).
WisconsinConditionalcityPermit fees set by each municipality — verify with the local building inspection department.Varies by municipality — over-the-counter/simple permits often same-day to ~2 weeks.Generally allowedMilwaukee and Madison require a permit for decks attached to the dwelling or over 30 in above grade; footings are inspected for frost depth.
Exempt: Freestanding decks low to grade and not attached are generally exempt under the UDC; attached decks and decks over 30 in require a permit.
AlaskaConditionalcityValuation-based; set by the municipality.Anchorage initial plan review ~1–3 days; full review longer for complex decks.Generally allowedFrost-depth footings are required for every deck — Fairbanks frost depth commonly reaches 60+ in and Anchorage ~40–60 in. Footing inspections occur before concrete is poured.
Exempt: Anchorage requires a permit for decks more than 30 in above grade and within 3 ft of grade.
AlabamaConditionalcityValuation-based; set by the issuing city.Birmingham residential plan review typically 5–10 business days.Generally allowedBirmingham adopts the IBC/IRC with Alabama amendments. Deck footings commonly bottom out at the ~12 in frost depth, but expansive Black Belt clay in central Birmingham often requires deeper footings and a geotechnical report.
Exempt: Decks ≤30 in above adjacent grade are typically exempt (IRC R105.2).
ArkansasConditionalcityValuation-based; Little Rock minimum building-permit fee $50 (work over $5,000 or requiring inspection).Little Rock residential plan review typically 5–15 business days.Generally allowedLedger-board attachment is a key inspection point; Arkansas frost line is a mild 12–18 in.
Exempt: Decks >30 in above grade or >200 sq ft require a permit (IRC + local); ground-level decks below both are generally exempt.
ColoradoConditionalcityValuation-based; set by the issuing city/county.Generally allowedSome cities also require a permit for any deck attached to the house because of the structural connection. Mountain/WUI communities may require fire-resistant decking.
Exempt: Most Colorado cities require a permit for decks >30 in above grade or >200 sq ft; ground-level decks below both are generally exempt. Denver and Colorado Springs follow IRC thresholds.
ConnecticutConditionalcityValuation-based; set by the city/town.Generally allowedLedger-board attachment is a key inspection point.
Exempt: Decks >30 in above grade require a permit (IRC R105.2); attached or higher decks require a permit.
DelawareConditionalcountyValuation-based; set by the county or city.Generally allowedLedger-board attachment is a key inspection point.
Exempt: Decks >30 in above grade require a permit (IRC); attached or higher decks require a permit (Kent County follows the 2018 IRC).
HawaiiConditionalcountyValuation-based; set by the county building department.Plan review for permitted decks; over-the-counter for simple low platforms where exempt.Generally allowedAll structural lumber above ground must be preservative-treated for Formosan termite resistance per Hawaii’s amended code; wind-load design (105–170 mph gusts by location) applies. Verify with the county building department.
Exempt: Platforms, walks, and driveways not more than 30 in above grade and not over a basement are exempt.
IowaConditionalcityValuation-based; set by the issuing city.Over-the-counter to a few weeks depending on complexity.Generally allowedAttached decks and any deck above 30 in require a permit and footings below the local frost line (36-42 in across Iowa).
Exempt: Freestanding decks 30 in or less above adjacent grade are typically exempt.
IdahoConditionalcityValuation-based; set by the issuing city.Over-the-counter or plan review depending on complexity.Generally allowedAttached decks with a structural ledger connection should be verified with the building department; mountain areas require local snow-load design.
Exempt: Decks ≤30 in above grade (not serving as an exit) are exempt under the Idaho Residential Code.
KansasConditionalcityValuation-based; set by the issuing city.Wichita 5-10 business days typical.Generally allowedFootings must extend below the local frost line (24-36 in across Kansas).
Exempt: Overland Park requires a permit for all new/replacement decks; Wichita requires a permit for decks over 30 in above grade.
KentuckyConditionalcityValuation-based; set by the issuing city.Lexington simple decks can be approved same-day if filed before 4 p.m.Generally allowedAttached decks and any deck above 30 in require a permit; footings below the local frost line (about 24 in in Lexington).
Exempt: Freestanding decks 30 in or less above grade are typically exempt under the KRC (2015 IRC).
LouisianaConditionalcityValuation-based; set by the issuing parish/city.NOLA residential renovation permits 2-5 business days.Generally allowedAttached or elevated decks require a permit and wind/hurricane detailing.
Exempt: NOLA exempts uncovered decks <=200 sq ft and <=30 in high, not attached, not serving as an exit.
MaineConditionalcityValuation-based; set by the issuing municipality (no statewide flat fee).1–4 weeks for plan review; simple exempt work is over-the-counter.Generally allowedMaine uses a 200 sq ft deck exemption (higher than the base IRC 120 sq ft). Footings must reach the local frost depth (commonly 48–60 in). Attached decks need a permit even if small — confirm with the Code Enforcement Officer.
Exempt: Freestanding decks ≤200 sq ft and ≤30 in above grade are exempt.
MinnesotaConditionalcityPermit fees set by the municipality; verify locally.Varies by municipality — simple decks often same-day to a few weeks.Generally allowedMinnesota has deep frost depths (roughly 42 in across the Twin Cities) — deck footings must extend below the local frost line. Verify with Minneapolis Development Review or Saint Paul DSI.
Exempt: Freestanding decks low to grade and not attached are generally exempt; attached decks and decks over 30 in above grade require a permit.
MississippiConditionalcityWhere enforced, fees follow the local schedule (e.g., Jackson scales with valuation). Verify locally.Varies by jurisdiction.Generally allowedIf your jurisdiction does not enforce a building code, no structural permit is required. The six coastal counties must enforce coastal wind/flood provisions.
Exempt: Where a code is enforced (e.g., Jackson adopts the 2018 IRC), a freestanding deck not over 30 in above grade and under ~200 sq ft is typically exempt.
North DakotaConditionalcityGenerally allowedFootings must extend below ND frost depth (commonly 48–60 in depending on region). Ledger flashing and guardrail details are reviewed. Check with your local building department.
Exempt: State code (IRC R105.2) exempts decks ≤200 sq ft, ≤30 in above grade, not attached, not serving the exit door.
NebraskaConditionalcityPermit fees set by the municipality; verify locally.Varies by municipality — simple decks often same-day to a few weeks.Generally allowedNebraska adopts the 2018 IRC (R313 sprinklers and chapters 25-33 mechanical/plumbing replaced by state codes). Deep frost depths (about 42 in in Omaha/Lincoln) set footing requirements. Verify locally.
Exempt: Freestanding decks low to grade and not attached are generally exempt; Omaha permits decks over 30 sq ft or more than 30 in above grade, and Lincoln requires a permit for all decks.
New HampshireConditionalcityGenerally allowedNew Hampshire footings must extend to frost depth (commonly 48 in). Even exempt low decks must meet zoning setbacks. Verify the threshold with your local building department — some towns permit any attached deck.
Exempt: Decks ≤30 in above adjacent grade and (in most towns) ≤200 sq ft are exempt from a building permit.
New MexicoConditionalcityGenerally allowedSetbacks and lot-coverage limits still apply. In LEAs like Albuquerque, plan review typically takes 10–15 business days; Santa Fe historic-district properties need additional design review.
Exempt: Decks ≤200 sq ft, ≤30 in above grade, not attached to the dwelling, and not serving the required exit door are exempt.
NevadaConditionalcityValuation-based; Reno offers flat-rate EZ permits for simple decks. Clark County fees scale with valuation.Over-the-counter/EZ for simple decks; plan review for attached or elevated decks.Generally allowedAttached decks with a structural ledger connection and any deck above 30 in require a permit and footing inspections (frost depth matters in Washoe County).
Exempt: Decks ≤30 in above adjacent grade (not over a basement) are exempt from a building permit per IRC R105.2 / Clark County exemption.
OklahomaPermit requiredcityValuation-based; OKC deck permits are commonly a few hundred dollars per the city fee schedule.OKC: simple decks often approved within 5–10 business days; over-the-counter for some.Generally allowedOklahoma’s tornado-wind design speeds (≈105–135 mph) drive hold-down hardware, post anchorage, and continuous load path; expansive-clay soils require deeper/larger footings.
Exempt: IRC R105.2 exempts decks ≤30 in above grade, but OKC requires a permit for any attached deck and for detached elevated decks regardless of size.
OregonConditionalcityValuation-based; Portland permit fees follow the city building-permit fee schedule.Over-the-counter for low decks; plan review for elevated decks.Generally allowedOregon’s seismic-active status means deck ledger and connection details are inspected; footnote to local frost/soil conditions.
Exempt: Porches/decks ≤30 in above adjacent grade are exempt (statewide). Portland: decks/stairs >30 in above grade require a permit.
Rhode IslandConditionalcityRhode Island statewide valuation-based fee formula (Providence minimum permit fee $125).Over-the-counter for low decks; plan review for elevated decks (Providence ~3 weeks for decks >200 sq ft).Generally allowedCoastal/glacial soils and a 42 in frost depth mean deck footings must be inspected for depth.
Exempt: Decks ≤30 in above adjacent grade are exempt (RI follows IRC R105.2).
South CarolinaConditionalcityValuation-based; Charleston adds an application + zoning-review fee on top of the permit fee.Plan review ~2–3 weeks (Charleston); footing inspection before concrete.Generally allowedCoastal South Carolina design wind speeds reach 130–160 mph (Wind-Borne Debris Regions); hurricane-rated hardware and flood-zone elevation rules often apply.
Exempt: S.C. Code § 40-59-265 exempts decks NOT exceeding 200 sq ft AND not more than 30 in above grade at any point.
South DakotaConditionalcityValuation-based; set by the issuing city.Over-the-counter or 1–3 weeks depending on complexity.Generally allowedSioux Falls footings must extend to the local 42-inch frost depth; verify with the building department before sizing footings.
Exempt: Decks ≤30 in above adjacent grade are exempt under IRC R105.2.
UtahConditionalcityValuation-based; set by the city.Over-the-counter or 1–3 weeks depending on complexity.Generally allowedUtah amendments emphasize proper ledger-board attachment, flashing, and lateral-load connections for decks.
Exempt: Decks ≤30 in above adjacent grade are exempt under IRC R105.2.
VermontConditionalcityValuation-based where enforced.Over-the-counter or 1–3 weeks where enforced.Generally allowedVermont frost depth runs 48–60 in; deck footings must extend below the local frost line. Snow loads 40–70 psf apply.
Exempt: Decks ≤30 in above adjacent grade are exempt under IRC R105.2.
West VirginiaConditionalcityValuation-based; fees waived for total job cost ≤ $2,500.Over-the-counter or 1–3 weeks depending on complexity.Generally allowedCharleston issues permits for decks; follow the state code footing/frost and guardrail requirements.
Exempt: Decks ≤30 in above adjacent grade are exempt under IRC R105.2.
WyomingConditionalcityValuation-based where enforced.Over-the-counter or 1–3 weeks depending on complexity.Generally allowedCheyenne footings must address high wind and deep frost; verify with the building department.
Exempt: Decks ≤30 in above adjacent grade are exempt under IRC R105.2.
The WikEst Editorial Team · Updated 2026-08-15
Compiled and reviewed by the WikEst editorial team from official state and municipal building-department publications.