🍳 Kitchen Remodel permit in Montana

Renovating a kitchen — cabinets, counters, and often moving plumbing/electrical or load-bearing walls. Here is the Montana-specific rule: who issues it, typical fees, timeline, go / no-go, and the official source to verify.

Verify locally. Montana adopts the 2021 IRC (ARM 24.301.154) but MCA 50-60-102 exempts residential buildings with fewer than five dwelling units from the STATE building permit unless the local government has certified a building-code program. Billings, Missoula and about three dozen other cities (plus six counties) enforce locally; much of rural Montana has no structural building-permit requirement for single-family homes. State electrical (NEC), plumbing (UPC) and mechanical permits are required statewide regardless of location. Verify with your city building department or the MT DLI Building Codes Program. Rules below are Montana-level guidance drawn from official sources — always confirm with the issuing building department before starting work. See the county permit authorities to find the right office.

Kitchen Remodel permit in Montana

The Montana rule for a kitchen remodel, with fee range, timeline, go / no-go, and the official source.

Montana
🍳 Kitchen Remodel

Exact permit fees are set by the local building department. WikEst shows the published or code-based range where one exists, linked to its official source — verify the final amount at the source before budgeting.

🍳 Kitchen Remodel permit fee in Montana

ConditionalGenerally allowedcity authority
Permit fee range
Where enforced, a building permit plus trade permits apply; verify locally.
Typical timeline
Where enforced, typically several weeks for full plan review.
Setback
Exempt if
Not size-exempt
Relocating plumbing/electrical or moving walls requires a permit where a code is enforced. In non-certified areas, single-family homes are exempt from the state building permit but electrical/plumbing/mechanical permits are still required. Cosmetic-only work may be exempt.

Representative cities for Montana: Billings, Missoula.

All 20 project fee ranges in Montana

Official-source ranges where published; “By local jurisdiction” means no flat fee is published and the amount is set case by case.

ProjectPermit?AuthorityFee rangeGo / no-go
🏠 Accessory Dwelling Unit (ADU)conditionalcityWhere a certified city/county enforces, fees follow that jurisdiction; in non-certified areas a single-family home is exempt from the state building permit (trade permits still apply). Verify locally.case-by-case
🪵 Deck / PorchconditionalcityWhere enforced, fees follow the local schedule; verify locally.allowed
🧱 Fence / WallconditionalcityWhere enforced, fencing permits apply above local height limits; verify locally.allowed
🛖 Shed / OutbuildingconditionalcityWhere enforced, small detached sheds may be exempt; verify locally.allowed
🪜 Basement FinishconditionalcityWhere a certified city enforces, a building permit fee applies; in non-certified areas the state building permit is exempt for single-family homes (trade permits still apply). Verify locally.allowed
🚗 Garage / CarportconditionalcityWhere enforced, attached garages (additions) are permitted; verify locally.allowed
☀️ Rooftop Solar PVyesstateElectrical permit required statewide by the MT DLI Building Codes Program (NEC); local jurisdictions may also be involved.allowed
🌡️ HVAC ReplacementyesstateMechanical permit required statewide by the MT DLI Building Codes Program; licensed contractors perform the work.allowed
🍳 Kitchen RemodelconditionalcityWhere enforced, a building permit plus trade permits apply; verify locally.allowed
🛁 Bathroom RemodelconditionalcityWhere enforced, a building permit plus trade permits apply; verify locally.allowed
🏗️ Room AdditionconditionalcityWhere a certified city enforces, a building permit based on valuation applies; in non-certified areas the state building permit is exempt for single-family homes (trade permits still apply). Verify locally.allowed
🪟 Window / Door ReplacementconditionalcityWhere enforced, a permit fee applies if enlarging the opening; in-kind swap often exempt. Verify locally.allowed
🏘️ Roof ReplacementconditionalcityWhere enforced, an in-kind re-roof may be exempt; structural deck replacement requires a permit. Verify locally.allowed
🅿️ Driveway / Parking PadconditionalcityNo building permit for private flatwork where enforced; a right-of-way permit may be needed. Verify locally.allowed
🏊 Swimming Pool / SpaconditionalcityWhere enforced, a building permit plus barrier fencing applies; verify locally.allowed
🧱 Retaining WallconditionalcityWhere enforced, a permit applies if over 4 ft; verify locally.allowed
💥 Demolition / TeardownyescityDemolition permit fee set by the issuing authority; verify locally.allowed
🚰 Septic SystemyescountySeptic permit fee set by the local environmental/health authority; engineered systems cost more.allowed
🔌 EV ChargerconditionalcityElectrical permit; fee set by the issuing authority.allowed
Standby GeneratorconditionalcityMechanical/electrical permit; fee set by the issuing authority.allowed

Montana rule at a glance

Needs permit
conditional
Issuing authority
city
Typical fee
Where enforced, a building permit plus trade permits apply; verify locally.
Typical timeline
Where enforced, typically several weeks for full plan review.
Setback
Exempt if
Not size-exempt
Relocating plumbing/electrical or moving walls requires a permit where a code is enforced. In non-certified areas, single-family homes are exempt from the state building permit but electrical/plumbing/mechanical permits are still required. Cosmetic-only work may be exempt.

Frequently asked questions

Does a kitchen remodel need a permit in Montana?

In Montana, a kitchen remodel is conditional / size-dependent. Issuance is at the city level. Confirm the exact threshold with the local building department using the sources on this page.

Who issues the kitchen remodel permit in Montana?

Montana permits for this project are handled at the city level — usually the city or county building department. Use the county permit authority lookup to find the exact office for your property.

How much does a kitchen remodel permit cost in Montana?

Fees are set locally in Montana and are not a single statewide number. Open the official authority link on this page for the current schedule.

What exemptions apply to a kitchen remodel in Montana?

Baseline exemptions (e.g. small detached structures, low decks) may apply but Montana or your city can amend them. Verify with the local building department.

Kitchen Remodel in other states

StatePermit?AuthorityTypical feeTimelineGo / No-GoKey notes
CaliforniaPermit requiredcityBuilding + electrical + plumbing permit fees. Verify with the city building department.2–6 weeks.Generally allowedMoving plumbing/electrical or walls triggers permits; California Title 24 appliance and ventilation requirements apply.
Exempt: N/A
TexasPermit requiredcityBuilding + electrical + plumbing permit fees. Verify with the city building department.2–6 weeks.Generally allowedMoving plumbing/electrical or walls triggers permits.
Exempt: N/A
FloridaPermit requiredcityBuilding + electrical + plumbing permit fees. Verify with the city building department.2–6 weeks.Generally allowedMoving plumbing/electrical or walls triggers permits.
Exempt: N/A
New YorkPermit requiredcityBuilding + electrical + plumbing permit fees. Verify with the city building department.NYC: ALT2 review, several weeks.RestrictedNYC: kitchen/bath renovation needs an ALT2 permit filed by a NYS-licensed PE or RA; upstate follows similar building-permit rules.
Exempt: N/A
PennsylvaniaPermit requiredcityBuilding permit fee; trade permits (plumbing/electrical) billed separately.Generally allowedA permit is required when relocating plumbing/electrical, moving walls, or changing fixtures. Cosmetic-only work (cabinets, counters, paint) may be exempt.
IllinoisPermit requiredcityBuilding permit fee; trade permits billed separately.Generally allowedA permit is required when relocating plumbing/electrical, moving walls, or changing fixtures. Cosmetic-only work may be exempt.
OhioPermit requiredcityBuilding permit fee; Columbus minimum $125, trade permits billed separately.Generally allowedA permit is required when relocating plumbing/electrical, moving walls, or changing fixtures. Cosmetic-only work may be exempt.
GeorgiaPermit requiredcityBuilding permit fee; Atlanta minimum $150 plus $25 fee, trade permits billed separately.Generally allowedA permit is required when relocating plumbing/electrical, moving walls, or changing fixtures. Cosmetic-only work may be exempt.
North CarolinaPermit requiredcityBuilding + trade permits based on valuation; verify with the city.Plan review typically 2–4 weeks plus trade inspections.Generally allowedKitchen remodels moving plumbing/electrical or altering walls require building, plumbing, and electrical permits.
Exempt: Any layout/plumbing/electrical change requires a permit.
MichiganPermit requiredcityBuilding + trade permits based on valuation; verify with the city.Plan review typically 2–4 weeks plus trade inspections.Generally allowedKitchen remodels moving plumbing/electrical or altering walls require building, plumbing, and electrical permits.
Exempt: Any layout/plumbing/electrical change requires a permit.
New JerseyPermit requiredcityConstruction + trade permits based on valuation; verify with the city.Plan review commonly up to 20 business days plus trade inspections.Generally allowedKitchen remodels moving plumbing/electrical or altering walls require construction, plumbing, and electrical permits.
Exempt: Any layout/plumbing/electrical change requires a permit.
VirginiaPermit requiredcityBuilding + trade permits based on valuation; verify with the city.Plan review ~10 business days plus trade inspections.Generally allowedKitchen remodels moving plumbing/electrical or altering walls require building, plumbing, and electrical permits.
Exempt: Any layout/plumbing/electrical change requires a permit.
WashingtonConditionalcityValuation-based when structural/plumbing/electrical work is included.Standard review 4–8 weeks for permitted scopes.Generally allowedVerify whether walls are load-bearing before any layout change.
Exempt: Cabinet/countertop swap in the same layout is exempt.
ArizonaConditionalcityValuation-based when structural/plumbing/electrical work is included.Standard review for permitted scopes.Generally allowedPhoenix energy code is strict on remodels (insulation, window U-factor, HVAC).
Exempt: Cabinet/countertop swap in the same layout is exempt.
MassachusettsConditionalcityValuation-based when structural/plumbing/electrical work is included.Worcester: ~2–3 weeks for full remodels.Generally allowedFull remodels pull separate plumbing/electrical sub-permits.
Exempt: Cabinet/countertop swap in the same layout is exempt.
TennesseeConditionalcityValuation-based when structural/plumbing/electrical work is included.Standard review for permitted scopes.Generally allowedFull remodels pull separate plumbing/electrical/mechanical sub-permits.
Exempt: Cabinet/countertop swap in the same layout is exempt.
IndianaPermit requiredcityBuilding permit fee; trade permits (plumbing/electrical) billed separately.Generally allowedA permit is required when relocating plumbing/electrical, moving walls, or changing fixtures. Cosmetic-only work may be exempt.
MissouriPermit requiredcityBuilding permit fee; trade permits (plumbing/electrical) billed separately.Varies by municipality — typically several weeks for full plan review.Generally allowedA permit is required when relocating plumbing/electrical, moving walls, or changing fixtures. Cosmetic-only work (cabinets, counters, paint) may be exempt.
MarylandPermit requiredcityBuilding permit fee; trade permits billed separately.Generally allowedA permit is required when relocating plumbing/electrical, moving walls, or changing fixtures.
WisconsinPermit requiredcityBuilding permit fee; trade permits (plumbing/electrical) billed separately.Varies by municipality — typically several weeks for full plan review.Generally allowedA permit is required when relocating plumbing/electrical, moving walls, or changing fixtures. Cosmetic-only work (cabinets, counters, paint) may be exempt.
AlaskaConditionalcityValuation-based when structural, plumbing, or electrical work is included.Generally allowedCold-climate envelope and ventilation requirements follow the Alaska energy code.
AlabamaConditionalcityValuation-based when structural, plumbing, or electrical work is included.Generally allowedVerify with the local building department before altering layouts.
ArkansasConditionalcityValuation-based; Little Rock minimum building-permit fee $50 (work over $5,000 or requiring inspection).Generally allowedVerify with the local building department before altering layouts.
ColoradoConditionalcityValuation-based when structural, plumbing, or electrical work is included.Generally allowedEnergy-code triggers apply to remodels.
ConnecticutConditionalcityValuation-based when structural, plumbing, or electrical work is included.Generally allowedVerify with the local building official before altering layouts.
DelawareConditionalcountyValuation-based when structural, plumbing, or electrical work is included.Generally allowedVerify with the local building department before altering layouts.
HawaiiConditionalcountyValuation-based when structural/plumbing/electrical work is included.Standard review for permitted scopes.Generally allowedHawaii’s energy code is reviewed on remodels (insulation, window U-factor, HVAC). Verify with the county building department.
Exempt: Cabinet/countertop swap in the same layout is exempt.
IowaConditionalcityValuation-based when plumbing/electrical/structural work is included.Standard review for permitted scopes.Generally allowedIowa radon-resistant new construction (Appendix AF of the 2021 IRC) becomes required for new homes from July 1, 2026 — relevant to kitchen ventilation/rough-ins.
Exempt: Cabinet/countertop swap in the same layout is exempt.
IdahoConditionalcityValuation-based when structural/plumbing/electrical work is included.Standard review for permitted scopes.Generally allowedIdaho’s energy code is reviewed on remodels. Verify with the local building department.
Exempt: Cabinet/countertop swap in the same layout is exempt.
KansasConditionalcityValuation-based when plumbing/electrical/structural work is included.Standard review for permitted scopes.Generally allowedWhere no local code is adopted, a kitchen remodel may need no permit — verify with the city/county.
Exempt: Cabinet/countertop swap in the same layout is exempt.
KentuckyConditionalcityValuation-based when plumbing/electrical/structural work is included.Standard review for permitted scopes.Generally allowedThe KRC is a "mini/maxi" code — local governments may not adopt a different residential code.
Exempt: Cabinet/countertop swap in the same layout is exempt.
LouisianaConditionalcityValuation-based when plumbing/electrical/structural work is included.Standard review for permitted scopes.Generally allowedNew Orleans historic-district properties need VCC/HDLC approval before work.
Exempt: Cabinet/countertop swap in the same layout is exempt.
MaineConditionalcityValuation-based when structural/plumbing/electrical work is included.Standard review for permitted scopes (1–4 weeks).Generally allowedMaine’s energy code (stricter insulation/air-sealing) is triggered on substantial renovations. Verify with the Code Enforcement Officer.
Exempt: Cabinet/countertop swap in the same layout is exempt.
MinnesotaPermit requiredcityBuilding permit fee; trade permits (plumbing/electrical) billed separately.Varies by municipality — typically several weeks for full plan review.Generally allowedA permit is required when relocating plumbing/electrical, moving walls, or changing fixtures. Cosmetic-only work (cabinets, counters, paint) may be exempt.
MississippiConditionalcityWhere enforced, a building permit plus trade permits apply; verify locally.Varies by jurisdiction.Generally allowedRelocating plumbing/electrical or moving walls requires a permit where a code is enforced. Cosmetic-only work may be exempt. Confirm with your local building department.
North DakotaConditionalcityGenerally allowed2024 IECC energy requirements are triggered on remodels. Verify scope with your local building department.
Exempt: Cabinet/countertop swap in the same layout is exempt.
NebraskaPermit requiredcityBuilding permit fee; trade permits (plumbing/electrical) billed separately.Varies by municipality — typically several weeks for full plan review.Generally allowedA permit is required when relocating plumbing/electrical, moving walls, or changing fixtures. Cosmetic-only work may be exempt.
New HampshireConditionalcityGenerally allowedNH energy code is triggered on remodels (insulation, window U-factor, HVAC). Verify scope with the local building department.
Exempt: Cabinet/countertop swap in the same layout is exempt.
New MexicoConditionalcityGenerally allowedNM Energy Conservation Code is triggered on remodels. Verify scope with your local building department or CID.
Exempt: Cabinet/countertop swap in the same layout is exempt.
NevadaConditionalcityValuation-based when structural/plumbing/electrical work is included.Standard review for permitted scopes.Generally allowedNevada energy code applies to remodels (insulation, window U-factor, HVAC).
Exempt: Cabinet/countertop swap in the same layout is exempt.
OklahomaConditionalcityValuation-based when structural/plumbing/electrical work is included.Standard review for permitted scopes.Generally allowedPlumbing follows the IPC 2018 with OK amendments; electrical follows NEC 2023 with OK amendments.
Exempt: Cabinet/countertop swap in the same layout is exempt.
OregonConditionalcityValuation-based when structural/plumbing/electrical work is included.Standard review for permitted scopes.Generally allowedPlumbing follows the Oregon Plumbing Specialty Code; electrical follows the Oregon Electrical Specialty Code (separate from the ORSC).
Exempt: Cabinet/countertop swap in the same layout is exempt.
Rhode IslandConditionalcityValuation-based when structural/plumbing/electrical work is included (statewide formula, $125 min).Standard review for permitted scopes.Generally allowedRenovations in older homes can trigger energy-code upgrade requirements for the space.
Exempt: Cabinet/countertop swap in the same layout is exempt (cosmetic finish work).
South CarolinaConditionalcityValuation-based when structural/plumbing/electrical work is included.Standard review for permitted scopes.Generally allowedRenovations that change layout or systems require permits; plumbing under the 2021 IPC with SC modifications.
Exempt: Cabinet/countertop swap in the same layout is exempt (finish work).
South DakotaConditionalcityValuation-based when structural/plumbing/electrical work is included.Standard review for permitted scopes.Generally allowedSioux Falls/Rapid City generally require permits when systems are altered; cosmetic refreshes do not.
Exempt: Cabinet/countertop swap in the same layout is exempt.
UtahConditionalcityValuation-based when structural/plumbing/electrical work is included.Standard review for permitted scopes.Generally allowedUtah’s amended energy code applies to alterations that trigger it (insulation, window U-factor, HVAC).
Exempt: Cabinet/countertop swap in the same layout is exempt.
VermontConditionalcityValuation-based when structural/plumbing/electrical work is included, where enforced.Standard review for permitted scopes.Generally allowedWhere the RBES is triggered, energy-code requirements apply even in opt-out towns (RBES is mandatory statewide).
Exempt: Cabinet/countertop swap in the same layout is exempt.
West VirginiaConditionalcityValuation-based when structural/plumbing/electrical work is included.Standard review for permitted scopes.Generally allowedCharleston issues permits for kitchen remodels that alter systems; cosmetic refreshes do not.
Exempt: Cabinet/countertop swap in the same layout is exempt.
WyomingConditionalcityValuation-based when structural/plumbing/electrical work is included, where enforced.Standard review for permitted scopes.Generally allowedWhere the energy code is triggered, efficiency requirements apply; cosmetic refreshes do not require a permit.
Exempt: Cabinet/countertop swap in the same layout is exempt.
The WikEst Editorial Team · Updated 2026-08-15
Compiled and reviewed by the WikEst editorial team from official state and municipal building-department publications.