🅿️ Driveway / Parking Pad permit in Maryland
A new or expanded private driveway or parking pad (concrete, asphalt, pavers). Here is the Maryland-specific rule: who issues it, typical fees, timeline, go / no-go, and the official source to verify.
Driveway / Parking Pad permit in Maryland
The Maryland rule for a driveway / parking pad, with fee range, timeline, go / no-go, and the official source.
Exact permit fees are set by the local building department. WikEst shows the published or code-based range where one exists, linked to its official source — verify the final amount at the source before budgeting.
🅿️ Driveway / Parking Pad permit fee in Maryland
Exempt criteria: Private driveways that do not enter the public right-of-way are generally exempt.
Representative cities for Maryland: Baltimore, Annapolis.
All 20 project fee ranges in Maryland
Official-source ranges where published; “By local jurisdiction” means no flat fee is published and the amount is set case by case.
| Project | Permit? | Authority | Fee range | Go / no-go |
|---|---|---|---|---|
| 🏠 Accessory Dwelling Unit (ADU) | yes | city | Building permit fee set by the city; zoning/use approval also required. | case-by-case |
| 🪵 Deck / Porch | conditional | city | Set by the city. | allowed |
| 🧱 Fence / Wall | conditional | city | Set by local jurisdiction | allowed |
| 🛖 Shed / Outbuilding | conditional | city | Set by local jurisdiction | allowed |
| 🪜 Basement Finish | yes | city | Building permit fee set by the city. | allowed |
| 🚗 Garage / Carport | yes | city | Building permit fee set by the city; zoning clearance may be required. | allowed |
| ☀️ Rooftop Solar PV | yes | city | Electrical/structural permit fee set by the city. | allowed |
| 🌡️ HVAC Replacement | yes | city | Mechanical permit fee set by the city. | allowed |
| 🍳 Kitchen Remodel | yes | city | Building permit fee; trade permits billed separately. | allowed |
| 🛁 Bathroom Remodel | yes | city | Building permit fee; trade permits billed separately. | allowed |
| 🏗️ Room Addition | yes | city | Building permit fee based on valuation; zoning and plan review apply. | allowed |
| 🪟 Window / Door Replacement | conditional | city | Set by local jurisdiction | allowed |
| 🏘️ Roof Replacement | yes | city | Roof-covering permit fee set by the city. | allowed |
| 🅿️ Driveway / Parking Pad | conditional | city | Set by local jurisdiction | allowed |
| 🏊 Swimming Pool / Spa | yes | city | Building permit fee; barrier fencing required by code. | allowed |
| 🧱 Retaining Wall | conditional | city | Set by local jurisdiction | allowed |
| 💥 Demolition / Teardown | yes | city | Demolition permit fee set by the city. | allowed |
| 🚰 Septic System | yes | state | Onsite disposal system (septic) permit fee set by the Maryland Dept. of the Environment / local health department. | allowed |
| 🔌 EV Charger | conditional | city | Electrical permit fee set by the city. | allowed |
| ⚡ Standby Generator | conditional | city | Mechanical and/or electrical permit fee set by the city. | allowed |
Maryland rule at a glance
Frequently asked questions
Does a driveway / parking pad need a permit in Maryland?
In Maryland, a driveway / parking pad is conditional / size-dependent. Issuance is at the city level. Confirm the exact threshold with the local building department using the sources on this page.
Who issues the driveway / parking pad permit in Maryland?
Maryland permits for this project are handled at the city level — usually the city or county building department. Use the county permit authority lookup to find the exact office for your property.
How much does a driveway / parking pad permit cost in Maryland?
Fees are set locally in Maryland and are not a single statewide number. Open the official authority link on this page for the current schedule.
What exemptions apply to a driveway / parking pad in Maryland?
Baseline exemptions (e.g. small detached structures, low decks) may apply but Maryland or your city can amend them. Verify with the local building department.
🗺️ All projects in Maryland
📊 Driveway / Parking Pad in every state
Driveway / Parking Pad in other states
| State | Permit? | Authority | Typical fee | Timeline | Go / No-Go | Key notes |
|---|---|---|---|---|---|---|
| California | Conditional | city | No building permit for private flatwork; a right-of-way/curb cut needs a separate permit. | Varies. | Generally allowed | A curb cut or work in the public right-of-way requires a separate permit from the city / public works. Exempt: N/A |
| Texas | Conditional | city | Private flatwork generally needs no building permit; floodplain/curb-cut work may be fee-based. | Varies. | Generally allowed | Houston requires a floodplain development permit if the work is in a regulated floodplain (Chapter 19); a curb cut or right-of-way work needs a separate permit. Exempt: Driveway not over 30 in above grade and off the right-of-way is generally exempt (Dallas). |
| Florida | Conditional | city | Private flatwork generally needs no building permit; right-of-way/curb cut needs a separate permit. | Varies. | Generally allowed | A curb cut or work in the public right-of-way requires a separate permit from the city / public works. Exempt: N/A |
| New York | Conditional | city | Private flatwork generally needs no building permit; curb cut / right-of-way needs a separate permit. | Varies. | Generally allowed | A curb cut or work in the public right-of-way requires a separate permit from the city / public works. Exempt: N/A |
| Pennsylvania | Conditional | city | — | — | Generally allowed | A permit may be required where the driveway connects to the street/right-of-way, involves significant grading, or needs an excavation/site permit. Verify locally. |
| Illinois | Conditional | city | — | — | Generally allowed | A permit may be required where the driveway connects to the street/right-of-way or triggers an excavation/erosion permit. Verify locally. |
| Ohio | Conditional | city | Columbus minimum permit fee $125 where a permit is required. | — | Generally allowed | A permit may be required where the driveway connects to the street/right-of-way or involves significant grading. Verify locally. |
| Georgia | Conditional | city | Atlanta minimum permit cost $150 plus $25 fee where a permit is required. | — | Generally allowed | A permit may be required where the driveway connects to the street/right-of-way or triggers an erosion/grading permit. Verify locally. |
| North Carolina | Conditional | city | Permit fee per city schedule; stormwater review may apply — verify locally. | Often 1–2 weeks; stormwater/buffer review can extend this. | Generally allowed | New or widened driveways can trigger stormwater and tree-protection review. Raleigh lists driveways under replacements needing a permit. Exempt: New or widened driveways typically require a permit; minor repair may not. |
| Michigan | Conditional | city | Permit fee where required; verify locally. | Often 1–2 weeks; right-of-way review can add time. | Generally allowed | New or widened driveways, curb cuts, and right-of-way work typically require a permit and possibly stormwater review. Exempt: State R105.2 exempts sidewalks/driveways ≤30 in above adjacent grade and not over a basement. |
| New Jersey | Conditional | city | Zoning/driveway approval fee where required; verify with the city. | Zoning review typically 1–2 weeks. | Generally allowed | New driveways and curb cuts require zoning approval; right-of-way/work in the public street needs a separate permit. Confirm with the city zoning office. Exempt: New driveways typically need zoning approval rather than a full construction permit. |
| Virginia | Conditional | city | Typically no building permit; stormwater/erosion or right-of-way fees may apply — verify locally. | Zoning/erosion review typically 1–2 weeks where triggered. | Generally allowed | Driveways usually do not require a building permit, but new curb cuts, right-of-way work, and soil disturbance over threshold need zoning/erosion approval. Exempt: A standard driveway in the same footprint is generally exempt from a building permit (Norfolk lists driveways as not requiring one). |
| Washington | Conditional | city | Building permit often not required; curb-cut/right-of-way work is separate. | Right-of-way permits reviewed by the city/utility. | Generally allowed | A separate right-of-way or utility permit is usually needed to cut the curb. Exempt: Seattle: driveways <18 in above grade exempt from building permit; Spokane <30 in exempt. |
| Arizona | Conditional | city | Building permit often not required; curb-cut/right-of-way work is separate. | Right-of-way permits reviewed by the city/utility. | Generally allowed | A separate right-of-way permit is usually needed to cut the curb or connect to the street. Exempt: Replacing a driveway in the same footprint (no new curb cut) is generally exempt. |
| Massachusetts | Conditional | city | Building permit often not required; curb-cut/right-of-way work is separate. | Right-of-way permits reviewed by the city/DPW. | Generally allowed | A separate right-of-way permit is usually needed to cut the curb. Exempt: Sidewalks and driveways ≤30 in above grade are exempt (780 CMR R105.2). |
| Tennessee | Conditional | city | Building permit often not required; curb-cut/right-of-way work is separate. | Right-of-way permits reviewed by the city/utility. | Generally allowed | A separate right-of-way permit is usually needed to cut the curb. Exempt: Sidewalks and driveways ≤30 in above grade are exempt (Memphis/OCCE exemption list). |
| Indiana | Conditional | city | — | — | Generally allowed | A permit may be required where the driveway connects to the street/right-of-way or involves significant grading. Indianapolis issues driveway permits. |
| Missouri | Conditional | city | No building permit for private flatwork; a right-of-way/curb cut needs a separate permit. | Varies by municipality. | Generally allowed | Kansas City requires a permit only for a drive approach located in the public right-of-way. Other municipalities may differ — verify locally. |
| Wisconsin | Conditional | city | No building permit for private flatwork; a right-of-way/curb cut needs a separate permit. | Varies by municipality. | Generally allowed | A permit may be required for right-of-way/curb-cut work; verify with your municipal building inspection department. |
| Alaska | Conditional | city | Building permit often not required; curb-cut/right-of-way work is separate. | — | Generally allowed | Drainage and erosion control matter in Alaska; a separate right-of-way permit is needed to cut the curb. Exempt: Replacing a driveway in the same footprint (no new curb cut) is generally exempt. |
| Alabama | Conditional | city | Building permit often not required; curb-cut/right-of-way work is separate. | — | Generally allowed | A separate right-of-way permit is usually needed to cut the curb or connect to the street. Exempt: Replacing a driveway in the same footprint (no new curb cut) is generally exempt. |
| Arkansas | Conditional | city | Valuation-based; Little Rock minimum building-permit fee $50 (work over $5,000 or requiring inspection). | — | Generally allowed | A separate right-of-way permit is usually needed to cut the curb. Exempt: Replacing a driveway in the same footprint (no new curb cut) is generally exempt. |
| Colorado | Conditional | city | Building permit often not required; curb-cut/right-of-way work is separate. | — | Generally allowed | Mountain/WUI drainage and erosion-control rules may apply; right-of-way permit for curb cuts. Exempt: Replacing a driveway in the same footprint (no new curb cut) is generally exempt. |
| Connecticut | Conditional | city | Building permit often not required; curb-cut/right-of-way work is separate. | — | Generally allowed | A separate right-of-way permit is usually needed to cut the curb. Exempt: Replacing a driveway in the same footprint (no new curb cut) is generally exempt. |
| Delaware | Conditional | county | Building permit often not required; curb-cut/right-of-way work is separate. | — | Generally allowed | A separate right-of-way permit is usually needed to cut the curb. Exempt: Replacing a driveway in the same footprint (no new curb cut) is generally exempt. |
| Hawaii | Conditional | county | Building permit often not required; curb-cut/right-of-way work is separate. | Right-of-way permits reviewed by the county. | Generally allowed | A separate right-of-way permit is usually needed to cut the curb or connect to the street. Verify with the county. Exempt: Platforms, walks, and driveways not more than 30 in above grade are exempt. |
| Iowa | Conditional | city | Building permit often not required; curb-cut/right-of-way work is separate. | Right-of-way permits reviewed by the city/utility. | Generally allowed | A separate right-of-way permit is usually needed to cut the curb or connect to the street. Exempt: Replacing a driveway in the same footprint (no new curb cut) is generally exempt. |
| Idaho | Conditional | city | Building permit often not required; curb-cut/right-of-way work is separate. | Right-of-way permits reviewed by the city/county. | Generally allowed | A separate right-of-way permit is usually needed to cut the curb or connect to the street. Verify with the local building department. Exempt: Slabs/walks/driveways not more than 30 in above grade (and not over a basement) are exempt; concrete slabs are commonly exempt. |
| Kansas | Conditional | city | Building permit often not required; curb-cut/right-of-way work is separate. | Right-of-way permits reviewed by the city/utility. | Generally allowed | A separate right-of-way permit is usually needed to cut the curb or connect to the street. Exempt: Replacing a driveway in the same footprint (no new curb cut) is generally exempt. |
| Kentucky | Conditional | city | Building permit often not required; curb-cut/right-of-way work is separate. | Right-of-way permits reviewed by the city/utility. | Generally allowed | A separate right-of-way permit is usually needed to cut the curb or connect to the street. Exempt: Replacing a driveway in the same footprint (no new curb cut) is generally exempt. |
| Louisiana | Conditional | city | Building permit often not required; curb-cut/right-of-way work is separate. | Right-of-way permits reviewed by the parish/city. | Generally allowed | A separate right-of-way permit is usually needed to cut the curb or connect to the street. Exempt: Replacing a driveway in the same footprint (no new curb cut) is generally exempt. |
| Maine | Conditional | city | Building permit often not required; curb-cut/right-of-way work is separate. | Right-of-way permits reviewed by the town/road commissioner. | Generally allowed | A separate right-of-way/curb-cut permit is usually needed to connect to the street. Verify with the municipality. Exempt: Replacing a driveway in the same footprint (no new curb cut) is generally exempt. |
| Minnesota | Conditional | city | No building permit for private flatwork; a right-of-way/curb cut needs a separate permit. | Varies by municipality. | Generally allowed | A permit may be required for right-of-way/curb-cut work; verify with your municipal building department. |
| Mississippi | Conditional | city | No building permit for private flatwork where enforced; a right-of-way/curb cut may need a permit. Verify locally. | Varies by jurisdiction. | Generally allowed | A permit may be required for right-of-way/curb-cut work. Confirm with your local building department. |
| Montana | Conditional | city | No building permit for private flatwork where enforced; a right-of-way permit may be needed. Verify locally. | Where enforced, often over-the-counter. | Generally allowed | A permit may be required for right-of-way work. Confirm with your city building department. |
| North Dakota | Conditional | city | — | — | Generally allowed | A separate driveway/right-of-way permit is usually needed to cut the curb or connect to the street (city/county or NDDOT). Exempt: Sidewalks and driveways not over 30 in above grade and not over a basement are exempt (IRC R105.2). |
| Nebraska | Conditional | city | No building permit for private flatwork; a right-of-way/curb cut needs a separate permit. | Varies by municipality. | Generally allowed | A permit may be required for right-of-way/curb-cut work. Confirm with your municipal building department. |
| New Hampshire | Conditional | city | — | — | Generally allowed | A separate driveway/right-of-way permit is usually needed to cut the curb or connect to the street. Exempt: Replacing a driveway in the same footprint (no new curb cut) is generally exempt. |
| New Mexico | Conditional | city | — | — | Generally allowed | A separate driveway/right-of-way permit is usually needed to cut the curb or connect to the street (city/COUNTY or NMDOT). Exempt: Sidewalks and driveways not over 30 in above grade and not over a basement are exempt (NM Residential Code §105.2(5)). |
| Nevada | Conditional | city | Building permit often not required; curb-cut/right-of-way work is separate and may need a public-works permit. | Right-of-way permits reviewed by the city/county public works. | Generally allowed | A separate right-of-way permit is usually needed to cut the curb or connect to the street. Exempt: Clark County exempts walks/driveways not more than 30 in above grade and not over a basement. |
| Oklahoma | Conditional | city | Building permit often not required; curb-cut/right-of-way work is separate and may need a public-works permit. | Right-of-way permits reviewed by the city/public works. | Generally allowed | A separate right-of-way permit is usually needed to cut the curb or connect to the street; driveway permits require a state-licensed contractor in OKC. Exempt: Same-footprint driveway replacement generally exempt; new driveways and curb cuts need a permit/right-of-way approval. |
| Oregon | Conditional | city | Building permit often not required; curb-cut/right-of-way work is separate and may need a public-works permit. | Right-of-way permits reviewed by the city/public works. | Generally allowed | A separate right-of-way permit is usually needed to cut the curb or connect to the street. Exempt: Private concrete sidewalk/slab/driveway not >30 in above grade and not over a basement is exempt (statewide). |
| Rhode Island | Conditional | city | Building permit often not required under the exemption; curb-cut/right-of-way work is separate. | Right-of-way permits reviewed by the city/public works. | Generally allowed | A separate right-of-way permit is usually needed to cut the curb or connect to the street. Exempt: Sidewalks/driveways not >30 in above grade and not over a basement are exempt (statewide). |
| South Carolina | Conditional | city | Building permit often not required (sidewalks/driveways are broadly exempt in SC); curb-cut/right-of-way work is separate. | Right-of-way permits reviewed by the city/public works. | Generally allowed | A separate right-of-way permit is usually needed to cut the curb or connect to the street; Charleston enforces strict impervious-surface limits. Exempt: S.C. Code § 40-59-265 expressly exempts sidewalks and driveways (broader than the base IRC’s 30-in limit). |
| South Dakota | Conditional | city | Building permit often not required; curb-cut/right-of-way work is separate. | Right-of-way permits reviewed by the city/utility. | Generally allowed | A separate right-of-way permit is usually needed to cut the curb or connect to the street. Exempt: Replacing a driveway in the same footprint (no new curb cut) is generally exempt. |
| Utah | Conditional | city | Building permit often not required; curb-cut/right-of-way work is separate. | Right-of-way permits reviewed by the city/utility. | Generally allowed | A separate right-of-way permit is usually needed to cut the curb or connect to the street. Exempt: Replacing a driveway in the same footprint (no new curb cut) is generally exempt. |
| Vermont | Conditional | city | Building permit often not required; curb-cut/right-of-way work is separate. | Right-of-way permits reviewed by the town/utility. | Generally allowed | A separate right-of-way permit is usually needed to cut the curb or connect to the street. Exempt: Replacing a driveway in the same footprint (no new curb cut) is generally exempt. |
| West Virginia | Conditional | city | Building permit often not required; curb-cut/right-of-way work is separate. | Right-of-way permits reviewed by the city/utility. | Generally allowed | A separate right-of-way permit is usually needed to cut the curb or connect to the street. Exempt: Replacing a driveway in the same footprint (no new curb cut) is generally exempt. |
| Wyoming | Conditional | city | Building permit often not required; curb-cut/right-of-way work is separate. | Right-of-way permits reviewed by the city/utility. | Generally allowed | A separate right-of-way permit is usually needed to cut the curb or connect to the street. Exempt: Replacing a driveway in the same footprint (no new curb cut) is generally exempt. |